Road closed sign:

Roadworks and road closures: 16th June 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Fairlee Road, Newport, Isle of Wight
17 June — 17 June
Delays likely due to Streetworks
Lane closure at A3054 Fairlee Road, Newport, Isle of Wight (A3054 Fairlee Road, Newport) 17 June — 17 June
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
A3020 Blackwater Road, Newport, Isle Of Wight
16 June — 18 June Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – P/H’S X 3 .40 X .35 X 50mm On Giveway Markings Nearside Tyreline .30 X .20 X 55mm In Middle Of W/B C/Way Patch Required – 4.20 X 1.0 X 100/150mm W/B C/Way Just Before Rookley Jnc Tm – Stop & Go Boards Newport at Newport: On Giveway Lines At Jnc With Blackwater Hollow As You Turn Onto The Newport Bound C/Way And On The Newport Boun
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 Well Road, East Cowes, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays likely due to Streetworks
Install No 1 Lantern (No 1 Column) 1 Parking Restriction Sign & 1 Warning Sign East Cowes at East Cowes: From Castle Street, East To Column 10 (Ml 130025):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 York Avenue, East Cowes, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays likely due to Streetworks
Install No 5 Lanterns (No 5 Columns) 4 Warning Signs & 2 Parking Restriction Signs East Cowes at East Cowes: From Junction Of Well Road, North West To Column 51 (Ml 110024):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
17 June — 19 June Traffic control (two-way signals)
Delays likely due to Streetworks
Idr. Ruts And Ridge Across A Failing Macadam Vehicle Crossing. 6m X 2.1m Also One Pcc Transition Kerb Needs Replacing. Tm= Two Way Lights ,Barriers And Walk Way Required For Pedestians , Is Near A School So Avoid School Run Times. (Fw: Fw/Cyclep Ridge) Shalfleet at Shalfleet: Main Road, Ningwood, Footway/Vehicle Crossing To Pitts Farm.: Main Road-Shalfleet
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
17 June — 19 June Traffic control (two-way signals)
Delays likely due to Streetworks
Provide 2-Way Traffic Lights For Structures Scour Assessments. Shalfleet at Shalfleet: Brookwood Barn Bridge:
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Cockleton Lane, Gurnard, Isle Of Wight
16 June — 16 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Gurnar at Gurnard: From Hilton Road To Bay View Road (Ml130071) : Cockleton Lane-Gurnard:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Marsh Road, Gurnard, Isle Of Wight
17 June — 17 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Gurnar at Gurnard: From Rew Street To Lower Church Road (Ml130069) : Marsh Road-Gurnard:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Godshill Road, Whitwell, Isle Of Wight
17 June — 17 June Road closure
Delays likely due to Streetworks
Access Required To Overhead Bt Structure To Provide Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant at Godshill Road From Southford Lane To Sheepwash Lane Whitwell Isle Of Wight Po38 2ag
Responsibility: BT
EToN status: Advanced planning

Station Road, Wootton, Isle Of Wight
16 June — 16 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton at Wootton: From Glendale Close 370m Northeast (Ml 320173): Station Road-Wootton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Station Road, Wootton, Isle Of Wight
16 June — 16 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton at Wootton: From Park View 210m Southwest (Ml320171): Station Road-Wootton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Station Road, Wootton, Isle Of Wight
16 June — 16 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2) Wootton at Wootton: From High Street 210m South (Ml 320174): Station Road-Wootton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Station Road, Wootton, Isle Of Wight
16 June — 16 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton at Wootton: From Park View To Glendale Close (Ml 320172): Station Road-Wootton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Binstead Hill, Binstead, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays possible due to Streetworks
– Reinstate Stop Tap Box at Maher Ross,Binstead Road,Ryde,Iow
Responsibility: Southern Water
EToN status: Advanced planning

A3054 Kite Hill, Wootton, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays possible due to Streetworks
– Interim To Perm Reinstatement at Woodlands, Kite Hill, Wootton Bridge, Ryde
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Leeson Road, Ventnor, Isle Of Wight
16 June — 18 June Traffic control (two-way signals)
Delays possible due to Streetworks
Please Rebed M/H Cover And Reinstate Sunken Surround 800 X 800 Mm. And 60 Mm Deep. Tm 2 Way Lights. Sent Back To Ir By Sws Ventnor at Ventnor: C/W. Rocking Cover With Broken Surround. On Centre Line.: Leeson Road-Ventnor
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
17 June — 25 June Some carriageway incursion
Delays possible due to Streetworks
Lay New Service From Nearside Footway To Site at Os 131
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

A3055 Military Road, Atherfield, Shorwell, Isle Of Wight
17 June — 19 June Traffic control (two-way signals)
Delays possible due to Streetworks
Idr – Overlay The Edge Of The C/Way Which Has Rutted Leaving An 11 Metre Length Of Surfacing That Drops Away By 70mm Patch Size Approx 11.0 X 1.5 X 100/150mm Tm – Two Way Temp Lights On Nat Speed Limit Road (Cw: Pothole) Shorwell at Shorwell: On The W/B C/Way Past Atherfield Holiday Camp Entrance Appx 400m: Military Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays possible due to Streetworks
– Interim To Perm Reinstatement at E E Downer Family Butchers 1, St. James St, Newport
Responsibility: Southern Water
EToN status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
17 June — 19 June Traffic control (two-way signals)
Delays possible due to Streetworks
Disconnection Of Water Supply. at Bembridge Sailing Club, Embankment Road,Bembridge,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
17 June — 19 June Traffic control (two-way signals)
Delays possible due to Streetworks
Provide 2-Way Traffic Lights For Structures Scour Assessments. Shalfleet at Shalfleet: Calbourne Mill, Middle Road. :
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Newport Road, Niton, Isle Of Wight
16 June — 18 June Traffic control (two-way signals)
Delays possible due to Streetworks
Provide 2-Way Traffic Lights For Structures Scour Assessments. Niton at Niton: Calbourne Mill, Middle Road. :
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Chatfeild Road, Niton, Isle Of Wight
16 June — 18 June Traffic control (two-way signals)
Delays possible due to Streetworks
Provide 2-Way Traffic Lights For Structures Scour Assessments. Niton at Niton: Calbourne Mill, Middle Road. :
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Victoria Road, Cowes, Isle Of Wight
16 June — 18 June Traffic control (two-way signals)
Delays possible due to Streetworks
– Relay Comm Pipe at 92 Victoria Road , Cowes, Isle Of Wight .
Responsibility: Southern Water
EToN status: Advanced planning

A3021 Castle Street, East Cowes, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 8 Lanterns (No 3 Columns) 2 Warning Signs & 1 Lit Warning Sign East Cowes at East Cowes: From Ferry Road, North East To Column 18 (Ml110026 & Ml 140080):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 Ferry Road, East Cowes, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 3 Lanterns (No 3 Columns) 1 Route/Direction Sign, 3 Warning Signs & 1 Cctv Sign East Cowes at East Cowes: From York Avenue, South West To Castle Street (Ml 110024 & Ml 110026):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
16 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Island Scaffold) at O/S 31
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3395 Culver Parade, Sandown, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 5 Lanterns (No 5 Columns) Sandown at Sandown: From Culver Parade, North To Column 16 (Ml 430100 & Ml 430101):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3395 High Street, Bembridge, Isle Of Wight
16 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Upright Scaffold) at O/S 48
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Queens Road, Freshwater, Isle Of Wight
17 June — 18 June No carriageway incursion
Delays unlikely due to Streetworks
Permanent Reinstatement Following: Install 5m Of 2 Poly Ducts In Carriageway,Install 6m Of 1 Way Poly Duct In Footway. at (Pcp9) Rear Of 1 To 14 Brookelands Crossing Carriage Way To Side Of Bank School Green Road On, Quee
Responsibility: BT
EToN status: Advanced planning

Merstone Lane, Godshill, Isle Of Wight
16 June — 22 June Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (1st Choice Scaffold) at O/S The Smithy
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Sea Street, Newport, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 1 Lantern (No 1 Column) 1 Parking Restriction Sign Newport at Newport: From High Street, North To Column 3 (Ml 240284):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Church Road, Binstead, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Connection at Kingarth Lodge ,Church Road , Binstead, Iow.
Responsibility: Southern Water
EToN status: Advanced planning

Cliff Way, Lake, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 12, Cliff Way, Sandown
Responsibility: Southern Water
EToN status: Advanced planning

Duver Road, Seaview, Isle Of Wight
17 June — 30 June No carriageway incursion
Delays unlikely due to Streetworks
Install 10m Of 2 Poly Ducts In Verge,Install 6m Of 2 Poly Ducts In Carriageway,Install 6m Of 2 Poly Ducts In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at Outside Merries A/C C/W To Sea Wall, Through The Sea Wall To The Beach, Duver Road
Responsibility: BT
EToN status: Advanced planning

Maresfield Road, East Cowes, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 5 Lanterns (No 1 Column) 3 Warning Sign East Cowes at East Cowes: From Cambridge Road, South To Columnbine Road (Ml 140306):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Newcomen Road, Lake, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 9, Newcomen Rd, Sandown
Responsibility: Southern Water
EToN status: Advanced planning

Orchard Street, Newport, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 1 Lantern (No 1 Column) Newport at Newport: From South Street, South To Column 6 (Ml 240231):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Paddock Close, Shorwell, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
Renew F/H Frame & Cover at 12 Paddock Cl Shorwell Newport Isle Of
Responsibility: Southern Water
EToN status: Advanced planning

Peacock Hill, Bembridge, Isle Of Wight
17 June — 01 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 1 Lantern (No 1 Pole Bracket) Bembridge at Bembridge: From Sandown Road, East To Junction Of Peacock Hill (Ml 340160):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Roseway, Lake, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 36, Roseway, Sandown
Responsibility: Southern Water
EToN status: Advanced planning

St Andrews Street, Cowes, Isle Of Wight
16 June — 29 June No carriageway incursion
Delays unlikely due to Streetworks
Excavate In Footway For Resite Of Electric Service Backfill And Reinstate at O/S 23 – 35
Responsibility: Southern Electric
EToN status: Advanced planning

Trinity Street, Ryde, Isle Of Wight
16 June — 23 June Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 43736 at Os 7
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

Wood Street, Ryde, Isle Of Wight
17 June — 25 June Some carriageway incursion
Delays unlikely due to Streetworks
Alteration Of Gas Supply From Nearside Footway To Site at Outside Number 14
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

Worsley Road, Newport, Isle Of Wight
16 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatment at 11, Worsley Rrd, Newport
Responsibility: Southern Water
EToN status: Advanced planning

Image: functoruser under CC BY 2.0