Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
B3399 Brighstone Road, Brook, Isle Of Wight
06 August — 13 September
Delays likely Road closure
Works location: Brook: From A Point 120m West, To A Point 130m East Of Hulverstone Lane (Ml630117): Brighstone Road-Brook:; Cw Cip Schem
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Brook
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
06 August — 30 August
Delays likely Road closure
Works location: Binstead: From Pitts Lane To Ladies Walk (Ml342319): Church Road-Binstead:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
06 August — 30 August
Delays likely Road closure
Works location: Binstead: From Pitts Lane To Quarr Road (Ml340503): Church Road-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Clatterford Shute, Newport, Isle Of Wight
06 August — 06 September
Delays likely Road closure
Works location: Newport: From Clatterford Road To Millers Lane (Ml240241): Clatterford Shute-Newport:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Grove Road, Ventnor, Isle Of Wight
07 August — 30 August
Delays likely Road closure
Works location: Ventnor: From Mitchell Avenue To Spring Hill (Ml540174): Grove Road-Ventnor:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Oaklyn Gardens, Shanklin, Isle Of Wight
06 August — 06 September
Delays likely Road closure
Works location: Shanklin: From Witbank Gardens 250m North East Thereof (Ml440277): Oaklyn Gardens-Shanklin:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pitts Lane, Binstead, Isle Of Wight
07 August — 22 August
Delays likely Road closure
Works location: Binstead: From Church Road 275m South (Ml340585): Pitts Lane-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
The Fairway, Lake, Isle Of Wight
07 August — 07 September
Delays likely Road closure
Works location: Lake: From Roseway To Station Approach (Ml420205): The Fairway-Lake:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Recon Struction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 Pyle Street, Newport, Isle Of Wight
06 August — 08 August
Delays possible Some carriageway incursion
Works location: Kandy Box, Pyle Street
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
B3330 St Johns Road, Ryde, Isle Of Wight
07 August — 27 August
Delays possible Some carriageway incursion
Works location: Bedford Lodge
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Winford Road, Newchurch, Isle Of Wight
06 August — 14 August
Delays possible Traffic control (two-way signals)
Works location: Os Sunnybrow
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning
Whitwell Road, Godshill, Isle Of Wight
06 August — 07 August
Delays possible Traffic control (two-way signals)
Works location: Godshill: 20 Metres North Of Bt Pole A3.: :; Scheduler Ops Hub
Works description: Gully Grille Broken And Needs Replacement. Tm – Very Busy, Fast Road 2 Way T/L’S Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning