Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3020 Coppins Bridge, Newport, Isle Of Wight
06 October — 08 October Lane closure
Delays likely due to Streetworks
Coppins Bridge Scheme – Scour Repair, Concrete Slab. Newport at Newport: Under The Bridge: Coppins Bridge—A3020 Coppins Bridge, Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3321 Victoria Grove, East Cowes, Isle Of Wight
07 October — 07 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3 (Kerbed=Inlay/Unkerbed=Overlay) East Cowes at East Cowes: From Mayfield Road To York Avenue (Ml 130033): Victoria Grove-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3321 Victoria Grove, East Cowes, Isle Of Wight
07 October — 07 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3 (Kerbed=Inlay/Unkerbed=Overlay) East Cowes at East Cowes: Frm Mayfield Road To Adelaide Grove (Ml 130034): Victoria Grove-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3341 Trafalgar Road, Newport, Isle Of Wight
07 October — 07 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H3 Resurface 25mm Ul-M 65psv Plus Regulating Rural-:H/3(Kerbed=Inlay/Unkerbed=Overlay) Newport at Newport: From East View To St James Street (Ml 230090): Trafalgar Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3341 Trafalgar Road, Newport, Isle Of Wight
07 October — 07 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Surfacing (Ff-Ul-M:U/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban: H3) Newpor at Newport: From Carisbrooke Road Heading East For 300m (Ml 230089): Trafalgar Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Atherley Road, Shanklin, Isle Of Wight
06 October — 06 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H2, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Shankl at Shanklin: From Wilton Park Road To North Road (Ml420165) : Atherley Road-Shanklin:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Regent Street, Shanklin, Isle Of Wight
06 October — 06 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-Mandflexiand5%Recon:U/H2, Resurface 40 Mm Ul-M 65psv With Flexiplast System And 5% Reconstrucion-Urban:H2) Shankl at Shanklin: From Carter Road To Wilton Road (Ml420164): Regent Street-Shanklin:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3056 Arreton Street, Arreton, Isle Of Wight
06 October — 12 October Traffic control (two-way signals)
Delays possible due to Streetworks
Replacement Of Anti-Skid Surfacing (Post Cip Work). Tm = 2 Way Lights Arreton at Arreton: From Opposite Stickworth Lane To Opposite Driveway To ‘Challen Way’, Southbound Carriageway: Arreton Street-Arr
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3325 High Street, Cowes, Isle Of Wight
07 October — 12 October Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Isl Scaffolding) at O/S 63
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Downside, Ventnor, Isle Of Wight
07 October — 15 October Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Farside Footway To Site at Os 37
Responsibility: SGN
EToN status: Advanced planning
Mitchells Road, Ryde, Isle Of Wight
06 October — 15 October Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Farside Carriageway To Site at Os 28
Responsibility: SGN
EToN status: Advanced planning
Mount Pleasant Road, Newport, Isle Of Wight
06 October — 12 October Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Westridge Skip Hire) at Mount Pleasant Road
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning