Carriageway Reconstruction, planing and surfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Shore Road
Location: at Shore Road, Gurnard, Isle of Wight (Shore Road)
03 October — 07 October
Diversion route
Name: Diversion
Location: at Shore Road, Gurnard, Isle of Wight (Diversion)
03 October — 07 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Road closure In relation to Scaffold for Structural Improvements.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Beford Row Carisbrooke
Location: at Bedford Row, Newport, Isle of Wight (Beford Row Carisbrooke)
03 October — 09 October
Diversion route
Name: Beford Row Carisbrooke
Location: at Bedford Row, Newport, Isle of Wight (Beford Row Carisbrooke)
03 October — 09 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
Excavation/ investigation of the cause of consistent c/w depression, carry out repairs, backfill and reinstate the carriageway.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Green Street
Location: at Green Street, Ryde, Isle of Wight (Green Street)
04 October — 06 October
Diversion route
Name: Diversion Eastbound
Location: at Green Street, Ryde, Isle of Wight (Diversion Eastbound)
04 October — 06 October
Diversion route
Name: Diversion Westbound
Location: at Green Street, Ryde, Isle of Wight (Diversion Westbound)
04 October — 06 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
Installation of High Friction Surfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Smallbrook Lane
Location: at C61 Smallbrook Lane, Ryde, Isle of Wight (Smallbrook Lane)
03 October — 14 October
Diversion route
Name: Diversion
Location: at C61 Smallbrook Lane, Ryde, Isle of Wight (Diversion)
03 October — 14 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Carriageway repairs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Cross Street
Location: at West Street, Brading, Isle of Wight (Cross Street)
03 October — 05 October
Diversion route
Name: Diversion
Location: at West Street, Brading, Isle of Wight (Diversion)
03 October — 05 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Carraigeway Reapairs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Newlands
Location: at C35 Merstone Lane, Godshill, Isle of Wight (Newlands)
03 October — 05 October
Diversion route
Name: Diversion
Location: at C35 Merstone Lane, Godshill, Isle of Wight (Diversion)
03 October — 05 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Footpath repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Halberry Lane
Location: at Cycle Track From Newport To Wootton, Newport, Isle Of Wight (Halberry Lane)
03 October — 05 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

A3020 High Street, Godshill, Isle Of Wight
03 October — 05 October
Delays likely Traffic control (two-way signals)
Works location: Godshill: Ops Essex Cottage: High Street-Godshill
Works description: Please Carry Out Repairs To A Low Lying Wall That Surrounds A Footway Verge Tm: Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Arreton Road, Arreton, Isle Of Wight
03 October — 05 October
Delays likely Traffic control (multi-way signals)
Works location: Arreton: Just South Of J/O Downend Oad: Arreton Road-Arreton
Works description: Installation Of High Friction Surfacing Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
03 October — 07 October
Delays likely Road closure
Works location: Gurnard: Ml 310112 From Solent View Road To Shore Road: Worsley Road-Gurnard
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Gurnard
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Cross Street, Brading, Isle Of Wight
03 October — 05 October
Delays likely Road closure
Works location: Brading: Cross Street, Brading. Lillyput Toy Museum: Cross Street-Brading
Works description: Carriageway Repairs Reinstate Failed Edge Of Carriageway Strip At Customers Blocked Paved Vc 9mx0.5m Dbm Tm Ds Advices Possible Closure Req (Cw: Pothole) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Cycle Track From Newport To Wootton, Newport, Isle Of Wight
03 October — 05 October
Delays likely Road closure
Works location: Newport: Cycle Track Behind 140 Fairlee Road.: Cycle Track From Newport To Wootton-Newport
Works description: Idr- Cycle Track Requires Regrading And 8 Tonne Of Type 1 To Be Integrated To Dry Out The Wet Surface Followed By 4 Tonne Of Road Plainings. 40m Square. Tm- F/W Closure. (Fw: Fw/Cyclep Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Fairlee Link Road, Newport, Isle Of Wight
04 October — 06 October
Delays likely Lane closure
Works location: Newport: J/O Medina Way: Fairlee Link Road-Newport
Works description: Installation Of High Friction Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Green Street, Ryde, Isle Of Wight
04 October — 06 October
Delays likely Road closure
Works location: Ryde: Before The Multi Traffic Light Junction Near To No. 23: Green Street-Ryde
Works description: Please Excavate/ Investigat Cause Of Consitannt C/W Depression, Carrry Out Repairs Backfill And Reinstate Reinstate The Carriageway Tm Road Closure (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Medina Way, Newport, Isle Of Wight
04 October — 05 October
Delays likely Lane closure
Works location: Newport: Adj To The Advanced Directional Sign: Medina Way-Newport
Works description: Wjuk Idr – Lane Destination Markings Are Fading Out And/Or Missing And Require Repainting In Nat Speed Limit Area Sandown, East Cowes, Ryde In The Left Hand Lane Town Centre In The Right Hand Lane H1 Rural Tm: Road Closure Advised. No Work Beween 07.00 And 19.30 (H: Road Marking Non Accordance) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Medina Way, Newport, Isle Of Wight
04 October — 05 October
Delays likely Lane closure
Works location: Newport: On The Approach To St Mary’S Roundabout: Medina Way-Newport
Works description: Wjuk Idr – Lane Destination Markings Are Fading Out And/Or Missing And Require Repainting In The 40mph Area Yarmouth, Cowes In The Left Hand Lane, H1 Rural Tm: Lane Closure Advised. No Work Between 07.00 And 19.30 (H: Road Marking Non Accordance) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Medina Way, Newport, Isle Of Wight
04 October — 06 October
Delays likely Lane closure
Works location: Newport: Just Past Entrance To Fairlee Link Road: Medina Way-Newport
Works description: Installation Of High Friction Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Medina Way, Newport, Isle Of Wight
04 October — 06 October
Delays likely Lane closure
Works location: Newport: Between Medina Way And Entrance To Fairlee Link Road: Medina Way-Newport
Works description: Installation Of High Friction Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Medina Way, Newport, Isle Of Wight
04 October — 06 October
Delays likely Lane closure
Works location: Newport: Between Medina Way And Entrance To Fairlee Link Road: Medina Way-Newport
Works description: Installation Of High Friction Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Medina Way, Newport, Isle Of Wight
04 October — 06 October
Delays likely Lane closure
Works location: Newport: Approaching J/O Fairlee Link Road: Medina Way-Newport
Works description: Installation Of High Friction Surfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Merstone Lane, Godshill, Isle Of Wight
03 October — 05 October
Delays likely Road closure
Works location: Godshill: Between Thatchdown And Bury Lane On The Godshill Bound Side Of The C/Way: Merstone Lane-Godshill
Works description: Idr – P/H’S X 3 .60 X .40 X 20mm 1.8 X .50 X 40mm 1.9 X .70 X 40mm Tm – Stop & Go Boards (Cw: Pothole) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pan Lane, Newport, Isle Of Wight
03 October — 19 February 2017
Delays likely Road closure
Works location: Newport: : Pan Lane-Newport
Works description: Traffic Management Associated With Highway Improvements Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Shore Road, Gurnard, Isle Of Wight
03 October — 07 October
Delays likely Road closure
Works location: Gurnard: From Shore Ropad/Winding Way Heading North West To Dead End For Approximately 90m (130123): Shore Road-Gurnard:
Works description: Carriageway Reconstruction, Planing And Surfacing (Ff-Recon 160:U/H3, Reconstruction 25mm Ul-M 65psv And 135mm Foambase-Urban:H3) Gurnar
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
03 October — 14 October
Delays likely Road closure
Works location: Ryde: Approx 40m West Of The Bridge: Smallbrook Lane-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
03 October — 14 October
Delays likely Road closure
Works location: Ryde: Approx 150m East Of The Bridge: Smallbrook Lane-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
03 October — 14 October
Delays likely Road closure
Works location: Ryde: O/S Sharon Orchard: Smallbrook Lane-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
03 October — 14 October
Delays likely Road closure
Works location: Ryde: Approx 100m West Of The Bridge: Smallbrook Lane-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Smallbrook Lane, Ryde, Isle Of Wight
03 October — 14 October
Delays likely Road closure
Works location: Ryde: Approx 85m East Of Bridge: Smallbrook Lane-Ryde
Works description: Installation Of High Friction Surfacing Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ashey Road, Ryde, Isle Of Wight
03 October — 05 October
Delays possible Traffic control (two-way signals)
Works location: Outside Plum Tree Cottage, Ashey Road, Ryde, Po33 2xf
Works description: Replace Frame And Cover In The Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning

Blackwater Road, Newport, Isle Of Wight
03 October — 09 October
Delays possible Some carriageway incursion
Works location: 2 Brookside, Blackwater Road
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Carisbrooke Road, Newport, Isle Of Wight
03 October — 09 October
Delays possible Some carriageway incursion
Works location: O/S 63
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Downend Road, Newport, Isle Of Wight
04 October — 05 October
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: Robin Hill Roundabout To Hare And Hounds, Ml 410169: Downend Road-Newport
Works description: Hedge Cutting Prior To Surfacing Works Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Newport, Isle Of Wight
03 October — 30 October
Delays possible Some carriageway incursion
Works location: Old Apple Shop, High Street, Newport
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Shanklin, Isle Of Wight
03 October — 16 October
Delays possible Some carriageway incursion
Works location: O/S 24
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Whitwell, Isle Of Wight
04 October — 04 October
Delays possible Traffic control (two-way signals)
Works location: O/S The White Horse Inn High Street Whitwell Po38 2pz
Works description: Access Required To Underground Bt Structure To Repair Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning

Newport Road, Apse Heath, Isle Of Wight
03 October — 05 October
Delays possible Traffic control (multi-way signals)
Works location: Apse Heath: O/S Verbena Cottages / Apse View: Newport Road-Apse Heath
Works description: Installation Of High Friction Surfacing Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newport Road, Apse Heath, Isle Of Wight
03 October — 05 October
Delays possible Traffic control (multi-way signals)
Works location: Apse Heath: Opposite Collingwood / Haldon House: Newport Road-Apse Heath
Works description: Installation Of High Friction Surfacing Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newport Road, Apse Heath, Isle Of Wight
03 October — 05 October
Delays possible Traffic control (multi-way signals)
Works location: Apse Heath: Opposite Avalon / Highways: Newport Road-Apse Heath
Works description: Installation Of High Friction Surfacing Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newport Road, Godshill, Isle Of Wight
03 October — 14 October
Delays possible Traffic control (multi-way signals)
Works location: Godshill: J/O West Street And School Road: Newport Road-Godshill
Works description: Installation Of High Friction Surfacing Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

School Road, Godshill, Isle Of Wight
03 October — 14 October
Delays possible Traffic control (two-way signals)
Works location: Godshill: Approaching J/O Newport Road: School Road-Godshill
Works description: Installation Of High Friction Surfacing Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Johns Road, Wroxall, Isle Of Wight
03 October — 05 October
Delays possible Traffic control (two-way signals)
Works location: Cooks Castle Farm , St. Johns Rd, Wroxall, Ventnor
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

The Strand, Ryde, Isle Of Wight
03 October — 05 October
Delays possible Traffic control (two-way signals)
Works location: Outside 21 The Strand, Ryde, Po33 1jf
Works description: Replace Manhole Frame And Cover In The Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning

West Street, Godshill, Isle Of Wight
03 October — 14 October
Delays possible Traffic control (multi-way signals)
Works location: Godshill: Approaching J/O Newport Road: West Street-Godshill
Works description: Installation Of High Friction Surfacing Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bellevue Road, Cowes, Isle Of Wight
04 October — 06 October
Delays unlikely Some carriageway incursion
Works location: 162 Bellevue Road , Cowes, Isle Of Wight .
Works description: Renew Broke 4″ Valve
Responsibility for works: Southern Water
Current status: Advanced planning

Brooklands Road, Cowes, Isle Of Wight
04 October — 06 October
Delays unlikely Some carriageway incursion
Works location: 1 Brooklands Road, Cowes, Isle Of Wight .
Works description: Renew Broken 6″ Valve
Responsibility for works: Southern Water
Current status: Advanced planning

Cavendish Place, Newport, Isle Of Wight
03 October — 09 October
Delays unlikely Some carriageway incursion
Works location: Outside 11
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Ryde, Isle Of Wight
03 October — 09 October
Delays unlikely Some carriageway incursion
Works location: O/S 11 & 12 – Island Antiques And Ryde Barber Shop
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Redlake Road, Freshwater, Isle Of Wight
03 October — 14 October
Delays unlikely Traffic control (give & take)
Works location: Freshwater: Whole Length Of Road From Junction With Copse Lane, 120m, Ml 643380: Redlake Road-Freshwater
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St James Street, Newport, Isle Of Wight
03 October — 05 October
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction Of Medina Avenue North To Hunnycross Way. (Ml 220143): O/S Social Club Nrt
Works description: Replacement Of No 1 Sign (1 X No Right Turn Sign) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St James Street, Newport, Isle Of Wight
03 October — 05 October
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction Of Medina Avenue North To Hunnycross Way. (Ml 220143): O/S Samaritains Nrt
Works description: Replacement Of No 1 Sign (1 X No Right Turn Sign) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St James Street, Newport, Isle Of Wight
04 October — 06 October
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction Of Medina Avenue North To Hunnycross Way. (Ml 220144): O/S Olivia Court Nrt
Works description: Replacement Of No 1 Sign (1 X No Right Turn Sign) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Green, Cowes, Isle Of Wight
03 October — 05 October
Delays unlikely Traffic control (give & take)
Works location: Cowes: Whole Length Of Road From Mounbatten Drive (Ml 160350): The Green-Cowes:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Construction And Surfacing (Fwl Bit Full Recon Fwr Bit Part Recon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning