Isle of Wight roadworks or road closures starting today or tomorrow.
Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.
Streetworks / Licence, Streetworks
Carriageway reconstruction, planing and resurfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Blackbridge Road
Location: at A3055 Military Road, Freshwater, Isle of Wight (Blackbridge Road)
12 September — 28 October
Diversion route
Name: Diversion
Location: at A3055 Military Road, Freshwater, Isle of Wight (Diversion)
12 September — 07 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Streetworks / Licence, Streetworks
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Latimer Road
Location: at Latimer Road, St Helens, Isle of Wight (Latimer Road)
13 September — 23 September
Diversion route
Name: Diversion
Location: at Latimer Road, St Helens, Isle of Wight (Diversion)
13 September — 15 September
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Resurfacing of the carriageway. Post works to kerbs, access, drainage, utility covers and frames and lining
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Church Hill
Location: at Sheepwash Lane, Godshill, Isle of Wight (Church Hill)
12 September — 30 September
Diversion route
Name: Diversion
Location: at Sheepwash Lane, Godshill, Isle of Wight (Diversion)
12 September — 30 September
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Roadworks
A3020 Coppins Bridge, Newport, Isle Of Wight
12 September — 12 October
Delays likely Road closure
Works location: Newport: Ml 210006 From East Street, Newport Clockwise To The Junction Of Barton Road: Coppins Bridge-Newport
Works description: Carriageway Reconsturction, Planing And Resurfacing. Ff-Ul-M/H1 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Coppins Bridge, Newport, Isle Of Wight
12 September — 12 October
Delays likely Road closure
Works location: Newport: Ml 210007 Clockwise From Barton Road To East Street: Coppins Bridge-Newport
Works description: Carriageway Reconsturction, Planing And Resurfacing. Ff-Ul-M/H1 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Binstead Road, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: Just West Of J/O Ringwood Road: Binstead Road-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Binstead Road, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: Just East Of J/O Ringwood Road: Binstead Road-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Fairlee Road, Newport, Isle Of Wight
12 September — 12 October
Delays likely Road closure
Works location: Newport: From Coppins Bridge To Fairlee Link Road (Ml 210047a): Fairlee Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From 480m West Of Compton Farm Lane A Further 610 M West (Ml620065): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: Ml 620064 750 Metres To 1250 Metres From The Junction Of South Down Road: Military Road-Freshwater
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From Compton Farm Entrance 490m South East Thereof (Ml620067): Military Road-Freshwater:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From 500m East Of Compton Farm Lane To Dunsbury Grange Entrance (Ml620068): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: (Ml 620062) From Afton Road To A Point 460 Metres East By The Car Park: Military Road-Freshwater
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: Ml 620063 From The Car Park East Of Southdown Road, To A Point 500 Metres East: Military Road-Freshwater
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From 2070m Southeast Of Afton Road A Further 480m South (Ml620066): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2)) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
12 September — 28 October
Delays likely Road closure
Works location: Freshwater: From Dunsbury Grange Entrance 500m East (Ml620069): Military Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Argyll Street, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: O/S Nos. 71-77: Argyll Street-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Argyll Street, Ryde, Isle Of Wight
12 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: Ryde: Approx 10m From J/O Pellhurst Road, Heading West: Argyll Street-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3395 Steyne Road, Bembridge, Isle Of Wight
12 September — 23 December
Delays likely Road closure
Works location: Bembridge: From Junction With Lane End Road To Hillway, Ml 330118/119: Steyne Road-Bembridge
Works description: Drainage Construction In Carriageway Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Mersley Downs Road, Arreton, Isle Of Wight
12 September — 24 September
Delays likely Road closure
Works location: Arreton: On Bend Between Knighton Shute And Rowlands Lane: Mersley Downs Road-Arreton
Works description: Installation Of High Friction Surfacing Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Mersley Downs Road, Arreton, Isle Of Wight
12 September — 24 September
Delays likely Road closure
Works location: Arreton: J/O Rowlands Lane, Eastbound C/Way: Mersley Downs Road-Arreton
Works description: Installation Of High Friction Surfacing Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Mersley Downs Road, Arreton, Isle Of Wight
12 September — 24 September
Delays likely Road closure
Works location: Arreton: J/O Lime Kiln Shute, Westbound C/Way: Mersley Downs Road-Arreton
Works description: Installation Of High Friction Surfacing Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Caws Avenue, Nettlestone, Isle Of Wight
13 September — 16 September
Delays likely Road closure
Works location: Nettlestone: Ml 340494 From Approx 24 Metres South Of Cherrytree Road To Cedar Wood Drive: Caws Avenue-Nettlestone
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Caws Avenue, Nettlestone, Isle Of Wight
13 September — 16 September
Delays likely Road closure
Works location: Nettlestone: Ml 340493 From The Junction With Eddington Road, To 24 Metres Before The Junction To Cherrytree Road: Caws
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Caws Avenue, Nettlestone, Isle Of Wight
13 September — 16 September
Delays likely Road closure
Works location: Nettlestone: Ml 340495 From Cedar Wood Drive To Solent View Road: Caws Avenue-Nettlestone
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Collingwood Road, Shanklin, Isle Of Wight
12 September — 23 September
Delays likely Road closure
Works location: Shanklin: From Northbourne Avenue To The End Of Collingwood Road, 128m, Ml 440243: Collingwood Road-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit 50% Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
High Street, Brading, Isle Of Wight
13 September — 15 September
Delays likely Road closure
Works location: Brading: O/S No.66: High Street-Brading – 1445
Works description: Idr – Gully Cover O/S Of This Property Is Rocking Ang The Surrounding Surface Is Breaking Up Reset To Level Tm – Two Way Temp Lights (Gl: Ironwork Rocking/Corrosion) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Latimer Road, St Helens, Isle Of Wight
13 September — 23 September
Delays likely Road closure
Works location: St Helens: From Station Road 185m West (Ml330309): Latimer Road-St Helens:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3) St Hel
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Marsh Green, Brighstone, Isle Of Wight
12 September — 16 September
Delays likely Road closure
Works location: Brighstone: Between Mill Lane & Military Road (Ml 640572): Marsh Green-Brighstone
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Scarrots Lane, Newport, Isle Of Wight
12 September — 14 September
Delays likely Road closure
Works location: 97-99 St. James Street, Newport, Isle Of Wight.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning
Sheepwash Lane, Godshill, Isle Of Wight
12 September — 30 September
Delays likely Road closure
Works location: Godshill: Ml 540191 From The Access Road To The Iow Gun Club To The Junction With Hollow Lane: Sheepwash Lane-Godshill
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Sheepwash Lane, Godshill, Isle Of Wight
12 September — 30 September
Delays likely Road closure
Works location: Godshill: 540190 From Sheepwash Farm To The Access Road To Iow Gun Club, Approx 650 Metres In Total.: Sheepwash Lane-God
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St James Street, Newport, Isle Of Wight
12 September — 14 September
Delays likely Traffic control (give & take)
Works location: Outside 105 St. James Square – On St. James Street, Newport, Po30 1ur
Works description: Temp To Perm Reinstatement In The Footway And Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
13 September — 16 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Public Footpath N49 To Footpath N50, 230m, Ml210042: Forest Road-Newport
Works description: Footway Reconstruction And Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 West Street, Ryde, Isle Of Wight
13 September — 15 September
Delays possible Traffic control (multi-way signals)
Works location: Ryde: Opp No 39, O/S 42 And 43west Street: West Street-Ryde
Works description: Idr – C/W Pot Hole Requires Patch 0.4 X 0.4 X 40mm 0.4 X 0.3 X 35mm 0.3 X 0.3 X 50mm Patch 1.0 X 1.0 X 50mm 0.9 X 0.9 X 40mm Tm – Stop & Go Boards (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Stroud Road, Freshwater, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: 12, Stroud Road,Freshwater,Iow.
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
A3056 Newport Road, Apse Heath, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Apse Heath: Onthe Newport Bound Side Of The C/Way O/S Crossways: Newport Road-Apse Heath
Works description: Idr – Plastic Bollard/S Unserviceable X1 No.’S , 1101, On A 50mph C/Way So Too Dangerous To Stop And Fill On Mobile Works And Photograph Please Replace Old With A New One Tm – Two Way Temp Lights (H: Street Furnitre Faulty/Dmge) Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3322 Alum Bay New Road, Totland, Isle Of Wight
12 September — 21 September
Delays possible Traffic control (two-way signals)
Works location: O/S Lingwood To A Furthur 90m North On Alum Bay New Road
Works description: Install 1m Of 1 Way Poly Duct In Verge,Install 25m Of 1 Way Poly Duct In Carriageway,Install 67m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
B3322 Church Hill, Totland, Isle Of Wight
12 September — 21 September
Delays possible Traffic control (two-way signals)
Works location: Opp Junc Of York Road To A Futhur 45m North On Church Hill
Works description: Install 45m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning
B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S Nos. 23-27: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S Nos. 102-104: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: J/O Lowtherville Road: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Newport Road, Ventnor, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S Nos.71-75: Newport Road-Ventnor
Works description: Installation Of High Friction Surfacing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
High Street, Carisbrooke, Isle Of Wight
12 September — 25 September
Delays possible Some carriageway incursion
Works location: O/S 58-60
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Undercliff Drive, Niton, Isle Of Wight
12 September — 14 September
Delays possible Traffic control (two-way signals)
Works location: Niton: Undercliff Drive, 100m West Of Mirables Turning (Ml 530040): Undercliff Drive-Niton
Works description: Geotechnical Scheme – Installation Of Monitoring Equipment Niton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Crozier Road, Yarmouth, Isle Of Wight
12 September — 22 September
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: Whole Length Of Road From Junction With Graeme Road, Ml 642357a: Crozier Road-Yarmouth
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Fullrecon) Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Greenlands Road, East Cowes, Isle Of Wight
12 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Short Spur At Top Right Hand Corner Of Greenlands Road, 25m, Ml 140248a: Greenlands Road-East Cowe
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Greenlands Road, East Cowes, Isle Of Wight
12 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Left Hand Spur At End Of Greenlands Roads, Ml 140248b: Greenlands Road-East Cowes
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Holyrood Street, Newport, Isle Of Wight
12 September — 18 September
Delays unlikely Some carriageway incursion
Works location: 23 Holyrood Street
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Old Road, East Cowes, Isle Of Wight
13 September — 16 September
Delays unlikely Traffic control (give & take)
Works location: Opposite No.1 Old Road In Old Road In Footway & Carriageway.
Works description: Excavate & Connect To Esp Gas Main Providing Gas Supply To New Housing Development. Approx Dimensions: 25m X 0.5m Footway, 1m X 0.5m Carriageway. Depth: 0.8m.
Responsibility for works: E S Pipelines Ltd
Current status: Advanced planning
Salisbury Road, Ryde, Isle Of Wight
13 September — 21 September
Delays unlikely Traffic control (give & take)
Works location: Os 27
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
St Cross Lane, Newport, Isle Of Wight
12 September — 09 October
Delays unlikely Some carriageway incursion
Works location: O/S St Cross House
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
The Strand, Ryde, Isle Of Wight
12 September — 14 September
Delays unlikely Some carriageway incursion
Works location: Outside 58 The Strand, Ryde, Po33 1jd
Works description: Temp To Perm Reinstatement In The Footway
Responsibility for works: Southern Water
Current status: Advanced planning