Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
It covers work carried out by BT, utility companies and Island roads.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Surrey Street will be closed on one day from 0900hrs until 1600hrs between Friday 15 April and Tuesday 19 April 2016 The closure is between Well Street and St Johns Road for carriageway repairs by Island Roads.
Newnham Road will be closed on one day from 0900hrs until 1600hrs between Friday 15 April and Tuesday 19 April 2016 The closure is near Newnham and Verwood Drive for carriageway repairs by Island Roads
A3055 Broadway, Sandown, Isle Of Wight
16 April — 17 April
Delays likely Traffic control (multi-way signals)
Works location: Sandown: Ml 410046 From The Junction Of Beachfield Road To The Junction Of New Street: Broadway-Sandown
Works description: Footway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Reinstatement Of Access, Quartering Etc. Resurfacing Of The Footway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames. Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Esplanade, Ryde, Isle Of Wight
16 April — 16 June
Delays likely Road closure
Works location: Ryde: From North Walk To The Strand (Ml310059): Esplanade-Ryde:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H1, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Chatfeild Road, Niton, Isle Of Wight
15 April — 19 April
Delays likely Road closure
Works location: Niton: 200m From Jct With Kemming Road.: Chatfeild Road-Niton
Works description: Sawcut And Infill C/W Defects X 14 Delaminated Potholes. 28 Day Perm Repair Required. .90 X .55 X 35mm .65 X .65 X 35mm .90 X .50 X 35mm 3m X .60 X 35mm .50 X .50 X 35mm X 5 Potholes. .45 X .35 X 35mm X 4 Potholes. Tm- 2 Way Ttl (Cw: Pothole) H3 Rural Niton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newnham Road, Binstead, Isle Of Wight
15 April — 19 April
Delays likely Road closure
Works location: Binstead: 150m Before Bartons Corner On The Western Edge Of The C/Way: Newnham Road-Binstead
Works description: Sent To Cip 22/03/16 Idr – Edge Of C/Way Of Cip’D Road Failing In 2 Places 2 Patches Req’D 14m X .50 X 50/100mm 17m X 1.0 X 50/100mm Tm – Two Way Temp Lights Please Make Derek Benfield Aware Of These Defects (Cw: Pothole) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Surrey Street, Ryde, Isle Of Wight
15 April — 19 April
Delays likely Road closure
Works location: Ryde: Outside 21 Surrey Street Ryde.: Surrey Street-Ryde
Works description: Saw Cut Repair Potholes 300mm Diam X45mm And 3 Up To 200mm Diam X 30mm. Road Closure (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Undercliff Gardens, Ventnor, Isle Of Wight
15 April — 19 April
Delays likely Road closure
Works location: Ventnor: Between No 7 And Jct With Steephill Road.: Undercliff Gardens-Ventnor
Works description: Sawcut And Infill C/W Defects X 18 Potholes. Require 28 Day Perm Repair. .90 X .40 X 35mm .95 X .65 X 40mm X 4 Potholes. .65 X .50 X 35mm X 3 Potholes .45 X .40 X 30mm X 6 Potholes. .35 X .30 X 30mm X 4 Potholes. Tm- Mobile Works. (Cw: Pothole) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
15 April — 19 April
Delays possible Traffic control (two-way signals)
Works location: Binstead: Ml 340502 Church Road, Binstead Junction With Quarr Road. Works Under Two Way Lights.: Church Road-Binstead
Works description: #119 Minor Drainage Scheme Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Lime Kiln Shute, Newchurch, Isle Of Wight
15 April — 19 April
Delays possible Traffic control (multi-way signals)
Works location: Newchurch: Appx Halfway Down The Shute On The Southern Side: Lime Kiln Shute-Newchurch
Works description: Sawcut And Infill Idr – P/H’S X 3 3.0 X .60 X 40mm 1.2 X .80 X 30mm 5.0 X .50 X 50mm Tm – Road Closure (Cw: Pothole) H4 Rural Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
High Street, Whitwell, Isle Of Wight
15 April — 19 April
Delays unlikely Some carriageway incursion
Works location: 5 Hillside Terrace, High Street, Whitwell, Iow.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning
Atherley Road, Shanklin, Isle Of Wight
15 April — 19 April
Delays unlikely No carriageway incursion
Works location: O/S 4 To East Cnr O/S 18, Atherley Road.
Works description: Install 42m Of 1 Way Poly Duct In Footway.
Responsibility for works: BT
Current status: Advanced planning
Regent Street, Shanklin, Isle Of Wight
15 April — 19 April
Delays unlikely No carriageway incursion
Works location: Opp 130, Regent Street.
Works description: Install 3m Of 1 Way Poly Duct In Footway.
Responsibility for works: BT
Current status: Advanced planning
Falcon Road, East Cowes, Isle Of Wight
15 April — 20 April
Delays unlikely Traffic control (give & take)
Works location: East Cowes: From Junction With Adelaide Grove, 77m West, Ml 140226: Falcon Road-East Cowes
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St Marys Road, Cowes, Isle Of Wight
15 April — 12 May
Delays unlikely Some carriageway incursion
Works location: O/S 4 Anzac Cottages
Works description: Skip App. 4 Anzac Cottages, 15/04 – 12/05
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning