Road Closed Sign

Roadworks and road closures: 11th June

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 High Street, Brading, Isle Of Wight
12 June — 25 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Install N? 16 Lanterns (N? 6 Columns) 1 Bus Stop, 3 Warning Signs, 2 Lit Warning Signs & 1 Let Vehicle Activated Sign Brading at Brading: From Junction Of Coach Lane, South To Junction Of The Mall (Ml 310038, Ml 310039 & Ml 340639):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Somerset Road Heading North To Arundel Road (Ml 310053): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Arundel Road Heading North To Appley Road (Ml 310054): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Salisbury Road Heading North To Somerset Road (Ml 310052): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Great Preston Road Heading North To Salisbury Road (Ml 310051): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Rowborough Lane, Brading, Isle Of Wight
12 June — 25 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) 1 Warning Sign Brading at Brading: From Junction Of Coach Lane, North To Second Column (Ml 310042):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Apse Manor Road, Shanklin, Isle Of Wight
12 June — 17 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4 Shanklin at Shanklin: From Junction Of Ventnor Road 462m South (Ml 440226): Apse Manor Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Apse Manor Road, Shanklin, Isle Of Wight
12 June — 17 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4 Shanklin at Shanklin: From 462m South Of Ventnor Road To 819m South Of Ventnor Road (Ml 440225): Apse Manor Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
11 June — 15 June Road closure
Delays likely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct. at In Fw Opp 50, High Street
Responsibility: BT
EToN status: Advanced planning

B3327 Mitchell Avenue, Ventnor, Isle Of Wight
12 June — 10 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Ventno at Ventnor: From Macrocarpa Road To Old Station Road (Ml 520067): Mitchell Avenue-Ventnor:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Orchard Close, Freshwater, Isle Of Wight
12 June — 12 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4 F1 Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4 (Kerbed=Inlay/Unkerbed=Overlay) Freshwater at Freshwater: From Hooke Hill To The End Of The Road (Ml 641583): Orchard Close-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
11 June — 12 June Some carriageway incursion
Delays unlikely due to Streetworks
Reinstatement To Be Carried Out On Interim Site at (Pcp9) Rear Of 1 To 14 Brookelands Queens Road On , School Green Road
Responsibility: BT
EToN status: Advanced planning

B3321 Adelaide Grove, East Cowes, Isle Of Wight
11 June — 19 June Some carriageway incursion
Delays unlikely due to Streetworks
Lay New Service From Nearside Footway To Site at Os 78
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

B3341 Castle Road, Newport, Isle Of Wight
12 June — 19 June Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 43733 at Os 68
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

Quay Street, Newport, Isle Of Wight
12 June — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S Turquoise
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Solent View Road, Gurnard, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
-Remdial Reinstatement On Sucken Patch at 21, Solent View Rd, Cowes
Responsibility: Southern Water
EToN status: Advanced planning

Cherrywood View, Arreton, Isle Of Wight
12 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 7 Lanterns (N? 7 Columns) Arreton at Arreton: From Arreton Street, North, Then East & West To Dead Ends (Ml 410060 & Ml 410061):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Crescent Road, Shanklin, Isle Of Wight
11 June — 15 June No carriageway incursion
Delays unlikely due to Streetworks
Excavate 1 Location (S) To Expose/ Repair Existing Ducts In Footway,Install 1m Of 1 Way Poly Duct In Footway at O/S Samantha Court, Crescent Road
Responsibility: BT
EToN status: Advanced planning

Elm Close, Ryde, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 15, Elm Cl, Ryde
Responsibility: Southern Water
EToN status: Advanced planning

Hyde Road, Shanklin, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 24, Hyde Rd, Shanklin, Po377le
Responsibility: Southern Water
EToN status: Advanced planning

Orchard Road, Nettlestone, Isle Of Wight
11 June — 15 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Nettlestone at Nettlestone: From The Glade To Cedarwood Drive (Ml 340455): Orchard Road-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Perowne Way, Sandown, Isle Of Wight
11 June — 12 June No carriageway incursion
Delays unlikely due to Streetworks
Minor Remedial To Rectify Ha Defect. at (Pcp23) 459394,084842 Opposite 87a, Perowne Way
Responsibility: BT
EToN status: Advanced planning

Sherbourne Avenue, Ryde, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
-Interim To Perm Reinstatement at 15, Sherbourne Ave, Ryde
Responsibility: Southern Water
EToN status: Advanced planning

St Johns Road, Sandown, Isle Of Wight
11 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Mr Skippy) at O/S 40
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Wilkes Road, Sandown, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Service at 3 Wilkes Road , Sandown, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Woodvale Road, Gurnard, Isle Of Wight
12 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Farside Footway To Site at Os 9
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

Image: Nateone under CC BY 2.0