Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
Brooks Close, Bembridge, Isle Of Wight
06 June — 30 June
Delays likely Road closure
Works location: Bembridge: From Egerton Road To Wavesound Close (Ml340272): Brooks Close-Bembridge:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Staplers Road, Newport, Isle Of Wight
06 June — 30 June
Delays likely Road closure
Works location: Newport: From Long Lane 210m East (Ml220136): Staplers Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Rseurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Palmers Lane, Newchurch, Isle Of Wight
05 June — 30 June
Delays likely Road closure
Works location: Newchurch: From Winford Road 457m East (Ml440433): Palmers Lane-Newchurch:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Newchu
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Quay Lane, Brading, Isle Of Wight
05 June — 12 August
Delays likely Road closure
Works location: 1 Quay Lane,Brading,Iow.
Works description: Renew Existing 12″ Water Main With New 355mm Hppe Main From High Street Jct Quay Lane To Marsh Cottage At The End Of Quay Lane.
Responsibility for works: Southern Water
Current status: Advanced planning
Sandy Lane, Newport, Isle Of Wight
05 June — 06 June
Delays likely Road closure
Works location: Newport: Opposite Wheatstone Cottage (100m From Hollow Jct): Sandy Lane-Newport:; Scheduler Ops Hub
Works description: Ops To Fill Edge Deterioration. 20×0.4mtr 60mm At Deepest. Tm-Temp Road Closure. (Cw: Pothole) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Skinners Hill, Newchurch, Isle Of Wight
05 June — 30 June
Delays likely Road closure
Works location: Newchurch: From Hill Farm Entrance 250m West (Ml440435): Skinners Hill-Newchurch:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Newchu
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Broadway, Sandown, Isle Of Wight
06 June — 30 June
Delays possible
Works location: Sandown: From Grove Road To Queens Road (Ml410049): Broadway-Sandown:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H1, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H1) Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Mitchell Avenue, Ventnor, Isle Of Wight
06 June — 19 June
Delays possible Traffic control (two-way signals)
Works location: Ventnor: From Ocean View Drive, East To St Boniface Road (Ml 520066 And Ml 520067): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 16 Lanterns (No 14 Columns) 2 Warning Signs And 1 Lit Vehicle Activated Sign Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Canteen Road, Newchurch, Isle Of Wight
05 June — 05 June
Delays possible Traffic control (two-way signals)
Works location: Outside Meadow View On Canteen Road Newchurch Isle Of Wight Po38 3ae
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning