Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Albert Road / Victoria Road, Sandown.
13 January — 14 January
Delays likely due to Streetworks
Road closure at B3329 Albert Road, Sandown, Isle of Wight (Albert Road / Victoria Road, Sandow.) 13 January — 14 January
Diversion route at B3329 High Street, Sandown, Isle of Wight (Albert Road / Victoria Road, Sandow.) 13 January — 14 January
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
B3325 High Street, Cowes, Isle of Wight
12 January — 14 January
Delays likely due to Streetworks
Road closure at B3325 High Street, Cowes, Isle of Wight (High Street, Cowes) 12 January — 14 January
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Upper Green Rd junction with The Diggings, St Hele
13 January — 13 January
Delays likely due to Streetworks
Road closure at B3330 Upper Green Road, St Helens, Isle of Wight (Upper Green Rd junction with The Diggings, St Hele) 13 January — 13 January
Diversion route at B3330 Upper Green Road, St Helens, Isle of Wight (Upper Green Rd junction with The Diggings, St Hele) 13 January — 13 January
HGV Diversion route at B3330 Upper Green Road, St Helens, Isle of Wight (Upper Green Rd junction with The Diggings, St Hele) 13 January — 13 January
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
A3020 Newport Road, Cowes, Isle of Wight
13 January — 24 March
Delays likely due to Streetworks
Road closure at A3020 Newport Road, Cowes, Isle of Wight (A3020 Newport Road, Cowes.) 13 January — 24 March
Diversion route at A3020 Newport Road, Cowes, Isle of Wight (A3020 Newport Road, Cowes.) 13 January — 24 March
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
A3020 Newport Road, Northwood, Isle Of Wight
12 January — 14 January Traffic control (multi-way signals)
Delays likely due to Streetworks
Sawcut And Infill Idr – P/H .70 X .30 X 35mm Tm – Four Way Temp Lights (Cw: Pothole) H1 Urban Northwood at Northwood: O/S No.355 Just Before The Horseshoe Ph On The Nearside Tyreline: Newport Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3020 St Georges Way, Newport, Isle Of Wight
13 January — 13 January Traffic control (two-way signals)
Delays likely due to Streetworks
Sub Con Dares Cctv Drainage Survey Tm 2 Way Lights Newport at Newport: Near To The Entrance Of Newport Football Club: St Georges Way-Newport – 8161
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 North Road, Shanklin, Isle Of Wight
13 January — 21 January Traffic control (multi-way signals)
Delays likely due to Streetworks
Lay New Services From Nearside Carriageway Along Footwayto Site at From Outside 66 To 68 New Plots
Responsibility: SGN
EToN status: Advanced planning
A3056 Blackwater Shute, Arreton, Isle Of Wight
12 January — 14 January Traffic control (multi-way signals)
Delays likely due to Streetworks
28 Day Perm Required Sawcut And Infill 1.0 X .25 X 60mm Temp Repair Made By Dss – Rr On 31/12/15 Tm – For Follow Up Repair – Three Way Temp Lights (Cw: Pothole) Arreton at Arreton: Deep Pothole On Main Road At Wbm Turning Near Centreline On Sandown Bound Side Of C/Way: Blackwater Shute-Arret
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3323 Carisbrooke Road, Newport, Isle Of Wight
13 January — 15 January Traffic control (give & take)
Delays likely due to Streetworks
Install N? 2 Lanterns (N? 1 Column) 1 Cctv Camera & 1 Cctv Sign Newport at Newport: From High Street, South West To Column 1 (Ml 210075):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3323 St James Street, Newport, Isle Of Wight
12 January — 14 January Traffic control (give & take)
Delays likely due to Streetworks
Install N? 2 Lanterns (N? 1 Column) 1 Route/Direction Sign Newport at Newport: Opposite The Junction Of South Street (Ml 210079):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3330 Upper Green Road, St Helens, Isle Of Wight
13 January — 18 January Road closure
Delays likely due to Streetworks
– Replace Cover And Frame In Carriageway at Post Office, Upper Green Road, St. Helens
Responsibility: Southern Water
EToN status: Advanced planning
A3055 George Street, Ryde, Isle Of Wight
13 January — 15 January Traffic control (two-way signals)
Delays possible due to Streetworks
Core And Trial Pit Investigations Ryde at Ryde: (Ml310030) Working Between Esplanade To Cross Street. Ch142, Ch180 Outsides St Magarets Court, Ch 235 Opposite Kee
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3325 Park Road, Cowes, Isle Of Wight
13 January — 17 January Traffic control (multi-way signals)
Delays possible due to Streetworks
Trial Pit Excavation Cowes at Cowes: Ml 110050 Ch76, Ch100 & Ch167 Between The Junctions Of Victoria Road And Granville Road: Park Road-Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Briddlesford Road, Newport, Isle Of Wight
12 January — 14 January Traffic control (multi-way signals)
Delays possible due to Streetworks
Sawcut And Infill Idr -P/H In Anti Skid .40 X .35 X 35mm Tm – G & T H1 Rural Newport at Newport: At The End Of The Road On The Mini Roundabout In The East Cowes Bound Side Of The C/Way: Briddlesford Road-Newp
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Baring Road, Cowes, Isle Of Wight
13 January — 13 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Cowes at Cowes: (Ml 130096) Between Crossfield Avenue To The Junction With Tuttons Hill: Baring Road-Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Egypt Esplanade, Cowes, Isle Of Wight
13 January — 13 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Cowes at Cowes: From 280 Metres Southwest Of Egypt Hill To 600 Metres Southwest Of Egypt Hill (Ml130116) : Egypt Esplanade-Cow
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Whitecross Lane, Lake, Isle Of Wight
13 January — 14 January Traffic control (two-way signals)
Delays possible due to Streetworks
Sawcut And Infill Idr – Elongated P/H’S On The Offside Tyreline Turning Into A Long Gouge In The Running Surface Appx. 18.0 X .10 X 30/40mm .40 X .20 X 30mm .80 X .25 X 30mm .50 X .25 X 30mm .50 X .20 X 20mm Tm – Temp Lights Advised (Cw: Pothole) H2 Urban Lake at Lake: From O/S Tudor Lodge To The ‘Welcome To Shanklin’ Sign Onthe Shanklin Bound Side Of The C/Way: Whitecross Lane-Lak
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3020 Victoria Avenue, Shanklin, Isle Of Wight
13 January — 21 January Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Farside Carriageway To Site at Os 62
Responsibility: SGN
EToN status: Advanced planning
Sea Street, Newport, Isle Of Wight
12 January — 14 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) 2 Bus/Tram/Cycle Facilities Sign, 1 Route/Direction Sign & 1 Parking Restriction Sign Newport at Newport: At The Junction Of East Quay & Sea Street (Ml 240284):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Victoria Road, Cowes, Isle Of Wight
12 January — 25 January Traffic control (give & take)
Delays unlikely due to Streetworks
** Private Job ** Relocation Of Street Lighting Column Cowes at Cowes: Column 11 – Opposite Fellows Road (Ml 142191):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Worsley Road, Gurnard, Isle Of Wight
12 January — 14 January Some carriageway incursion
Delays unlikely due to Streetworks
1 ,Build 1 Precast Chamber In 915mm X 445mm X 965mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Footway,Install 3m Of 1 Way Poly Duct In Verge,Install 7m Of 1 Way Poly Duct In Carriageway at O/S 17 Across C/W To Opp 17, Worsley Road
Responsibility: BT
EToN status: Advanced planning
Cavendish Place, Newport, Isle Of Wight
12 January — 14 January Some carriageway incursion
Delays unlikely due to Streetworks
Renew Dp582 With A 10m Medium Pole And Renew 19 Drop Wires. at Dp582, Outside 2 Cavendish Place, Newport, Po30 5ae
Responsibility: BT
EToN status: Advanced planning
Churchill Road, Cowes, Isle Of Wight
12 January — 14 January No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Precast Chamber 725mm X 255mm X 665mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway,Install 8m Of 1 Way Poly Duct In Verge. at O/S 18, Churchill Road.
Responsibility: BT
EToN status: Advanced planning
Fleet Way, Shalfleet, Isle Of Wight
12 January — 14 January No carriageway incursion
Delays unlikely due to Streetworks
Excavate 1 Location(S) To Expose Cable Damage at O/S 28, Fleet Way
Responsibility: BT
EToN status: Advanced planning
Lugley Street, Newport, Isle Of Wight
13 January — 15 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) Newport at Newport: Half Way Along Lugley Street, Opposite Chain Lane (Ml 240230):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Newcomen Road, Lake, Isle Of Wight
12 January — 14 January Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm at 1 Newcomen Rd Sandown Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning
The Fairway, Lake, Isle Of Wight
12 January — 20 January No carriageway incursion
Delays unlikely due to Streetworks
Relay Service From Nearside Footway To Site at Os 5
Responsibility: SGN
EToN status: Advanced planning
Upper Road, Brading, Isle Of Wight
13 January — 15 January Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Connection at 5 Brookfield Cottage, Upper Road , Adgestone,Iow.
Responsibility: Southern Water
EToN status: Advanced planning
Watergate Road, Newport, Isle Of Wight
13 January — 15 January Some carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Footway,Install 7m Of 1 Way Poly Duct In Carriageway at O/S 52 Across C/W To Opp 52, Watergate Road.
Responsibility: BT
EToN status: Advanced planning
Wilkes Road, Sandown, Isle Of Wight
13 January — 15 January Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 7 Signs (1 No Entry/No Left Turn, 3 No Entry, 2 No Left Turn & 1 No Right Turn) Sandown at Sandown: Loc 1 – At The Junction Of Town Lane & Wilkes Road. Loc 2 – At The Junction Of Union Road & Wilkes Road (Ml 44
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning