B3323 Carisbrooke Road, Newport, Isle Of Wight
27 August — 28 August Traffic control (two-way signals)
Delays likely due to Streetworks
Remedial Works at O/S 102 At Jcn Castle Road, Carisbrooke Road
Responsibility: BT
EToN status: Advanced planning

Doctors Lane, Shorwell, Isle Of Wight
27 August — 27 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Shorwell at Shorwell: From Wolverton Lane To Junction Of Mill Lane (Ml 640431): Doctors Lane-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Firestone Copse Road, Wootton, Isle Of Wight
27 August — 27 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From Newnham Lane 570m South (Ml340525): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Firestone Copse Road, Wootton, Isle Of Wight
27 August — 27 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From Havenstreet Main Road 430m West (Ml340526): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Firestone Copse Road, Wootton, Isle Of Wight
27 August — 27 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From A Point 50m South Of Firestone Glade For A Further 320m South (Ml340523): Firestone Copse Road-Wootton:; E
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Firestone Copse Road, Wootton, Isle Of Wight
27 August — 27 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Wootto at Wootton: From Newnham Lane 605m West (Ml340524): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Shanklin Road, Godshill, Isle Of Wight
27 August — 28 August Traffic control (two-way signals)
Delays possible due to Streetworks
Remedial Works at 454439,081798 Opp Pound Farm Bungalow, Shanklin Road, Godshill, Po38 3aw
Responsibility: BT
EToN status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
27 August — 01 September Traffic control (two-way signals)
Delays possible due to Streetworks
Brighstone 315399 Required To Allow Bt Desilting And Cabling To Take Place. at Os 61 Pallance Road, Northwood
Responsibility: BT
EToN status: Advanced planning

Appleford Road, Chale, Isle Of Wight
26 August — 28 August Traffic control (two-way signals)
Delays possible due to Streetworks
Brighstone – 315399 – Bduk – 2 Way Traffic Lights To Enable Desilt And Gully Suck Of Bt Boxes at From The Junction Of Appleford Lane To Godshill Footpath 12, Appleford Road, Chale, Isle Of Wight
Responsibility: BT
EToN status: Advanced planning

B3328 Queens Road, Shanklin, Isle Of Wight
27 August — 10 September No carriageway incursion
Delays unlikely due to Streetworks
Excavte In F/Way For New Supply at O/S 37 To S/O 1 Hope Road
Responsibility: Southern Electric
EToN status: Advanced planning

Bullen Road, Nettlestone, Isle Of Wight
26 August — 03 September Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit 50% Partrecon ) Nettlestone at Nettlestone: From Brading/Marlborough Road 200m East (Ml 330371): Bullen Road-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Victoria Road, Sandown, Isle Of Wight
27 August — 01 September Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 1 Sign Post & N? 2 Attached Signs (N? 1 External Light) Sandown at Sandown: 448 & 449 – Just West Of The Junction Of Albert Road (Ml 440455):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Gardens Path, Brading, Isle Of Wight
27 August — 27 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Brading at Brading: Link Footway At The End Of Station Gardens (Ml F30348): Gardens Path-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Grasmere Avenue, Ryde, Isle Of Wight
26 August — 08 September Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Ryde at Ryde: Whole Length Of Road From Appley Road (Ml 340512): Grasmere Avenue-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Grove Road, Sandown, Isle Of Wight
26 August — 28 August Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 2 Sign Posts & N? 2 Attached Signs (N? 2 External Lights) Sandown at Sandown: Site 1 – At The Junction Of Broadway & Grove Road. Site 2 – At The Junction Of Station Road & Grove Road (Ml
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Hambrough Road, Ventnor, Isle Of Wight
27 August — 10 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Island Scaffold) at O/S Miramare Court
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Littlestairs Road, Shanklin, Isle Of Wight
27 August — 27 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwr: Bit Partrecon) Shanklin at Shanklin: Link Footway At The End Of Littlestairs Road (Ml F40649): Littlestairs Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Locksley Close, Freshwater, Isle Of Wight
26 August — 28 August No carriageway incursion
Delays unlikely due to Streetworks
Reinstate Lamp Box After Rta at Entrance To Locksley Close, Freshwater, Isle Of Wight
Responsibility: Romec Ltd
EToN status: Advanced planning

Louis Road, Lake, Isle Of Wight
26 August — 28 August Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 0 Sign Posts & N? 1 Attached Sign (N? 1 External Light) Lake at Lake: At The Junction Of Newport Road & Louis Road (Ml 440407):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mill Road, St Helens, Isle Of Wight
27 August — 27 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Con 20% Bayrepl) St Helens at St Helens: Link Footway Between Mill Road/Newlands (Ml F30311): Mill Road-St Helens
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Solent Path, Ryde, Isle Of Wight
27 August — 27 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwr: Bit Partrecon) Ryde at Ryde: Link Footway At The End Of Solent Close (Ml F30127): Solent Path-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Spencer Road, Ryde, Isle Of Wight
26 August — 24 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (B Ashton Scaffolding) at O/S 4
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

West Place, Ryde, Isle Of Wight
27 August — 31 August Some carriageway incursion
Delays unlikely due to Streetworks
New Pole To Be Erected And Old Recovered In Unmade Surface O/S 6 West Place Ryde at O/S 6 West Place Ryde Po33 2ql
Responsibility: BT
EToN status: Advanced planning

Woods Drive, Newchurch, Isle Of Wight
27 August — 01 September Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 3 Sign Posts & N? 3 Attached Signs (N? 3 External Lights) Newchurch at Newchurch: 452, 453 & 454 – From Alverstone Road, West To Roundabout. (Ml 441439):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning