Roadworks:

Isle of Wight roadworks and road closures 12th September 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

Streetworks / Licence, Streetworks
Carriageway reconstruction, planing and resurfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Blackbridge Road
Location: at A3055 Military Road, Freshwater, Isle of Wight (Blackbridge Road)
12 September — 28 October

Diversion route
Name: Diversion
Location: at A3055 Military Road, Freshwater, Isle of Wight (Diversion)
12 September — 07 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Latimer Road
Location: at Latimer Road, St Helens, Isle of Wight (Latimer Road)
13 September — 23 September

Diversion route
Name: Diversion
Location: at Latimer Road, St Helens, Isle of Wight (Diversion)
13 September — 15 September
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
Resurfacing of the carriageway. Post works to kerbs, access, drainage, utility covers and frames and lining
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Road closure
Name: Church Hill
Location: at Sheepwash Lane, Godshill, Isle of Wight (Church Hill)
12 September — 30 September

Diversion route
Name: Diversion
Location: at Sheepwash Lane, Godshill, Isle of Wight (Diversion)
12 September — 30 September
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Roadworks
A3020 Coppins Bridge, Newport, Isle Of Wight
12 September — 12 October
Delays likely Road closure
Works location: Newport: Ml 210006 From East Street, Newport Clockwise To The Junction Of Barton Road: Coppins Bridge-Newport
Works description: Carriageway Reconsturction, Planing And Resurfacing. Ff-Ul-M/H1 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Coppins Bridge, Newport, Isle Of Wight
12 September — 12 October
Delays likely Road closure
Works location: Newport: Ml 210007 Clockwise From Barton Road To East Street: Coppins Bridge-Newport
Works description: Carriageway Reconsturction, Planing And Resurfacing. Ff-Ul-M/H1 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Binstead Road, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: Just West Of J/O Ringwood Road: Binstead Road-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Binstead Road, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: Just East Of J/O Ringwood Road: Binstead Road-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
12 September — 12 October
Delays likely Road closure
Works location: Newport: From Coppins Bridge To Fairlee Link Road (Ml 210047a): Fairlee Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From 480m West Of Compton Farm Lane A Further 610 M West (Ml620065): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: Ml 620064 750 Metres To 1250 Metres From The Junction Of South Down Road: Military Road-Freshwater
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From Compton Farm Entrance 490m South East Thereof (Ml620067): Military Road-Freshwater:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From 500m East Of Compton Farm Lane To Dunsbury Grange Entrance (Ml620068): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: (Ml 620062) From Afton Road To A Point 460 Metres East By The Car Park: Military Road-Freshwater
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: Ml 620063 From The Car Park East Of Southdown Road, To A Point 500 Metres East: Military Road-Freshwater
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From 2070m Southeast Of Afton Road A Further 480m South (Ml620066): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2)) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From Dunsbury Grange Entrance 500m East (Ml620069): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Argyll Street, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: O/S Nos. 71-77: Argyll Street-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Argyll Street, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: Approx 10m From J/O Pellhurst Road, Heading West: Argyll Street-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Steyne Road, Bembridge, Isle Of Wight
12 September — 23 December
Delays likely Road closure
Works location: Bembridge: From Junction With Lane End Road To Hillway, Ml 330118/119: Steyne Road-Bembridge
Works description: Drainage Construction In Carriageway Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
12 September — 24 September
Delays likely Road closure
Works location: Arreton: On Bend Between Knighton Shute And Rowlands Lane: Mersley Downs Road-Arreton
Works description: Installation Of High Friction Surfacing Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
12 September — 24 September
Delays likely Road closure
Works location: Arreton: J/O Rowlands Lane, Eastbound C/Way: Mersley Downs Road-Arreton
Works description: Installation Of High Friction Surfacing Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
12 September — 24 September
Delays likely Road closure
Works location: Arreton: J/O Lime Kiln Shute, Westbound C/Way: Mersley Downs Road-Arreton
Works description: Installation Of High Friction Surfacing Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Caws Avenue, Nettlestone, Isle Of Wight
13 September — 16 September
Delays likely Road closure
Works location: Nettlestone: Ml 340494 From Approx 24 Metres South Of Cherrytree Road To Cedar Wood Drive: Caws Avenue-Nettlestone
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Caws Avenue, Nettlestone, Isle Of Wight
13 September — 16 September
Delays likely Road closure
Works location: Nettlestone: Ml 340493 From The Junction With Eddington Road, To 24 Metres Before The Junction To Cherrytree Road: Caws
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Caws Avenue, Nettlestone, Isle Of Wight
13 September — 16 September
Delays likely Road closure
Works location: Nettlestone: Ml 340495 From Cedar Wood Drive To Solent View Road: Caws Avenue-Nettlestone
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Collingwood Road, Shanklin, Isle Of Wight
12 September — 23 September
Delays likely Road closure
Works location: Shanklin: From Northbourne Avenue To The End Of Collingwood Road, 128m, Ml 440243: Collingwood Road-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit 50% Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Brading, Isle Of Wight
13 September — 15 September
Delays likely Road closure
Works location: Brading: O/S No.66: High Street-Brading – 1445
Works description: Idr – Gully Cover O/S Of This Property Is Rocking Ang The Surrounding Surface Is Breaking Up Reset To Level Tm – Two Way Temp Lights (Gl: Ironwork Rocking/Corrosion) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Latimer Road, St Helens, Isle Of Wight
13 September — 23 September
Delays likely Road closure
Works location: St Helens: From Station Road 185m West (Ml330309): Latimer Road-St Helens:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3) St Hel
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Marsh Green, Brighstone, Isle Of Wight
12 September — 16 September
Delays likely Road closure
Works location: Brighstone: Between Mill Lane & Military Road (Ml 640572): Marsh Green-Brighstone
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Scarrots Lane, Newport, Isle Of Wight
12 September — 14 September
Delays likely Road closure
Works location: 97-99 St. James Street, Newport, Isle Of Wight.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning

Sheepwash Lane, Godshill, Isle Of Wight
12 September — 30 September
Delays likely Road closure
Works location: Godshill: Ml 540191 From The Access Road To The Iow Gun Club To The Junction With Hollow Lane: Sheepwash Lane-Godshill
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sheepwash Lane, Godshill, Isle Of Wight
12 September — 30 September
Delays likely Road closure
Works location: Godshill: 540190 From Sheepwash Farm To The Access Road To Iow Gun Club, Approx 650 Metres In Total.: Sheepwash Lane-God
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St James Street, Newport, Isle Of Wight
12 September — 14 September
Delays likely Traffic control (give & take)
Works location: Outside 105 St. James Square – On St. James Street, Newport, Po30 1ur
Works description: Temp To Perm Reinstatement In The Footway And Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Forest Road, Newport, Isle Of Wight
13 September — 16 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Public Footpath N49 To Footpath N50, 230m, Ml210042: Forest Road-Newport
Works description: Footway Reconstruction And Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 West Street, Ryde, Isle Of Wight
13 September — 15 September
Delays possible Traffic control (multi-way signals)
Works location: Ryde: Opp No 39, O/S 42 And 43west Street: West Street-Ryde
Works description: Idr – C/W Pot Hole Requires Patch 0.4 X 0.4 X 40mm 0.4 X 0.3 X 35mm 0.3 X 0.3 X 50mm Patch 1.0 X 1.0 X 50mm 0.9 X 0.9 X 40mm Tm – Stop & Go Boards (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Stroud Road, Freshwater, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: 12, Stroud Road,Freshwater,Iow.
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3056 Newport Road, Apse Heath, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Apse Heath: Onthe Newport Bound Side Of The C/Way O/S Crossways: Newport Road-Apse Heath
Works description: Idr – Plastic Bollard/S Unserviceable X1 No.’S , 1101, On A 50mph C/Way So Too Dangerous To Stop And Fill On Mobile Works And Photograph Please Replace Old With A New One Tm – Two Way Temp Lights (H: Street Furnitre Faulty/Dmge) Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3322 Alum Bay New Road, Totland, Isle Of Wight
12 September — 21 September
Delays possible Traffic control (two-way signals)
Works location: O/S Lingwood To A Furthur 90m North On Alum Bay New Road
Works description: Install 1m Of 1 Way Poly Duct In Verge,Install 25m Of 1 Way Poly Duct In Carriageway,Install 67m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

B3322 Church Hill, Totland, Isle Of Wight
12 September — 21 September
Delays possible Traffic control (two-way signals)
Works location: Opp Junc Of York Road To A Futhur 45m North On Church Hill
Works description: Install 45m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S Nos. 23-27: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S Nos. 102-104: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: J/O Lowtherville Road: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S Nos.71-75: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Carisbrooke, Isle Of Wight
12 September — 25 September
Delays possible Some carriageway incursion
Works location: O/S 58-60
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Undercliff Drive, Niton, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Niton: Undercliff Drive, 100m West Of Mirables Turning (Ml 530040): Undercliff Drive-Niton
Works description: Geotechnical Scheme – Installation Of Monitoring Equipment Niton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Crozier Road, Yarmouth, Isle Of Wight
12 September — 22 September
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: Whole Length Of Road From Junction With Graeme Road, Ml 642357a: Crozier Road-Yarmouth
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Fullrecon) Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Greenlands Road, East Cowes, Isle Of Wight
12 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Short Spur At Top Right Hand Corner Of Greenlands Road, 25m, Ml 140248a: Greenlands Road-East Cowe
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Greenlands Road, East Cowes, Isle Of Wight
12 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Left Hand Spur At End Of Greenlands Roads, Ml 140248b: Greenlands Road-East Cowes
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Holyrood Street, Newport, Isle Of Wight
12 September — 18 September
Delays unlikely Some carriageway incursion
Works location: 23 Holyrood Street
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Old Road, East Cowes, Isle Of Wight
13 September — 16 September
Delays unlikely Traffic control (give & take)
Works location: Opposite No.1 Old Road In Old Road In Footway & Carriageway.
Works description: Excavate & Connect To Esp Gas Main Providing Gas Supply To New Housing Development. Approx Dimensions: 25m X 0.5m Footway, 1m X 0.5m Carriageway. Depth: 0.8m.
Responsibility for works: E S Pipelines Ltd
Current status: Advanced planning

Salisbury Road, Ryde, Isle Of Wight
13 September — 21 September
Delays unlikely Traffic control (give & take)
Works location: Os 27
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

St Cross Lane, Newport, Isle Of Wight
12 September — 09 October
Delays unlikely Some carriageway incursion
Works location: O/S St Cross House
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Strand, Ryde, Isle Of Wight
12 September — 14 September
Delays unlikely Some carriageway incursion
Works location: Outside 58 The Strand, Ryde, Po33 1jd
Works description: Temp To Perm Reinstatement In The Footway
Responsibility for works: Southern Water
Current status: Advanced planning

Image: sjdunphy under CC BY 2.0