Road Closed at Undercliff Drive

Roadworks and road closures: 5th December 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

B3323 St James Street, Newport, Isle Of Wight
05 December — 18 December
Delays likely Traffic control (two-way signals)
Works location: Newport: From Hunnyhill, South To Junction Of High Street (Ml 220143):
Works description: Install N? 8 Lanterns (N? 6 Columns & 2 Wall Brackets) 2 Bus Stops, 2 Cctv Signs, 1 No Waiting Sign, 1 No Waiting/Loading Sign, 2 Route/Direction Signs & 4 Warning Signs Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 High Street, Shanklin, Isle Of Wight
05 December — 08 December
Delays possible Some carriageway incursion
Works location: 69 High Street
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Sandown Road, Shanklin, Isle Of Wight
05 December — 08 December
Delays possible Some carriageway incursion
Works location: Hazardous Site Section 81/Cch Ref1628826 O/S 140, Sandown Road
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Horestone Rise, Nettlestone, Isle Of Wight
05 December — 18 December
Delays possible Traffic control (two-way signals)
Works location: Nettlestone: Whole Length Of Road From Gully Road (Ml 340554): Horestone Rise-Nettlestone
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr : Bit Partrecon) Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Linkside, Lake, Isle Of Wight
05 December — 18 December
Delays possible Traffic control (two-way signals)
Works location: Lake: Whole Length Of Road From Roseway (Ml 461420): Linkside-Lake
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr : Bit Fullrecon) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Puckpool Hill, Seaview, Isle Of Wight
05 December — 05 December
Delays possible Traffic control (two-way signals)
Works location: Puckpool Hill Jcn Puckpool Close Seaview Isle Of Wight Po33 1pd
Works description: Access Required To Underground Bt Structure To Provide Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning

Vicarage Walk, Newport, Isle Of Wight
05 December — 18 December
Delays possible Traffic control (two-way signals)
Works location: Newport: From Junction Of Hunnyhill, South West To Junction Of Sylvan Drive (Ml 230338 & Ml 230333):
Works description: Install N? 4 Lanterns (N? 3 Columns) 2 Bus/Tram/Cycle Facilities Sign. 1 No Waiting Sign & 1 Route/Direction Sign Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 River Road, Yarmouth, Isle Of Wight
05 December — 12 December
Delays unlikely No carriageway incursion
Works location: 12m West From Jcn Mill Road At S/O Primary School, River Road
Works description: Build 1 Concrete Chamber 2315mm X 737mm X 1565mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S),Install 6m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Avondale Road, Newport, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 33 Avondale Rd
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Berry Close, Newport, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 6, Berry Close, Newport, Iow
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Whitcombe Road, Newport, Isle Of Wight
05 December — 10 December
Delays unlikely No carriageway incursion
Works location: Jcn Of Sandy Lane On , Whitcombe Road
Works description: Build 1 Concrete Chamber 2315mm X 737mm X 1565mm Deep In Footway
Responsibility for works: BT
Current status: Advanced planning

Sea Street, Newport, Isle Of Wight
05 December — 18 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From Quay Street, West To Column 4 (Ml 240284):
Works description: Install N? 3 Lanterns (N? 3 Columns) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Yarborough Road, East Cowes, Isle Of Wight
05 December — 18 December
Delays unlikely Some carriageway incursion
Works location: O/S 1
Works description: Scaffold (Upright Scaffold Services)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hatherton Road, Shanklin, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 7 Hatherton Rd
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Howgate Road, Bembridge, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 101 Howgate Rd
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

King James Close, Cowes, Isle Of Wight
05 December — 18 December
Delays unlikely Traffic control (give & take)
Works location: Cowes: Whole Length From Crossfield Avenue (Ml 160154): King James Close-Cowes
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Millward Place, Ryde, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 99 Sandcroft Ave
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Priory Road, Shanklin, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: Jnc Vaughan Way To O/S Fezziwig, Priory Road
Works description: Interim To Perm Sites To Replace Lines As Per Ha Defect
Responsibility for works: BT
Current status: Advanced planning

Riverway, Newport, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 17b River Way
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Simeon Street, Ryde, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 21 Simeon Street
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

St Cross Lane, Newport, Isle Of Wight
05 December — 18 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From Hunnycross Way, South To Second Column (Ml 220148):
Works description: Install N? 2 Lanterns (N? 2 Columns) 1 Warning Sign Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Upper Moorgreen Road, Cowes, Isle Of Wight
05 December — 08 December
Delays unlikely Some carriageway incursion
Works location: 76, Upper Moorgreen Rd, Cowes, Po317lf
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

West View, Newport, Isle Of Wight
05 December — 18 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From South View, North To Trafalgar Road (Ml 240222):
Works description: Install N? 2 Lanterns (N? 1 Column) 1 Route/Direction Sign & 1 No Waiting Sign Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning