Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
It covers work carried out by BT, utility companies and Island roads.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Bunts Hill, Porchfield, Isle Of Wight
10 June — 01 July
Delays likely Road closure
Works location: Porchfield: From 500m Northeast Of New Road A Furthr 420m Northeast (Ml 630184): Bunts Hill-Porchfield
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:R/H3, Strengthen 25mm Ul-M 65 Psv And 135mm Foambase-Rural:H3) Porchfield
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Bunts Hill, Porchfield, Isle Of Wight
10 June — 01 July
Delays likely Road closure
Works location: Porchfield: From 920m Northeast Of New Road To Whitehouse Road (Ml 630185): Bunts Hill-Porchfield
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:R/H3, Strengthen 25mm Ul-M 65 Psv And 135mm Foambase-Rural:H3) Porchfield
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Main Road, Porchfield, Isle Of Wight
10 June — 01 July
Delays likely Road closure
Works location: Porchfield: From New Road 500m Northeast (Ml 630183): Main Road-Porchfield
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:R/H3, Strengthen 25mm Ul-M 65 Psv And 135mm Foambase-Rural:H3) Porchfield
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Camp Road, Freshwater, Isle Of Wight
09 June — 30 June
Delays likely Road closure
Works location: Freshwater: Ml 640216 From The Junction With Queens Road, Yarmouth To A Point 308 Meters North-East, To O/S Camp Cottage
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Regent Street, Shanklin, Isle Of Wight
09 June — 24 June
Delays likely Road closure
Works location: Shanklin: From High Street To Carter Street (Ml 420163): Regent Street-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Seal:U/H2, Resurface 30mm Ul-M 65 Psv With Armour Screed Crack Repair And Proscreed Cut And Seal Joints-Urbanh2) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Town Lane, Calbourne, Isle Of Wight
10 June — 14 June
Delays likely Road closure
Works location: Calbourne: Town Lane, Porchfield 50 Metres From The Junction With Corf Road. Map Attached.: Town Lane-Calbourne
Works description: Patch Required To Reinstate An Area Of Carriageway That Has Sunk By Approximately 140mm, Patch 15m X 2.8m. Tm= Ds Advices Possible Road Closure (Cw: Pothole) Calbourne
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Mersley Lane, Newchurch, Isle Of Wight
10 June — 14 June
Delays likely Road closure
Works location: Newchurch: Pot Hole Nearside Heading North: Mersley Lane-Newchurch
Works description: Pothole In Road – Deep. Nearside In Narrow Bends Around 200m Back From Garlic Farm Towards Newchurch (Enquiry 16078268) 6.1×0.3×70 (Cw: Pothole) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Green Lane, Shanklin, Isle Of Wight
09 June — 13 June
Delays possible Traffic control (two-way signals)
Works location: Shanklin: From Junction With Princes Way To Wheeler Way, 190m, Ml 430258: Green Lane-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Landguard Manor Road, Shanklin, Isle Of Wight
10 June — 21 June
Delays possible Traffic control (two-way signals)
Works location: Shanklin: From Green Lane To Witbank Gardens (Ml420270): Landguard Manor Road-Shanklin
Works description: Surfacing Preparatory Works. Raising Kerbs By 70mm. Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Recreation Ground Road, Newport, Isle Of Wight
10 June — 14 June
Delays possible Traffic control (two-way signals)
Works location: Newport: From The Corner O/S Victoria Recreation Ground Towards Carisbrooke Road: Recreation Ground Road-Newport
Works description: Idr – P/H’S X 7 Patch 1.0 X 1.0 X 50/100mm Patch 1.5 X 1.0 X 50/100mm Patch 1.5 X 1.0 X 50/100mm Patch 5.0 X 2.0 X 50/100mm Patch 1.0 X 1.0 X 50/100mm Patch 3.0 X 1.2 X 50/100mm Patch 2.0 X 1.0 X 50/100mm Tm – Ds Advices Possible Road Closure (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Whiteoak Lane, Porchfield, Isle Of Wight
10 June — 14 June
Delays unlikely Some carriageway incursion
Works location: Porchfield: White Oak Lane Porchfield 180m To 220m East Of The Entrance To London Farm, Map Attached.: Whiteoak Lane-Por
Works description: Six Pot Holes On Dbm Carriageway, 1:- 760mm X 230mm X 55mm Deep, 2:- 940mm X 220mm X 45mm Deep, 3:- 180mm X 110mm X 50mm Deep, 4:- 1.1m X 440mm X 45mm Deep, 5:- 4m X 550mm X 42mm Deep, 6:- 1.6m X 230mm X 40mm Deep, Tm= Mobile Works, Please Contact Derek On 07714596348 If Clarification Is Needed On The Location Or Job, (Cw: Pothole) Porchfield
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Cherrytree Road, Nettlestone, Isle Of Wight
09 June — 13 June
Delays unlikely Traffic control (give & take)
Works location: Nettlestone: Ml 342456 Between Orchard Road And Caws Avenue: Cherrytree Road-Nettlestone
Works description: Surfacing Preparatory Works. Concrete Patch Repairs Prior To Eurovia Specialist Treatment Resurfacing Works. Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Daish Way, Newport, Isle Of Wight
09 June — 13 June
Delays unlikely Some carriageway incursion
Works location: In Footway Outside Mcm Construction
Works description: Excavate And Install Duct To Chamber
Responsibility for works: Isle of Wight Cable And Telephone Co Ltd
Current status: Advanced planning
Hawthorn Close, Binstead, Isle Of Wight
09 June — 22 June
Delays unlikely Some carriageway incursion
Works location: O/S 8 -10
Works description: Excavate In Carriageway For New Electric Supply. Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Advanced planning
Marlborough Road, Newport, Isle Of Wight
09 June — 20 June
Delays unlikely Some carriageway incursion
Works location: Os 16
Works description: Relay Service From Farside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning
Moor Lane, Brighstone, Isle Of Wight
10 June — 14 June
Delays unlikely Traffic control (give & take)
Works location: Brighstone: Ml 640407 Moor Lane. From Main Road To Brookedge: Moor Lane-Brighstone
Works description: Surfacing Preparatory Works. Concrete Patch Repairs Prior To Eurovia Specialist Treatment Resurfacing Works. Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Sandcroft Avenue, Ryde, Isle Of Wight
09 June — 17 June
Delays unlikely No carriageway incursion
Works location: Os 72
Works description: Relay Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning
Shore Road Path, Ventnor, Isle Of Wight
09 June — 17 June
Delays unlikely Traffic control (give & take)
Works location: Ventnor: Footway Link From Bonchurch Village Road To Shore Road, Ml 50722: Shore Road Path-Ventnor
Works description: Footway Reconstruction And Surfacing (Fwl Bit : Partrecon) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Worsley Road, Godshill, Isle Of Wight
09 June — 20 June
Delays unlikely Traffic control (give & take)
Works location: Godshill: Whole Length Of Road From Junction With Newport Road, 310m, Ml 540198: Worsley Road-Godshill
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning