Isle of Wight roadworks or road closures starting today or tomorrow.
Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.
Streetworks / Licence, Streetworks
Carriageway resurfacing works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: New Barn Road
Location: at New Barn Road, East Cowes, Isle of Wight (New Barn Road)
25 November — 09 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Carriageway resurfacing works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Old Road
Location: at Old Road, East Cowes, Isle of Wight (Old Road)
25 November — 09 December
Diversion route
Name: Diversion
Location: at Old Road, East Cowes, Isle of Wight (Diversion)
25 November — 09 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Carriageway repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Lower Road
Location: at Lower Road, Brading, Isle of Wight (Lower Road)
25 November — 29 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Bollard replacement works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Burnt House Lane
Location: at Burnt House Lane, Newport, Isle of Wight (Burnt House Lane)
25 November — 29 November
Diversion route
Name: Diversion A
Location: at Burnt House Lane, Newport, Isle of Wight (Diversion A)
25 November — 29 November
Diversion route
Name: Diversion B
Location: at Burnt House Lane, Newport, Isle of Wight (Diversion B)
25 November — 29 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Gully repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Trafalgar Road
Location: at B3341 Trafalgar Road, Newport, Isle of Wight (Trafalgar Road)
25 November — 29 November
Diversion route
Name: Diversion
Location: at B3341 Trafalgar Road, Newport, Isle of Wight (Diversion)
25 November — 29 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Carriageway remedial works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Newport Shute
Location: at Newport Shute, Arreton, Isle of Wight (Newport Shute)
25 November — 29 November
Diversion route
Name: Diversion
Location: at Newport Shute, Arreton, Isle of Wight (Diversion)
25 November — 29 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Burnt House Lane, Newport, Isle Of Wight
25 November — 29 November
Delays likely Road closure
Works location: Newport: Adjacent To 1 Pan Cottages.: Burnt House Lane-Newport
Works description: Metal Hazard Marker Post Has Been Knocked And Requires Resetting Straight. 28 Day Perm Repair Required. Tm- Ds Advices Possible Road Closure. (H: Street Furnitre Faulty/Dmge) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Lower Road, Brading, Isle Of Wight
25 November — 29 November
Delays likely Road closure
Works location: Brading: O/S Adgesrone Camping Site: Lower Road-Brading
Works description: Idr – P/H’S X 3 3 X .30 X .30 X 30mm Tm – Stop & Go Boards (Cw: Pothole) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
New Barn Road, East Cowes, Isle Of Wight
25 November — 09 December
Delays likely Road closure
Works location: East Cowes: From Junction With Old Road, 289m Northeast, Ml 140285: New Barn Road-East Cowes
Works description: Carriageway Resurfacing Scheme (To Include Prep Works): Resurfacing Of The Carriageway. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) (Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Pre Works To Include Any Quartering And Siding Out East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
New Barn Road, East Cowes, Isle Of Wight
25 November — 09 December
Delays likely Road closure
Works location: East Cowes: From York Avenue To Top Of Old Road, 210m, Ml 140284: New Barn Road-East Cowes
Works description: Carriageway Resurfacing Scheme (To Include Any Prep Works): Resurfacing Of The Carriageway. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) (Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Pre Works To Include Any Quartering And Siding Out East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newport Shute, Arreton, Isle Of Wight
25 November — 29 November
Delays likely Road closure
Works location: Arreton: On The Left Side Of The C/Way Under The Tree Lined Area At The Beginning Of The Shute: Newport Shute-
Works description: Idr – P/H’S X 5 2.0 X .60 X 40mm .90 X .60 X 40mm .80 X .50 X 40mm .40 X .30 X 30mm .50 X .50 X 40mm Tm – Give & Take (Cw: Pothole) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Old Road, East Cowes, Isle Of Wight
25 November — 09 December
Delays likely Road closure
Works location: East Cowes: From Millfield Avenue To Hefford Road, 230m, Ml 140299: Old Road-East Cowes
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) (Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Pre Works To Include Any Quartering And Siding Out East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Old Road, East Cowes, Isle Of Wight
25 November — 09 December
Delays likely Road closure
Works location: East Cowes: From Osborne Heights 210m North, Ml 140297: Old Road-East Cowes
Works description: Carriageway Resurfacing Scheme: (To Include Prep Works) Resurfacing Of The Carriageway. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) (Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Pre Works To Include Any Quartering And Siding Out East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Old Road, East Cowes, Isle Of Wight
25 November — 09 December
Delays likely Road closure
Works location: East Cowes: From New Barn Road To Osborne Heights (Ml140296): Old Road-East Cowes:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (To Include Prep Works) (Br-Stren:R/H4, Barell Cambered Roads-F1-100mm Channel Strengthen, Shaping And 30mm Fibrovia Surface Course Overlay) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Old Road, East Cowes, Isle Of Wight
25 November — 09 December
Delays likely Road closure
Works location: East Cowes: From Oaks Close To Millfield Avenue, 200m, Ml 140298: Old Road-East Cowes
Works description: Carriageway Resurfacing Scheme (To Include Prep Works) : Resurfacing Of The Carriageway. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) (Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Pre Works To Include Any Quartering And Siding Out East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Old Road, East Cowes, Isle Of Wight
25 November — 09 December
Delays likely Road closure
Works location: East Cowes: From Hefford Road To Castle Street, 350m, Ml 140300: Old Road-East Cowes
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. (Br-Stren:R/H4 Barrel Cambered Road – F1 – 100m Channel Strengthen Shaping 30mm Fibrovia Surface Course Overlay (Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Pre Works To Include Any Quartering And Siding Out East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Trafalgar Road, Newport, Isle Of Wight
25 November — 29 November
Delays likely Road closure
Works location: Newport: Opposite New Road: Trafalgar Road-Newport – 14298
Works description: C/W Defect X 1 Rocking Gully Requires Replacing With New. 600mm Gully Required. Tm- Ds Advices Possible Road Closure. Out Of Hours Recommended. (Cw: Irnwk Not Exceed +Or- 20mm) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Hill, Totland, Isle Of Wight
24 November — 07 December
Delays possible Traffic control (two-way signals)
Works location: Totland: From Roundabout, Whole Length Of Road To York Road, 550m, Ml 630097: Church Hill-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit Partrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Forest Road, Newport, Isle Of Wight
24 November — 07 December
Delays possible Traffic control (two-way signals)
Works location: From O/S Recycling Plant To O/S Sydenhams
Works description: Excavation Of Joint Hole In Verge To Provide A New Electrical Connection To Forest Park Site. Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Advanced planning
Military Road, Freshwater, Isle Of Wight
24 November — 28 November
Delays possible Traffic control (two-way signals)
Works location: Freshwater: Area Close To Compton Beach, Ml 620069: Military Road-Freshwater
Works description: Verge Works Post Surfacing Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Mill Hill Road, Cowes, Isle Of Wight
25 November — 06 December
Delays possible Traffic control (two-way signals)
Works location: Cowes: From Junction With Newport Road To Victoria Road, 174m, Ml 140084: Mill Hill Road-Cowes
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Esplanade, Sandown, Isle Of Wight
25 November — 15 December
Delays unlikely Some carriageway incursion
Works location: On The Front Of Trouville Hotel
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
High Street, Yarmouth, Isle Of Wight
25 November — 01 December
Delays unlikely Some carriageway incursion
Works location: Outside Yarmouth Dentist, Marlborough House.
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
John Street, Ryde, Isle Of Wight
25 November — 29 November
Delays unlikely Some carriageway incursion
Works location: Ryde: In Road Outside No. 25 John Street, Ryde: John Street-Ryde
Works description: There Is A Small 30mm Wheel Push That Will Require Levelling With A Small Patch .60 X .50 X 50/100mm Tm – Ds Advices Possible Road Closure (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St Boniface Cliff Road, Shanklin, Isle Of Wight
25 November — 01 December
Delays unlikely Some carriageway incursion
Works location: No 2
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St Johns Wood Road, Ryde, Isle Of Wight
25 November — 01 December
Delays unlikely Some carriageway incursion
Works location: O/S 20
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Swanmore Road, Ryde, Isle Of Wight
24 November — 28 November
Delays unlikely Some carriageway incursion
Works location: (Pcp7) Opposite 77 Swanmore Road, Into Carriageway, Ryde, Po33 2te, Swanmore Road
Works description: Install 11m Of 1 Way Poly Duct In Carriageway,Install 3m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
Image: Craig Sunter under CC BY 2.0