Isle of Wight roadworks or road closures starting today or tomorrow.
Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.
Sandown Road, Lake, Isle Of Wight
23 September — 23 September
Delays likely Traffic control (two-way signals)
Works location: Lake: Near Junction With Heath Road, Sandown Road, Lake, Ml 410042: Sandown Road-Lake
Works description: Raise Buried Sv Cover Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Mitchell Avenue, Ventnor, Isle Of Wight
23 September — 30 September
Delays possible Traffic control (two-way signals)
Works location: Ventnor: From Junction With Spring Hill To Junction With Macrocarpa Road, 300m, Ml 520066: Mitchell Avenue-Ventnor
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Staplers Road, Newport, Isle Of Wight
22 September — 23 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Monkey Haven Towards Newport As Far As The Roundabout At The Junction With Long Lane Roundabout:
Works description: Please Cut Back Overhanging Branches And Hedges That Are Encroaching Vehicles Using This Section Of Carriageway (Tr: Tree Pruning Request) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Broadway Crescent, Binstead, Isle Of Wight
23 September — 03 October
Delays unlikely Some carriageway incursion
Works location: Os 65
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning
Park Road, Ryde, Isle Of Wight
22 September — 05 October
Delays unlikely Some carriageway incursion
Works location: In Footway From O/S Substation To Junc With Barfield…
Works description: Excavation Of Joint Hole In Carriageway To Provide New Electrical Supplies To New Flats At Barfield…
Responsibility for works: Southern Electric
Current status: Advanced planning
Camp Road, Freshwater, Isle Of Wight
22 September — 30 September
Delays unlikely Some carriageway incursion
Works location: Os Halcyon
Works description: Relay Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Church Hill, Totland, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: O/S Sunnybank Cottages, Church Hill
Works description: Locate And Excavate 1 Blockage In Existing Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
Elm Lane, Calbourne, Isle Of Wight
22 September — 23 September
Delays unlikely Some carriageway incursion
Works location: 442497 087060 In Verge Opposite 7, Elm Lane
Works description: Replace 1 Existing Pole
Responsibility for works: BT
Current status: Advanced planning
Fitzroy Street, Sandown, Isle Of Wight
22 September — 05 October
Delays unlikely Some carriageway incursion
Works location: 2 Fitzroy Street Sandown Isle Of Wight Po36 8hy
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Green Street, Ryde, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: 459018 092222 O/S Greenmount Primary School, Green Street
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Advanced planning
Heath Gardens, Lake, Isle Of Wight
22 September — 26 September
Delays unlikely Some carriageway incursion
Works location: 15, Heath Gdns, Sandown, Po368pq
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
High Street, Yarmouth, Isle Of Wight
22 September — 05 October
Delays unlikely Some carriageway incursion
Works location: Dentist, High Street, Yarmouth
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Lanes End, Totland, Isle Of Wight
23 September — 27 September
Delays unlikely No carriageway incursion
Works location: O/S 61 Lanes End
Works description: Build 1 Precast Jointing Chamber(S) (350mm X 200mm) 300mm
Responsibility for works: BT
Current status: Advanced planning
Madeira Road, Ventnor, Isle Of Wight
22 September — 30 September
Delays unlikely Some carriageway incursion
Works location: Os 45
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Mews Lane, Newport, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: 26m North West From Junc Newport Footpath 117 To 98m South West From Junc Newport Footpath 117, Mews Lane
Works description: Install 180m Of Cables In Verge
Responsibility for works: BT
Current status: Advanced planning
Quay Street, Yarmouth, Isle Of Wight
22 September — 28 September
Delays unlikely Some carriageway incursion
Works location: O/S The Chemist, Quay Street, Yarmouth
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Whitcombe Road, Newport, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: 409m South East From Junc Caste Lane On, Whitcombe Road
Works description: Install 1m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning