Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
B3323 Carisbrooke Road, Newport, Isle Of Wight
28 August — 28 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Newpor at Newport: From Pyle Street To Bedford Row (Ml210075): Carisbrooke Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3323 Carisbrooke Road, Newport, Isle Of Wight
28 August — 28 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Newport at Newport: From Trafalgar Road To Bedford Row (Ml210074): Carisbrooke Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
College Close, Sandown, Isle Of Wight
28 August — 02 September Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 4 Sign Posts & N? 6 Attached Signs (N? 4 External Lights) Sandown at Sandown: On The Roundabout In The Middle Of College Close (Ml 460329):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Fitzroy Street, Sandown, Isle Of Wight
28 August — 02 September Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 1 Sign Post & N? 1 Attached Sign (N? 1 External Light) Sandown at Sandown: At The Junction Of Station Avenue & Fitzroy Street (Ml 440339):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Louis Road, Lake, Isle Of Wight
28 August — 02 September Some carriageway incursion
Delays unlikely due to Streetworks
-Remdial Reinstatement at 22, Louis Rd, Sandown, Po396ht
Responsibility: Southern Water
EToN status: Advanced planning
Paddock Road, Shanklin, Isle Of Wight
28 August — 08 September No carriageway incursion
Delays unlikely due to Streetworks
Relay Service From Nearside Footway To Site at Os 8
Responsibility: SGN
EToN status: Advanced planning
School Lane, Newport, Isle Of Wight
28 August — 02 September Some carriageway incursion
Delays unlikely due to Streetworks
Install 4m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway,Provide 1 Core Drill(S) Into Jointbox Or Building at O/S Medina Training Centre, School Lane
Responsibility: BT
EToN status: Advanced planning
Warden Road, Totland, Isle Of Wight
28 August — 08 September Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Nearside Carriageway To Site at Os Slaters
Responsibility: SGN
EToN status: Advanced planning