Road cones:

Isle of Wight roadworks and road closures: 2nd June

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 Bonchurch Road, Shanklin, Isle Of Wight
02 June — 12 June Traffic control (two-way signals)
Delays likely due to Streetworks
Surfacing Preparatory Works, Replacing And Relaying Kerbs Shanklin at Shanklin: From Access Road To Church Road (Ml 420025/26/27): Bonchurch Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Broadway, Sandown, Isle Of Wight
03 June — 10 June Traffic control (multi-way signals)
Delays likely due to Streetworks
Square Cut Patch 3×1.5x50mm 4way Ttl (Cw: Pothole) Sandown at Sandown: Broadway / Junction With Heights Just As Approach Ped X: Broadway-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Marsh Road, Gurnard, Isle Of Wight
02 June — 04 June Road closure
Delays likely due to Streetworks
– Install New Water Connection at Boat Yard Opp,2. Marsh Road , Cowes, Isle Of Wight
Responsibility: Southern Water
EToN status: Advanced planning

Blacklands Lane, Newport, Isle Of Wight
02 June — 05 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Newport at Newport: From Briddlesford Road 550m West (Ml330176): Blacklands Lane-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Blacklands Lane, Newport, Isle Of Wight
02 June — 05 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Newport at Newport: From Staplers Road 790m East (Ml 330175): Blacklands Lane-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

St Lawrence Shute, Whitwell, Isle Of Wight
02 June — 04 June Road closure
Delays likely due to Streetworks
Install Pressure Point : Rear Of 1,Fishers,Ventnor .The Works Are In St.Lawrence Shute. at Rear Of: 1,Fishers,Ventnor,Iow
Responsibility: Southern Water
EToN status: Advanced planning

A3054 Kite Hill, Wootton, Isle Of Wight
02 June — 04 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at O/S Steep Rock, Kite Hill
Responsibility: BT
EToN status: Advanced planning

A3054 Kite Hill, Wootton, Isle Of Wight
03 June — 05 June Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway at Os The Torrs, Kite Hill
Responsibility: BT
EToN status: Advanced planning

B3395 Sandown Road, Bembridge, Isle Of Wight
02 June — 03 June Traffic control (two-way signals)
Delays possible due to Streetworks
2 Way Lights Required For 1 Day To Allow Erection Of Overhead Wires at On B3395 Longlands Shute Bembridge Isle Of Wight Po36 8qy At Longlands Farm
Responsibility: BT
EToN status: Advanced planning

A3055 Pier Street, Ventnor, Isle Of Wight
02 June — 15 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 5 Lanterns (N? 3 Columns & 1wb) 1 Lit Warning Sign & 1 No Waiting/Loading Sign Ventnor at Ventnor: From Esplanade, North To High Street (Ml 530058, Ml 540171 & Ml 541191):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
02 June — 03 June No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice For Fw To Clear Ha Defect at Tarmac C/W & F/W O/S 8 , Sandown Road
Responsibility: BT
EToN status: Advanced planning

A3055 Victoria Street, Ventnor, Isle Of Wight
02 June — 15 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 4 Lanterns (N? 3 Columns) 1 Public Notice Ventnor at Ventnor: From High Street, South To Junction Of St Catherines Street (Ml 530058):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3056 Arreton Street, Arreton, Isle Of Wight
03 June — 05 June Some carriageway incursion
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Arreton at Arreton: From Arreton Community Hall 250m East (Ml 410059): Arreton Street-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3330 Eddington Road, Seaview, Isle Of Wight
03 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Fotway Re-Construction And Surfacing (Fwl 50% Part Recon Fwr Bit Part Recon Seaview at Seaview: From Outside No 19 Eddington Road 50mtrs South (Ml 330080: Eddington Road-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3340 Seaview Lane, Nettlestone, Isle Of Wight
03 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Fotway Re-Construction And Surfacing (Fwl 50% Part Recon Fwr Bit Part Recon Nettlestone at Nettlestone: Full Length Of Footway Eastern Side Of Nettlestone Hill (Ml 3300: Seaview Lane-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Bellevue Road, Ventnor, Isle Of Wight
03 June — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Mr Skippy) at O/S The Ridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Hillway Road, Bembridge, Isle Of Wight
03 June — 05 June Some carriageway incursion
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing(Fwr: Bit Partrecon) Bembridge at Bembridge: From Steyne Road 50mtrs South (Ml 340165): Hillway Road-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Caws Avenue, Nettlestone, Isle Of Wight
03 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl ; Part Recon Fwr : Bit Part Recon) Nettlestone at Nettlestone: From Cedarwood Drive To Solent View Road (Ml 340495): Caws Avenue-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Duver Road, St Helens, Isle Of Wight
03 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surafcing ( Fwr: Bit Part Recon) St Helens at St Helens: Footway Along New Geotechnical Scheme (Ml 340297):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Esplanade, Ventnor, Isle Of Wight
03 June — 16 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 21 Lanterns (N? 21 Columns) 4 Bus Stops, 5 No Waiting Signs, 1 No Waiting/Loading Sign, 4 Route/Direction Signs, 1 Parking Restriction Sign, 1 Resident/Business Parking Permit Sign, 18 Resident Parking Signs With Times & 18 Warning Signs Ventnor at Ventnor: From Pier Street, West To Column 22 (Ml 540171, Ml 540172 & Ml 540173):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Holyrood Street, Newport, Isle Of Wight
03 June — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Gjp Scaffolding/Upright Scaffolding) at O/S 13
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Lincoln Way, Bembridge, Isle Of Wight
03 June — 05 June Some carriageway incursion
Delays unlikely due to Streetworks
Renew F/H Frame & Cover at 15 Lincoln Way , Bembridge, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Littleton Close, Ventnor, Isle Of Wight
02 June — 04 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 1 Lanterns (No 1 Columns) Ventno at Ventnor: From Down Lane, North To Dead End (Ml 540250): :; Sl Cip Scheme Sl Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mathews Way Path, Nettlestone, Isle Of Wight
03 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwr : Bit Part Recon) Nettlestone at Nettlestone: Link F/Way Between The North & South Sides Of Matthews Way (F30217): Mathews Way Path-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Matthews Way, Nettlestone, Isle Of Wight
03 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl: Bit Part Recon Fwr : Bit Part Recon) Nettlestone at Nettlestone: Northern Section Of Matthews Way (Ml 361564): Matthews Way-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Middle Barn Lane, Wroxall, Isle Of Wight
03 June — 05 June Some carriageway incursion
Delays unlikely due to Streetworks
Renew F/H Frame & Cover at Middle Barn Farm, Middle Barn Lane, Wroxall,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

Paddock Close, Shorwell, Isle Of Wight
03 June — 05 June Some carriageway incursion
Delays unlikely due to Streetworks
Renew F/H Frame & Cover at 12 Paddock Close, Shorwell, Newport, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Quarry Road, Ryde, Isle Of Wight
03 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Mr Skippy) at O/S 37
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Southfield Gardens, Ryde, Isle Of Wight
03 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl: Bit Part Recon Fwr : Bit Part Recon) Ryde at Ryde: Footways From Southfiled Gardens To Bettesworth Road (Ml 340592a): Southfield Gardens-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

The Pitts, Ventnor, Isle Of Wight
02 June — 15 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) Ventnor at Ventnor: From Bonchurch Shute, West To Columns 4 & 5 (Ml 540183 & Ml 540292):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

West Street, Ventnor, Isle Of Wight
03 June — 16 June No carriageway incursion
Delays unlikely due to Streetworks
To Excavate In Footway For New Single Electric Service. Backfill And Reinstate. at O/S 10
Responsibility: Southern Electric
EToN status: Advanced planning

Wheelers Bay Road, Ventnor, Isle Of Wight
02 June — 15 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) Ventnor at Ventnor: Fr5om Wheels Bay Road, East To Dead End (Ml 540266):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Woodvale Road, Gurnard, Isle Of Wight
02 June — 03 June Some carriageway incursion
Delays unlikely due to Streetworks
Reinstatement To Be Carried Out On Interim Site at (Pcp37) Bduk. Outside 10 To Outside 12 On Woodvale Road.
Responsibility: BT
EToN status: Advanced planning

Image: Hills_Alive under CC BY 2.0