Road Closed

Isle of Wight roadworks and road closures 27th April

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

West Street will be closed from 0930hrs Wednesday 27 April until 1630hrs Friday 29 April for the installation of a new gas connection by Southern Gas Networks. The closure is from Fairy Road to High Street. For further details contact SGN on 0800 912 1700
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Fairlee Road, Newport, Isle Of Wight
27 April — 29 April
Delays likely Lane closure
Works location: Newport: From Fairlee Link Road 410m North (Ml210048): Fairlee Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Ryde: From Dover Street For The Entire Length Of The Roundabout (Ml 310061): Esplanade-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65psv Plus Regulating-Urban:H/1(Kerbed=Inlay/Unkerbed=Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Arreton Road, Arreton, Isle Of Wight
27 April — 29 April
Delays likely Traffic control (two-way signals)
Works location: Arreton: From Junction Of Heasley Lane, South To Crossing (Ml 410064):
Works description: Slot Cutting For The New Traffic Signals Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 Castle Hill, Newport, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Newport: Ml 240085 Betwen The Junctions Of Castle Lane And Cedar Hill: Castle Hill-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399 Town Lane, Chale, Isle Of Wight
27 April — 05 May
Delays likely Road closure
Works location: Chale: From Chale Lane To Appleford Road (530083): Town Lane-Chale
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthne 25mm Ul-M 65psv And 85mm Foam Base-Rural:H3) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Collingwood Road, Shanklin, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Shanklin: From Landguard Road To Northbourne Avenue (Ml440242): Collingwood Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon20%:U/H4 20% Concrete Reconstruction And Seal Joints-Urban:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Collingwood Road, Shanklin, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Shanklin: From Northbourne Avenue 210 M West (Ml 440243): Collingwood Road-Shanklin:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

West Street, Seaview, Isle Of Wight
27 April — 02 May
Delays likely Road closure
Works location: Os Albert Cottage
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

A3055 Military Road, Brighstone, Isle Of Wight
27 April — 29 April
Delays possible Traffic control (two-way signals)
Works location: Brighstone: Military Road-Brighstone, On Centre Of Carriageway At The Junction With Grange Road.: Military Road-Brighsto
Works description: Defect On The Randonnee Route, Idr , Two Pot Holes In Concrete Carriageway, 1:- 360mm X 190mm X 44mm Deep, 2:- 400mm X 150mm X 50mm Deep, Tm = Mobile Works, (Cw: Pothole) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
27 April — 29 April
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Rowbridge Lane To Alvington Road (Ml 220092-5): Calbourne Road-Newport
Works description: Road Core Excavations Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
28 April — 28 April
Delays possible Traffic control (two-way signals)
Works location: Opposite Little Shilllings, Calbourne Road, Newport Isle Of Wight Po30 4pt
Works description: Access Required To Underground Bt Structure To Provide Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
27 April — 29 April
Delays possible Traffic control (two-way signals)
Works location: Newchurch: From Skinners Lane To Forestroad (Ml 430135): Alverstone Road-Newchurch
Works description: Surfacing Post Works To Accomodate Increase In Carriageway Height Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Colwell Road, Freshwater, Isle Of Wight
27 April — 04 May
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Colwell Lane To Junction With The Avenue, 230m, Ml 620002: Colwell Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Tennyson Road, Yarmouth, Isle Of Wight
27 April — 29 April
Delays unlikely Some carriageway incursion
Works location: Bay Tree House, Tennyson Rd
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Ashlake Copse Road, Wootton, Isle Of Wight
28 April — 10 May
Delays unlikely Some carriageway incursion
Works location: Os Orchard Lodge
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

B3320 Bridge Road, Cowes, Isle Of Wight
27 April — 29 April
Delays unlikely Some carriageway incursion
Works location: 2 Bridge Rd Cowes
Works description: – Replace Cover And Frame In Footway
Responsibility for works: Southern Water
Current status: Advanced planning

B3401 Shide Road, Newport, Isle Of Wight
28 April — 12 May
Delays unlikely Traffic control (give & take)
Works location: Newport: From The Junction With Medina Avenue, West To Junction With Watergate Road (Ml 230106, Ml 230105 & Ml 230104):
Works description: Replacement Of N’ 5 Signs (2 X Give Way, 2 X Bend Ahead & 1 X Roundabout) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Heathfield Road, Freshwater, Isle Of Wight
28 April — 04 May
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Heathfields Close To The Shielings, 230m, Ml 630213: Heathfield Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Park Road, Ryde, Isle Of Wight
28 April — 11 May
Delays unlikely Some carriageway incursion
Works location: O/S 55
Works description: Skip App. 55 Park Road – 28/04 – 11/05
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Castle Street, Carisbrooke, Isle Of Wight
27 April — 29 April
Delays unlikely Some carriageway incursion
Works location: 15 Castle Street, Newport, Isle Of Wight.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning

Cliff Road, Totland, Isle Of Wight
27 April — 28 April
Delays unlikely No carriageway incursion
Works location: In Tarmac Outside Greywood Crossing Carriageway To Outside Hatherwood , Cliff Road
Works description: Remedial Reinstatement To Rectify The Tarmac In The Fw As Sunk And Causing Trip Hazards. To Replace Two Kerbs
Responsibility for works: BT
Current status: Advanced planning

Spring Walk, Newport, Isle Of Wight
27 April — 04 May
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road From Junction With Gunville Road, 220m, Ml 240248: Spring Walk-Newport
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Pauls Crescent, Shanklin, Isle Of Wight
28 April — 02 May
Delays unlikely Some carriageway incursion
Works location: 19 St. Pauls Crescent. Shanklin, Isle Of Wight.
Works description: Remidial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

The Square, Freshwater, Isle Of Wight
28 April — 06 May
Delays unlikely Some carriageway incursion
Works location: Os Rockstone
Works description: Relay Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Uplands Road, Northwood, Isle Of Wight
28 April — 05 May
Delays unlikely Traffic control (give & take)
Works location: Northwood: From Junction With Fieldway Crescent 280m South, Ml 140174: Uplands Road-Northwood
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Warwick Street, Ryde, Isle Of Wight
27 April — 06 May
Delays unlikely Some carriageway incursion
Works location: Outside No 31
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

West Street, Ventnor, Isle Of Wight
27 April — 11 May
Delays unlikely Traffic control (give & take)
Works location: From Adj 2 To O/S 25
Works description: Excavation Of Cable Trench In Footway For New Electrical Connection To New Property. Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Advanced planning

Image: Zahlm under CC BY 2.0