A3054 Colwell Road, Freshwater, Isle Of Wight
18 August — 18 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150u/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2) Freshwater at Freshwater: From Colwell Lane To Madeira Lane (Ml 620003): Colwell Road-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Colwell Road, Freshwater, Isle Of Wight
18 August — 18 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65psv Channle Plane-Urban:H2) Freshwater at Freshwater: From Heathfield Road 240m West (Ml620005): Colwell Road-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Colwell Road, Freshwater, Isle Of Wight
18 August — 18 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65sv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2 Freshwater at Freshwater: From Madeira Lane To 240m West Of Heathfield Road (Ml 620004): Colwell Road-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Colwell Road, Freshwater, Isle Of Wight
18 August — 18 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100u/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Freshwater at Freshwater: The Avenue Roundabout Its Entire Length (Ml 620001): Colwell Road-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3330 Alexandra Road, Ryde, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H2) Ryde at Ryde: From St Johns Hill To Gassiot Green Road (Ml 320239a): Alexandra Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Wilton Park Road, Shanklin, Isle Of Wight
18 August — 18 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Flexi&5%Recon:U/H2 Resurface 40mm Ul-M 65psv With Flexiplast System & 5% Reconstruction-Urban:H2 (Kerbed=Inlay/Unkerbed=Overlay) Shanklin at Shanklin: From Atherley Road To Clarence Road (Ml 420161): Wilton Park Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Wilton Park Road, Shanklin, Isle Of Wight
18 August — 18 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2 Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2 (Kerbed=Inlay/Unkerbed=Overlay) Shanklin at Shanklin: From Clarence Road To Arthurs Hill (Ml 420162): Wilton Park Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Great Preston Road, Ryde, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H2) Ryde at Ryde: From Harding Road To Gassiot Green Road (Ml 320239): Great Preston Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Wootto at Wootton: From Newnham Lane 605m West (Ml340524): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From A Point 50m South Of Firestone Glade For A Further 320m South (Ml340523): Firestone Copse Road-Wootton:; E
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From Newnham Lane 570m South (Ml340525): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From Havenstreet Main Road 430m West (Ml340526): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Stroud Wood Road, Havenstreet, Ryde, Isle Of Wight
19 August — 21 August Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Warning Sign Leaning Forward By 30% Requires Resetting Unable To Photograph As Road Too Dangerous Tm – Two Way Temp Lights (Sg: Sign Mis-Aligned) Ryde at Ryde: On The Havenstreet Bound Side Of The C/Way 100m Past Stroud A Farm: Stroud Wood Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Upper Road, Brading, Isle Of Wight
19 August — 21 August Traffic control (two-way signals)
Delays possible due to Streetworks
Saw Cut & Infill 1200x300x60mm, 100x400x50mm, 500x300x50mm, 400x300x50mm, 1300x500x70mm, 500x300x40mm, 500mm Diam X 70mm, 400x500x60mm. Tm=Road Closure (Cw: Pothole) Brading at Brading: Between Jct Bully’S Hill & Jct Well Lane: Upper Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Lind Street, Ryde, Isle Of Wight
19 August — 21 August Some carriageway incursion
Delays unlikely due to Streetworks
Install Water Main Connection In Lind Street at Ryde Travel Lodge, Lind Hill,Ryde,Iow.
Responsibility: Southern Water
EToN status: Advanced planning
A3055 New Road, Brading, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Install 14m Of 1 Way Poly Duct In Verge,Install 1m Of 1 Way Poly Duct In Footway at S58 Not Affected. Side Of 5, New Road
Responsibility: BT
EToN status: Advanced planning
A3055 North Road, Shanklin, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Excavation Of Small Section Of Footway For 2 New Electrical Connections To 2 New Properties At 68 North Rd at From O/S 60 North Rd To Junc Of Atherley Road
Responsibility: Southern Electric
EToN status: Advanced planning
B3320 Arctic Road, Cowes, Isle Of Wight
18 August — 01 September Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway To Provide New Electrical Supply To New Properties at From O/S 66 To O/S 73
Responsibility: Southern Electric
EToN status: Advanced planning
B3321 Victoria Grove, East Cowes, Isle Of Wight
18 August — 18 August Traffic control (give & take)
Delays unlikely due to Streetworks
Trial Holes In Carriageway To Assess The Pavement Condition Before Treatment East Cowes at East Cowes: Victoria Grove 130m West Of Vectis Road (Ml 130033): Victoria Grove-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3395 High Street, Bembridge, Isle Of Wight
18 August — 19 August Some carriageway incursion
Delays unlikely due to Streetworks
Reinstatement To Be Carried Out On Interim Site at (Pcp4 V2) Outside 43, High Street
Responsibility: BT
EToN status: Advanced planning
Atherley Road, Shanklin, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 4m Of 1 Way Poly Duct In Footway at O/S 22, Atherley Road
Responsibility: BT
EToN status: Advanced planning
Worsley Road, Gurnard, Isle Of Wight
18 August — 20 August Some carriageway incursion
Delays unlikely due to Streetworks
– Connect New Water Main To Site In Footway & Reinstate at 42, Worsley Rd, Cowes
Responsibility: Southern Water
EToN status: Advanced planning
Gully Road, Nettlestone, Isle Of Wight
18 August — 20 August Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Connection at Bramblecross ,Gully Rd , Seaview, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Hazlemere Avenue, Binstead, Isle Of Wight
18 August — 20 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit 50% Partrecon Fwr: Bit 50% Partrecon) Binstead at Binstead: Whole Length Of Footway From Parkway (Ml 361635): Hazlemere Avenue-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Kinchington Road, Carisbrooke, Isle Of Wight
18 August — 20 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Fullrecon) Carisbrooke at Carisbrooke: From Wellington Road To Purdy Road (Ml 240162): Kinchington Road-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Lind Hill, Ryde, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway at 29m South Of Junc Lind Street, Lind Hill
Responsibility: BT
EToN status: Advanced planning
Millfield Road, Newport, Isle Of Wight
18 August — 25 August Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 48575 at Os 4
Responsibility: SGN
EToN status: Advanced planning
Puckpool Hill, Seaview, Isle Of Wight
19 August — 21 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Part Recon) Seaview at Seaview: From Appley Road 200m East (Ml 330376): Puckpool Hill-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Union Road, Cowes, Isle Of Wight
19 August — 26 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Aj Scaffold) at O/S 5
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Yaverland Close, Sandown, Isle Of Wight
18 August — 25 August Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 01965 at Os 18
Responsibility: SGN
EToN status: Advanced planning
York Street, Cowes, Isle Of Wight
19 August — 28 August Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Farside Carriageway at Os 60
Responsibility: SGN
EToN status: Advanced planning