Road Closed

Isle of Wight roadworks and road closures 11th May

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
11 May — 12 May
Delays likely Traffic control (two-way signals)
Works location: Newport: On Approach To Pedestrian Crossing North Of Lonsdale Avenue, Southbound C/Way: Parkhurst Road-Newport
Works description: Installation Of High Friction Surfacing (Buff / Grey) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
12 May — 17 May
Delays likely Traffic control (give & take)
Works location: Shalfleet: From Junction With Victoria Road, 330m West, Ml 610023: Bouldnor Road-Shalfleet
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Fullrecon) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Arnold Road, Binstead, Isle Of Wight
12 May — 03 June
Delays likely Road closure
Works location: Binstead: From Binstead Hill To Chapel Road (Ml340448): Arnold Road-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Arnold Road, Binstead, Isle Of Wight
12 May — 05 June
Delays likely Road closure
Works location: Binstead: From Chapel Road To Hawthorn Close (Ml340449): Arnold Road-Binstead:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
12 May — 17 May
Delays likely Traffic control (give & take)
Works location: Newport: From Junction With Trafalgar Road To Wellington Road, 296m, Ml 210073: Carisbrooke Road-Newport
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399 Brook Shute, Brook, Brighstone, Isle Of Wight
12 May — 04 June
Delays likely Road closure
Works location: Brighstone: Ml 630114 From Footpath Leading To Brook Down To A Point 366 Meters South Thereof: Brook Shute-Brighstone
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) (Kerbed=Inlay/Unkerbed=Overlay) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399 Brook Shute, Brook, Brighstone, Isle Of Wight
12 May — 15 June
Delays likely Road closure
Works location: Brighstone: Ml 630115 From The Junction Of Brook Village Road To A Point 387 Meters North Thereof: Brook Shute-Brighston
Works description: Carriageway Resurfacing Schemeinclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames, Lining Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Church Road, Binstead, Isle Of Wight
11 May — 17 May
Delays likely Road closure
Works location: Binstead: Ml 340502 From The Junction With Binstead Road To Quarr Road: Church Road-Binstead
Works description: Footway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Reinstatement Of Access, Quartering Etc. Resurfacing Of The Footway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

John Street, Newport, Isle Of Wight
11 May — 11 July
Delays likely Road closure
Works location: Newport: From Robin Hood Street 50m East (Ml260421): John Street-Newport:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Hollow, Newport, Isle Of Wight
11 May — 13 May
Delays possible Traffic control (two-way signals)
Works location: Newport: Pidford Manor, Blackwater Hollow/Main Road Rookley: Blackwater Hollow-Newport – 7113
Works description: Lower Gulley And Contour Carriageway To Allow Water To Run Into Gully Tm: 2 Way Lights Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Mill Hill Road, Cowes, Isle Of Wight
11 May — 13 May
Delays possible Traffic control (multi-way signals)
Works location: Cowes: Jct Gordon Road: Mill Hill Road-Cowes
Works description: Multiple Patches Of Delamination. Depth 40mm. Patches 4.4m X 1.2m & 2.6m X 0.6m. * 3-Way T/L’S. (Cw: Pothole) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Forest Road, Newport, Isle Of Wight
11 May — 13 May
Delays possible Traffic control (two-way signals)
Works location: Newport: On The Newport Bound Side Of The C/Way Appx 150m From The Jnc With Whitehouse Road: Forest Road-Newport
Works description: Idr – Gully Cover Depressed And Starting To Breakout Reset To Level Tm – Two Way Temp Lights (Gl: Ironwork Rocking/Corrosion) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
12 May — 16 May
Delays possible Traffic control (Stop/Go boards)
Works location: Frm In F/W 43m North East Frm Rear Of 1 Redwing Quay To Across C/W To In F/W 43m North East Frm Opp Rear Of 1 Redwing Qu
Works description: Install 3m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

B3399 Limerstone Road, Brighstone, Isle Of Wight
11 May — 11 May
Delays possible Traffic control (Stop/Go boards)
Works location: Brighstone: Ml 630128/29/30: Limerstone Road-Brighstone
Works description: Road Core Excavations Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399 Limerstone Road, Shorwell, Isle Of Wight
11 May — 11 May
Delays possible Traffic control (Stop/Go boards)
Works location: Shorwell: Ml’S 630131/32 From Muggleton Lane To Approx 900m East: Limerstone Road-Shorwell
Works description: Road Core Excavations Shorwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399 Walkers Lane, Shorwell, Isle Of Wight
11 May — 11 May
Delays possible Traffic control (Stop/Go boards)
Works location: Shorwell: 640133 From Farriers Way To Approx 300 Metres West: Walkers Lane-Shorwell
Works description: Road Core Excavations Shorwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Stroud Wood Road, Havenstreet, Ryde, Isle Of Wight
11 May — 13 May
Delays possible Traffic control (two-way signals)
Works location: Ryde: Ml 320228 From The Junction Of Kemphill Farm Access To Carters Road: Stroud Wood Road-Ryde
Works description: Surfacing Preparatory Works. Accommodation Works To Allow For Resurfacing. Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 High Street, Cowes, Isle Of Wight
12 May — 01 June
Delays unlikely Some carriageway incursion
Works location: O/S 92
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 Park Road, Cowes, Isle Of Wight
11 May — 11 May
Delays unlikely Traffic control (priority working)
Works location: Cowes: Debourne Close Through To Renyolds Close (Ml 110047): Park Road-Cowes
Works description: Surfacing Post Works. Installation Of Safety Markers, Like For Like Replacement. Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3326 The Strand, Ryde, Isle Of Wight
11 May — 24 May
Delays unlikely Some carriageway incursion
Works location: Os 16 – 20
Works description: Excavation In Footway For New Electriciity Supply. Backfill And Reinstate On Completion Of Works
Responsibility for works: Southern Electric
Current status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
11 May — 17 May
Delays unlikely Some carriageway incursion
Works location: O/S 12b
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 High Street, Carisbrooke, Isle Of Wight
12 May — 18 May
Delays unlikely No carriageway incursion
Works location: S/O 198 Carisbrooke Road On, High Street
Works description: Install 1m Of 3 Poly Ducts In Footway,Provide 3 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Yarborough Road, East Cowes, Isle Of Wight
12 May — 25 May
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Whole Length Of Road From Adelaide Grove To Clarence Road, 227m, Ml 140079: Yarborough Road-East Cowes
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Esplanade, Shanklin, Isle Of Wight
12 May — 13 May
Delays unlikely Some carriageway incursion
Works location: Outside Shanklin Rowing Club
Works description: Repair Of Collapsed Sewer In Carriageway.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

King James Close, Cowes, Isle Of Wight
11 May — 13 May
Delays unlikely Traffic control (give & take)
Works location: Cowes: Whole Length From Crossfield Avenue (Ml 160154): King James Close-Cowes
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Madeira Road, Ventnor, Isle Of Wight
11 May — 20 May
Delays unlikely Some carriageway incursion
Works location: Outside No 59
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Monks Brook, Newport, Isle Of Wight
11 May — 24 May
Delays unlikely Traffic control (give & take)
Works location: Newport: On The Roundabout Outside Gurit & On The Roundabout Outside The Apex (Ml 240176 & Ml 240363):
Works description: Replacement Of N� 9 Signs (9 X Roundabout Signs) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mountbatten Drive, Newport, Isle Of Wight
11 May — 24 May
Delays unlikely Traffic control (give & take)
Works location: Newport: At & Just South Of The Junction Of Ward Close & Mountbatten Drive (Ml 230155):
Works description: Replacement Of N� 2 Signs (1 X Cycle Path & 1 X Hump) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

South View, Newport, Isle Of Wight
11 May — 24 May
Delays unlikely Traffic control (give & take)
Works location: Newport: At The Junction Of West View & South View (Ml 240221):
Works description: Replacement Of N� 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St James Close, East Cowes, Isle Of Wight
12 May — 16 May
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Whole Length Of Footway From Oak Tree Way (Ml 163290): St James Close-East Cowes
Works description: Footway Reconstruction And Surfacing (Fwl: Bit Fullrecon Fwr: Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sylvan Drive, Newport, Isle Of Wight
11 May — 24 May
Delays unlikely Traffic control (give & take)
Works location: Newport: From The Junction With Foxes Road, West To Outside N� 135 (Ml 230333, Ml 230335 & Ml 240154):
Works description: Replacement Of N� 4 Signs (2 X Cycle Path, 1 X Hump & 1 X Give Way) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ward Close, Carisbrooke, Isle Of Wight
11 May — 24 May
Delays unlikely Traffic control (give & take)
Works location: Carisbrooke: Half Way Down Cycle Track Off Ward Close (Ml 240154):
Works description: Replacement Of N� 1 Sign (1 X Cycle Path) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Zahlm under CC BY 2.0