Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
Brook Village Road, Brook, Isle Of Wight
08 August — 08 September
Delays likely Road closure
Works location: Brook: From Military Road 290m North (Ml630195): Brook Village Road-Brook:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3) Brook
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Furrlongs, Newport, Isle Of Wight
08 August — 08 September
Delays likely Road closure
Works location: Newport: From Royal Exchange 260m East (Ml230260): Furrlongs-Newport:; Eric Longworth
Works description: Carriageway Erconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Victoria Road, Newport, Isle Of Wight
08 August — 08 September
Delays likely Road closure
Works location: Newport: From Cross Lane To Fairlee Road (Ml240275): Victoria Road-Newport:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Clarence Road, Wroxall, Isle Of Wight
08 August — 11 August
Delays possible Traffic control (two-way signals)
Works location: Wroxall: S/B C/Way Just Before The National Speed Limit Sign On Leaving Wroxall: Clarence Road-Wroxall – 9188:; Schedule
Works description: Idr – Loose And Rattling Gully Cover Tm – Two Way Temp Lights (Gl: Ironwork Rocking/Corrosion) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Ashey Road, Ryde, Isle Of Wight
08 August — 21 August
Delays possible Traffic control (two-way signals)
Works location: Ryde: From Upton Road, South To End Light (Ml 320221, Ml 320223, Ml 320224, Ml 320225 And Ml 330211): :; Sl Cip Scheme S
Works description: Install No 18 Lanterns (No 6 Columns) 1 Bus Stop, 2 Route/Direction Signs, 2 Warning Signs, 1 Large Lit Vehicle Activated Sign And 1 Large Lit School Sign Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Image: © With kind permission of Allan Marsh