Road Closed at Undercliff Drive

Isle of Wight roadworks and road closures 3rd February 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

Bonchurch Village Road, Ventnor, Isle of Wight
03 February — 03 February
Delays likely due to Streetworks
Road closure at Bonchurch Village Road, Ventnor, Isle of Wight (Bonchurch Village Road, Bonchurch.) 03 February — 03 February
Diversion route at Bonchurch Village Road, Ventnor, Isle of Wight (Bonchurch Village Road, Bonchurch.) 03 February — 03 February
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
03 February — 05 February Traffic control (two-way signals)
Delays likely due to Streetworks
Sawcut And Infill Carriageway Repairs, X1 Patch 3.5mx2.4m Tm Two Way Lights Req (Cw: Pothole) Newport at Newport: S/B C/W O/S No 8: Parkhurst Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
04 February — 05 February Traffic control (two-way signals)
Delays likely due to Streetworks
Road Core Excavations Newport at Newport: From St Marys Roundabout To The Junction Of Clissold Road Ml’S 210017, 210018, 210019, 210020, 2100021: Parkhur
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Cowes Road, Newport, Isle Of Wight
04 February — 05 February Traffic control (two-way signals)
Delays likely due to Streetworks
Road Core Excavations Newport at Newport: From Stag Lane To Chawton Lane Ml’S 210025 /26/27/28: Cowes Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Horsebridge Hill, Newport, Isle Of Wight
04 February — 05 February Traffic control (two-way signals)
Delays likely due to Streetworks
Road Core Excavations Newport at Newport: From Clissold Road To Stag Lane Ml’S 210022, 210023, 210024: Horsebridge Hill-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Medina Way, Newport, Isle Of Wight
03 February — 04 February Lane closure
Delays likely due to Streetworks
Wjuk Lining Works Refresh Faded Dyls 34 Lms Tm Single Lane Closure, Recommend Out Of Hrs (H: Road Studs/Markings Missing) H1 Urban Newport at Newport: Please See Red Area On The Attached Highlighted Map. N/B C/W, Exit Lane In Front Of The Funeral Directors.: Med
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Northwood, Isle Of Wight
04 February — 05 February Traffic control (two-way signals)
Delays likely due to Streetworks
Road Core Excavations Northwood at Northwood: From Chawton Lane To Nodes Road, Northwood Ml’S 210029 /30/31: Newport Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 Well Road, East Cowes, Isle Of Wight
03 February — 05 February Traffic control (give & take)
Delays likely due to Streetworks
Install N? 2 Lanterns (N? 1 Column) 1 Parking Restriction Sign & 1 Festive Decoration East Cowes at East Cowes: From Junction Of Castle Street, East To Column 1 (Ml 110028):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 York Avenue, East Cowes, Isle Of Wight
03 February — 05 February Traffic control (give & take)
Delays likely due to Streetworks
Install N? 3 Lanterns (N? 2 Columns) 1 Festive Decoration East Cowes at East Cowes: Col 39 – At The Junction Of Well Road & York Avenue. Col 44 – Opposite The Junction Of Clarence Road (Ml 11
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
04 February — 09 February Traffic control (two-way signals)
Delays possible due to Streetworks
2 Way Lights Require To Access The Jrc Ground Box Os 85 Victoria Ave Shanklin Po37 6lt ,Including Bus Stop Suspension Tm- Work To Start On The 04/02/2016 To Finish On The 04/02/2016 Between The Hours Of 09:30 To 15:30, 2 Way Lights To Be Used And Lux Operative To Stay On Site To Monitor The Flow Of Traffic. at Os 85 Victoria Ave Shanklin Po37 6lt
Responsibility: BT
EToN status: Advanced planning

A3054 Forest Road, Newport, Isle Of Wight
03 February — 05 February Traffic control (two-way signals)
Delays possible due to Streetworks
Road Core Excavations Newport at Newport: From Public Footpath Number N49 To Public Footpath Number N47: Forest Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 High Street, Wootton, Isle Of Wight
03 February — 04 February Some carriageway incursion
Delays possible due to Streetworks
– Interim To Perm at Slipway,Wootton Bridge,Kite Hill,Wootton,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

B3323 Clatterford Road, Newport, Isle Of Wight
03 February — 05 February Traffic control (two-way signals)
Delays possible due to Streetworks
Sawcut And Infill Carriageway Repairs, X1 Patch 1.5mx1.5m Tm Two Way Lights Req & Npc Req Setting Out Prior To Site Attendance (Cw: Pothole) H3 Urban Newport at Newport: N/B C/W O/S 28 (Edge Of C/W): Clatterford Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3330 Eddington Road, St Helens, Isle Of Wight
04 February — 06 February Traffic control (two-way signals)
Delays possible due to Streetworks
Installation Of Gully Aprons On All Gullies St Helens at St Helens: Ml’S 330078 / 79 / 81 From Caws Avenue To 324 Metres South To The Access Road; And From St Helena’S Church To
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
03 February — 03 February Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Bembridge at Bembridge: From 180m Southeast Of Latimer Road 210m East (Ml 320130): Embankment Road-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
03 February — 03 February Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Newport at Newport: From 1440m East Of Elm Lane A Further 540m East (Ml 620170): Calbourne Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Mill Hill Road, Cowes, Isle Of Wight
03 February — 09 February Some carriageway incursion
Delays unlikely due to Streetworks
See Attached at 10 Mill Hill Road Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 Ferry Road, East Cowes, Isle Of Wight
03 February — 05 February Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 8 Lanterns (N? 1 Column) 1 Route/Direction & 2 Lit Warning Signs East Cowes at East Cowes: From York Avenue, West To Castle Street (Ml 110024):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
04 February — 08 February Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 31 Lanterns (N? 18 Columns) 1 No Waiting Sign, 3 Route/Direction Signs, 1 Resident Parking Permit Sign, 4 Warning Signs, 5 Lit Warning Signs, 14 Double Baskets & 1 Cctv Camera Ryde at Ryde: From The Junction Of St Thomas Street, East To Dover Street (Ml 310030, Ml 310060, Ml 310061, Ml 310062, Ml 310063
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Place Road, Cowes, Isle Of Wight
03 February — 05 February Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon ) Cowes at Cowes: From Place Road To Three Gates Road, Ml F10221: Place Road-Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Place Road, Cowes, Isle Of Wight
03 February — 05 February Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Cowes at Cowes: Link Footway From Three Gates Road 150mtrs Along Place Road (Ml F10221): Place Road-Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Bellevue Road, Ryde, Isle Of Wight
04 February — 12 February Some carriageway incursion
Delays unlikely due to Streetworks
Lay New Services From Nearside Carriageway To Site at Os Eastridge Site No 26
Responsibility: SGN
EToN status: Advanced planning

Broadwood Lane, Newport, Isle Of Wight
03 February — 08 February Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Newport at Newport: Whole Length Of Broadwood Lane To Beginning Of Forest Hills, 279m, Ml 240238: Broadwood Lane-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Mill Square, Wootton, Isle Of Wight
03 February — 05 February Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm at Mill Square Jct Kite Hill ,Wootton,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

School Lane, Newport, Isle Of Wight
03 February — 05 February Some carriageway incursion
Delays unlikely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at Os 26 Staplers Road On, School Lane
Responsibility: BT
EToN status: Advanced planning

Watergate Road, Newport, Isle Of Wight
04 February — 08 February Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 4, Watergate Rd, Newport
Responsibility: Southern Water
EToN status: Advanced planning

West Street, Seaview, Isle Of Wight
03 February — 12 February Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Farside Carriageway To Site at Os Albert Cottage
Responsibility: SGN
EToN status: Advanced planning