A3054 Binstead Road, Ryde, Isle Of Wight
28 October — 30 October Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – Gully Cover Depressed, Rocking And Breaking Out Requires Resetting 1.50 X .80 X 100/150mm Patch Tm – Two Way Temp Lights (Gl: Ironwork Rocking/Corrosion) Ryde at Ryde: O/S Treefields Just Up From The Golf Club Adj To The Traffic Island On The Ryde Bound Side Of The C/Way: Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 High Street, Wootton, Isle Of Wight
28 October — 29 October Traffic control (two-way signals)
Delays likely due to Streetworks
Remedial To Rectify Ha Defect In Cw at Opp 156, High Street
Responsibility: BT
EToN status: Advanced planning

A3054 High Street, Wootton, Isle Of Wight
29 October — 30 October Traffic control (multi-way signals)
Delays likely due to Streetworks
Wootton Bridge 1 Interim To Permanent Works In Carriageway at So 164 High Street, Wootton Bridge
Responsibility: BT
EToN status: Advanced planning

A3054 Quarr Hill, Binstead, Isle Of Wight
28 October — 30 October Traffic control (two-way signals)
Delays likely due to Streetworks
Reset Gully Frame And Cover To Level. If Damaged Or Worn, Replace With New. Tm=2 X Way Traffic Lights Close Further Works Required Lines Need Refreshing Binstead at Binstead: O/Side Woodstock: Quarr Hill-Binstead – 788
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3331 Fishbourne Lane, Wootton, Isle Of Wight
28 October — 29 October Traffic control (Stop/Go boards)
Delays possible due to Streetworks
To Rectify Ha Defect In Cw at 455520 092328 19 Fishbourne Lane Wootton Po33 4ez
Responsibility: BT
EToN status: Advanced planning

B3401 Sun Hill, Calbourne, Isle Of Wight
29 October — 30 October Traffic control (two-way signals)
Delays possible due to Streetworks
Overlay – Remedial Works Following Internal Inspection, Works In Carriageway at O/S Four Winds, Sun Hill, Calbourne, Iow Po30 4ja
Responsibility: BT
EToN status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
28 October — 28 October Traffic control (two-way signals)
Delays possible due to Streetworks
Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant at Os 108 Pallance Road, Northwood ? Isle Of Wight Po31 8ls
Responsibility: BT
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
28 October — 30 October Traffic control (two-way signals)
Delays possible due to Streetworks
Idr – Footway Repairs Reinstate 5mx1.8m (9m2) Tm Two Way Lights Req And No Parking Cones Setting Out Opp Nb Please Inform Home Owner Prior To Works As This Is A Vc (Fw: Fw/Cyclep Pothole) Carisbrooke at Carisbrooke: 22: Gunville Road-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Great Preston Road, Ryde, Isle Of Wight
28 October — 30 October Traffic control (multi-way signals)
Delays possible due to Streetworks
Gully Cover And Small Ironwork Cover Are Set Within A Reinstatement That Has A 40mm Depression Causing Vibration To The Customers Property When Large Vehicles Pass Over It Renew Reinstatement And Make Level With Surrounding Road Surface Saw Cut & Infill 2.0 X 1.0 X 100/150mm Tm – Three Way Temp Lights With Parking Restrictions During Work On Opposite Side Of The C/Way O/S No.’S 103 To 109 Great Preston Rd. (Cw: Pothole) Ryde at Ryde: O/S No 78 Near Entrance To Footpath R55: Great Preston Road-Ryde – 4094
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Palmers Road, Wootton, Isle Of Wight
29 October — 30 October Traffic control (multi-way signals)
Delays possible due to Streetworks
Wootton Bridge 1 318545 Interim To Permanent Works In Carriageway at S/O 1 Palmers Road, Wootton Bridge
Responsibility: BT
EToN status: Advanced planning

A3055 Avenue Road, Freshwater, Isle Of Wight
28 October — 03 November Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sds Scaffolding) at O/S The Memorial Hall
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Military Road, Chale, Isle Of Wight
28 October — 29 October Some carriageway incursion
Delays unlikely due to Streetworks
Recover Carrier Pole Off Dp44 at Outside Chale Church, Behind Kisok, Military Road, Po38 2hh
Responsibility: BT
EToN status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
28 October — 30 October No carriageway incursion
Delays unlikely due to Streetworks
Remove A Type Pillar Box at Verge, Opposite Vets, School Green Road, Freshwater, Isle Of Wight
Responsibility: Romec Ltd
EToN status: Advanced planning

Arthur Street, Ryde, Isle Of Wight
29 October — 30 October Some carriageway incursion
Delays unlikely due to Streetworks
Renew Dp921 With A 9m Light Pole. Renew 9 Dropwires. at Dp921, Outside126 Arthur Street, Po33 3bw
Responsibility: BT
EToN status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
29 October — 04 November Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S Boots, 15
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3399 Kingston Road, Shorwell, Isle Of Wight
29 October — 30 October Traffic control (give & take)
Delays unlikely due to Streetworks
Kerbing To Prevent Flooding As A Result Of Increased Carriageway Height Shorwell at Shorwell: Outside Bucks Cottage Ml 630138: Kingston Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Bluett Avenue, Seaview, Isle Of Wight
29 October — 30 October Some carriageway incursion
Delays unlikely due to Streetworks
Renew Dp2017 With A 9m Light Pole. Renew 7 Drop Wires. at Dp 2017, Bluett Avenue, Seaview, Ryde, Po34 5he
Responsibility: BT
EToN status: Advanced planning

Bedbury Lane, Freshwater, Isle Of Wight
28 October — 28 October Traffic control (give & take)
Delays unlikely due to Streetworks
Installation Of Asphalt Hump At Top Of Driveway Freshwater at Freshwater: Opposite Entrance To Farringford House (Ml 630206): Bedbury Lane-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Main Road, Alverstone, Isle Of Wight
28 October — 29 October Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Work On Ha Defect. at (Pcp6) 457770,85557457764,85565 Opposite Station House Across Carriageway To Outside Station House
Responsibility: BT
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
28 October — 30 October Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Service To New House. at 179 Gunville Road , Newport, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Church Path, East Cowes, Isle Of Wight
28 October — 24 December Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at Path Between Waitrose And Church Path
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Culver Way, Sandown, Isle Of Wight
29 October — 06 November Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwr : Bit Partrecon Fwr : Bit Partrecon) Sandown at Sandown: From Meadow Way To Redcliff Close (Ml 440331): Culver Way-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Home Meade, Newport, Isle Of Wight
28 October — 03 November Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Knight Skips Hire) at Opposite 7
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Kings Path, Binstead, Isle Of Wight
29 October — 02 November Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon) Binstead at Binstead: Link Footway From The Mall To Kings Road (Ml F30212): Kings Path-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Leed Street, Sandown, Isle Of Wight
28 October — 10 November Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 13 Signs (2 Give Way, 2 No Entry, 3 No Left Turn, 4 One Way Traffic & 2 Turn Left) Sandown at Sandown: From Junction With Broadway, East To Junction With St Johns Road (Ml 440356):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Lowtherville Road, Ventnor, Isle Of Wight
28 October — 30 October No carriageway incursion
Delays unlikely due to Streetworks
Reinstatment To Be Carried Out On Interim Site at Os 5-10 St Margarets Lowtherville Road
Responsibility: BT
EToN status: Advanced planning

Old Road, East Cowes, Isle Of Wight
29 October — 11 November Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay And Road Crossing For New Electrical Supply To Development Site at From Junction Of Castle Street To Opposite Number 1
Responsibility: Southern Electric
EToN status: Advanced planning

The Glen, Niton, Isle Of Wight
29 October — 30 October Some carriageway incursion
Delays unlikely due to Streetworks
Renew Cp1 Off Dp86 With A 9m Light Pole And Renew 6 Drop Wires at Cp1 Off Dp86, The Glen, Opposite Blue Firs Po38 2bq
Responsibility: BT
EToN status: Advanced planning