Roadworks lights:

Isle of Wight roadworks and road closures: 4th August 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3056 Sandown Road, Arreton, Isle Of Wight
05 August — 07 August Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – Gully Cover Breaking Needs Resetting Tm – Two Way Temp Lights (Cw: Pothole) Arreto at Arreton: Between Topline Windows And Pyle Cottages On The Newport Bound Side Of C/Way: Sandown Road-Arreton – 7167:; Sch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
05 August — 07 August Traffic control (multi-way signals)
Delays likely due to Streetworks
Lift The Cso Chamber Cover To Scope Required Works at @ Junc With Recreation Ground Rd
Responsibility: Southern Water
EToN status: Advanced planning

B3323 South Street, Newport, Isle Of Wight
05 August — 07 August Traffic control (multi-way signals)
Delays likely due to Streetworks
Lift The Cso Chamber Cover To Scope Required Works at O/S 71
Responsibility: Southern Water
EToN status: Advanced planning

B3330 St Johns Road, Ryde, Isle Of Wight
04 August — 07 August Road closure
Delays likely due to Streetworks
Install New Water Connections To New Site Next To The Community Centre, at New Site Next To : The Community Centre,St.Johns Road, Ryde.
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Leeson Road, Ventnor, Isle Of Wight
05 August — 07 August Traffic control (two-way signals)
Delays possible due to Streetworks
Please Rebed M/H Cover And Reinstate Sunken Surround 800 X 800 Mm. And 60 Mm Deep. Tm 2 Way Lights. Sent Back To Ir By Sws Ventnor at Ventnor: C/W. Rocking Cover With Broken Surround. On Centre Line.: Leeson Road-Ventnor
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
05 August — 07 August Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Install 4m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Verge,Install 8m Of 1 Way Poly Duct In Carriageway at O/S 49, Across C/W, To Cnr Of 50, Worsley Road
Responsibility: BT
EToN status: Advanced planning

A3055 Avenue Road, Freshwater, Isle Of Wight
05 August — 12 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Dees Scaffold) at O/S Colemans Carpet
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
05 August — 06 August No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice Fw For Ha Defect at Tarmac C/W & F/W O/S 8 , Sandown Road
Responsibility: BT
EToN status: Advanced planning

Albert Street, Ryde, Isle Of Wight
04 August — 06 August Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Works To Be Carried Out at O/S 30 Albert Street Ryde
Responsibility: SGN
EToN status: Advanced planning

West Street, Godshill, Isle Of Wight
04 August — 17 August No carriageway incursion
Delays unlikely due to Streetworks
313275 Godshill 1 – Street Cabinet & Power Installation. Excavate To Lay Approx 6mbt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 0.4m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at S/O Tree Tops West Street Godshill
Responsibility: BT
EToN status: Advanced planning

St James Street, Yarmouth, Isle Of Wight
05 August — 12 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Dees Scaffold) at O/S Saxonbury
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Station Road, Wootton, Isle Of Wight
05 August — 18 August Some carriageway incursion
Delays unlikely due to Streetworks
314031 Wooton Bridge 5 – Street Cabinet & Power Installation. Excavate To Lay Approx 5mbt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 2mduct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at Side Of 1 Station Road, Wootton Po33 4pu
Responsibility: BT
EToN status: Advanced planning

Newnham Road, Binstead, Isle Of Wight
05 August — 10 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead at Binstead: From Verwood Drive 200m North (Ml 330204): Newnham Road-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Castle Close, Ventnor, Isle Of Wight
04 August — 06 August Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Works To Be Carried Out at O/S No 7
Responsibility: SGN
EToN status: Advanced planning

Donnington Drive, Shanklin, Isle Of Wight
05 August — 06 August No carriageway incursion
Delays unlikely due to Streetworks
Remedial Work To Rectify Ha Defect In Fw at Sd7bex73, F/W O/S 22 , Donnington Drive
Responsibility: BT
EToN status: Advanced planning

Howard Road, Shanklin, Isle Of Wight
05 August — 13 August Traffic control (give & take)
Delays unlikely due to Streetworks
Disconnect Services In Carriageway at Os 5
Responsibility: SGN
EToN status: Advanced planning

Lind Hill, Ryde, Isle Of Wight
05 August — 07 August No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway at 29m South Of Junc Lind Street, Lind Hill
Responsibility: BT
EToN status: Advanced planning

Millfield Road, Newport, Isle Of Wight
05 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Newport at Newport: From Mountbatten Drive To Marlborough Road (Ml 240254): Millfield Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Pelham Close, Bembridge, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Fullrecon ) Bembridge at Bembridge: From Healthfield Road 50m North (Ml 360654): Pelham Close-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Pelham Close, Bembridge, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon ) Bembridge at Bembridge: From Healthfield Road 50m South (Ml 360653): Pelham Close-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Prospect Road, Shanklin, Isle Of Wight
05 August — 06 August No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice Fw For Ha Defect at (Pcp16) Outside 2, Prospect Road
Responsibility: BT
EToN status: Advanced planning

Quarry Road, Ryde, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwr: Bit Partrecon) Ryde at Ryde: From Well Street To Alfred Street (Ml 340441): Quarry Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Quarry Road, Ryde, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Slurry Fwr: Bit Partrecon) Ryde at Ryde: From Well Street To St Johns Hill (Ml 340440): Quarry Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Sandcove Rise, Seaview, Isle Of Wight
05 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Seaview at Seaview: First L/H Section Of Sandcove Rise (Ml 340591): Sandcove Rise-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Sandcroft Avenue, Ryde, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Ryde at Ryde: Last R/H Spur Along Sandcroft Avenue (Ml 360684): Sandcroft Avenue-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Sandcroft Avenue, Ryde, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Slurry) Ryde at Ryde: Second R/H Spur Along Sandcroft Avenue (Ml 360684): Sandcroft Avenue-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Sandcroft Avenue, Ryde, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Ryde at Ryde: Main Spine Of Road From Quarry Road (Ml 340610): Sandcroft Avenue-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

St Thomas Square, Newport, Isle Of Wight
04 August — 25 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (1st Choice Scaffolding) at O/S Capital Jewellers
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Steephill Road, Shanklin, Isle Of Wight
05 August — 06 August No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice Fw For Ha Defect at (Pcp16) Side Of 2 Prospect Road On , Steephill Road
Responsibility: BT
EToN status: Advanced planning

Well Street, Ryde, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Slurry ) Ryde at Ryde: From Quarry Road To Prince Street (Ml 340515): Well Street-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Well Street, Ryde, Isle Of Wight
04 August — 07 August Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon ) Ryde at Ryde: From High Street To Prince Street (Ml 340514): Well Street-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Woodlands Crescent, Wootton, Isle Of Wight
04 August — 11 August Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off – So45256 at Os 23
Responsibility: SGN
EToN status: Advanced planning

York Road, Totland, Isle Of Wight
04 August — 10 August Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Mr Skippy) at O/S Ravens Ridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Image: asvensson under CC BY 2.0