Road closed

Isle of Wight roadworks and road closures 22nd October 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Medina Way, Newport, Isle Of Wight
23 October — 05 November Traffic control (give & take)
Delays likely due to Streetworks
Replacement Of N? 31 Signs (2 X Clearway, 2 X Cyclists On Roundabout, 4 X Derestriction, 1 X Junction Ahead, 2 X No Entry, 9 X Speed Restriction, 2 X Traffic Lights Ahead, 8 X Turn Left & 1 X Turn Right Sign) Newport at Newport: From Coppins Bridge Roundabout, North To St Marys Hospital (Ml 210015, Ml 210014, Ml 210013, Ml 210012, Ml 2100
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 North Road, Shanklin, Isle Of Wight
22 October — 26 October Traffic control (give & take)
Delays likely due to Streetworks
Replacement Of Traffic Signals Shanklin at Shanklin: At The Junction Of Hope Road & North Road (Ml 440210):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Old Seaview Lane, Seaview, Isle Of Wight
22 October — 22 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H3, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Coure Overlay) Seavie at Seaview: From Somerset Road To Pier Road (Ml 330385): Old Seaview Lane-Seaview:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Old Seaview Lane, Seaview, Isle Of Wight
22 October — 22 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H3, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Coure Overlay) Seavie at Seaview: From Steyne Road To Somerset Road (Ml 330386): Old Seaview Lane-Seaview:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3399 Limerstone Road, Brighstone, Isle Of Wight
23 October — 29 October Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Brighstone – 318980 – Bduk – Lay Approx 5m Of Duct 54 In Cw And 3m Of Soft To Link Existing Bt Boxes To Facilitate Spine Cabling Works. (Could Also Required To Build A New Joint Box Jf6) at From In The Carriageway At The Junction Of Brighstone Footpath 90 To Opposite The Junction Of Brighstone Footpath 90 On
Responsibility: BT
EToN status: Advanced planning

Staplers Road, Newport, Isle Of Wight
23 October — 23 October Traffic control (two-way signals)
Delays possible due to Streetworks
Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant at Os 18 Staplers Rd Isle Of Wight Po30 2rd
Responsibility: BT
EToN status: Advanced planning

Ashey Road, Ryde, Isle Of Wight
23 October — 23 October Traffic control (two-way signals)
Delays possible due to Streetworks
District Responders To Help With Digging Trial Holes Whilst Cd Fencing Carry Out Inspections Ryde at Ryde: The Barriers Are Located Between East Ashey Lane & Brading Downs Road: Ashey Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3056 Arreton Street, Arreton, Isle Of Wight
23 October — 27 October No carriageway incursion
Delays unlikely due to Streetworks
Install 1m Of 1 Way Poly Duct In Verge at In Verge Os Beresford, Arreton Street
Responsibility: BT
EToN status: Advanced planning

B3325 Nodes Road, Northwood, Isle Of Wight
22 October — 26 October Some carriageway incursion
Delays unlikely due to Streetworks
Permanent Reinstatement Around Manhole In Footway at 39 Nodes Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
23 October — 27 October No carriageway incursion
Delays unlikely due to Streetworks
Interim To Perm Works at S58 Only Affects C/W. Jnc Of Brook Road On , Freshwater Road
Responsibility: BT
EToN status: Advanced planning

Fort Street, Sandown, Isle Of Wight
22 October — 26 October Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 1 Sign (1 Give Way) Sandown at Sandown: At The Junction Of Avenue Road & Fort Street (Ml 440149):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
22 October — 26 October Some carriageway incursion
Delays unlikely due to Streetworks
Install Water Service Connection To New House. at 179 Gunville Road, Newport, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Castle Street, Ryde, Isle Of Wight
22 October — 26 October Traffic control (give & take)
Delays unlikely due to Streetworks
Permanent Reinstatement Around Manhole In Carriageway at 24 Flat 2 Palmer Hou Castle St Ryde Is
Responsibility: Southern Water
EToN status: Advanced planning

Crossways Road, East Cowes, Isle Of Wight
22 October — 30 October No carriageway incursion
Delays unlikely due to Streetworks
Lay New Service From Near Side Footway To Site at Footpath Between 22 And 24 Crossways Road Leading To 16
Responsibility: SGN
EToN status: Advanced planning

Highfield Road, Cowes, Isle Of Wight
22 October — 30 October No carriageway incursion
Delays unlikely due to Streetworks
Relay Service From Nearside Footway To Site at Os 17
Responsibility: SGN
EToN status: Advanced planning

Madeira Road, Ventnor, Isle Of Wight
22 October — 04 November Some carriageway incursion
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway And Cable Trench For New Supplies To Flats Backfill And Reinstate at From O/S 21 – O/S Maderia House
Responsibility: Southern Electric
EToN status: Advanced planning

Poplar Close, Bembridge, Isle Of Wight
22 October — 26 October No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 725mm X 255mm X 665mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway at O/S No:1, Poplar Close
Responsibility: BT
EToN status: Advanced planning

St Margarets Glade, Ventnor, Isle Of Wight
23 October — 27 October No carriageway incursion
Delays unlikely due to Streetworks
Provide 1 Core Drill(S) Into Jointbox Or Building at R/O 17, St Margarets Glade
Responsibility: BT
EToN status: Advanced planning

Tyne Walk, Bembridge, Isle Of Wight
22 October — 28 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Bembridge at Bembridge: Whole Length Of Tyne Walk (Ml 363182): Tyne Walk-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Whitecross Lane, Lake, Isle Of Wight
22 October — 26 October Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement at 152, Whitecross Lane,Shanklin
Responsibility: Southern Water
EToN status: Advanced planning

Image: oatsy under CC BY 2.0