Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
01 July — 03 July Traffic control (priority working)
Delays likely due to Streetworks
Remedial Work To Remedy Defects. Original Work: Install 52 Of 1 Way Power Duct In Verge,Performing An 1excavation To Expose Existing Power Cable In Footway. at Opposite Private Road (Shalfleet Footpath 43) To Opposite Bouldnor Lodge On, Bouldnor Road
Responsibility: BT
EToN status: Advanced planning
A3054 Fairlee Road, Newport, Isle Of Wight
01 July — 02 July Traffic control (two-way signals)
Delays likely due to Streetworks
28 Day Permr, Please Rebed C/W M/H Cover Due To Surround Being Sunk Tm 2 Way T/L Newport at Newport: S/B O/S 208: Fairlee Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Kite Hill, Wootton, Isle Of Wight
01 July — 03 July Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Empty & Flush 3 X Gullies. Tm=Stop/Go (Gl: Non Functioning Gully) Wootton at Wootton: Firestone Copse Rd Jct Kite Hill, To Bridge At Mill Square: Kite Hill-Wootton – 845
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3020 Blackwater Hollow, Newport, Isle Of Wight
01 July — 03 July Traffic control (two-way signals)
Delays possible due to Streetworks
Install New Posts And Fix Sign To Posts, 2 Way Ttl (Sg: Sign Mis-Aligned) Newport at Newport: Opp Reynolds N Reed, Blackwater Hollow: Blackwater Hollow-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Binstead Hill, Binstead, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays possible due to Streetworks
Ryde (Pcp 21) Remedial Works To Rectify Ha Defect, All Works In Carriageway at S/O Glenfield Binstead Hill From C/W 3 To The Kerb
Responsibility: BT
EToN status: Advanced planning
B3323 St James Street, Newport, Isle Of Wight
02 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Gsmr/Hse Cut Off – So43732 at Os 54
Responsibility: SGN
EToN status: Advanced planning
B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
01 July — 03 July Traffic control (two-way signals)
Delays possible due to Streetworks
Break Out The Existing Gully Concrete Surround And Excavate The Existing Grass Verge, Then Install A Splayed Side Entry Gully With Splayed Precast Concrete Kerbs. Tm 2 Way Lights Shalfleet at Shalfleet: : Freshwater Road-Shalfleet – 12112
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Rolls Hill, Porchfield, Isle Of Wight
01 July — 03 July Traffic control (two-way signals)
Delays possible due to Streetworks
Please Dig Up And Relay Six Pcc Dropped Kerbs And Relay To Give A 35mm Upstand, At The Lower End Of The Kerbs Add A New Transition Pcc Kerb And At The Higher End Add A New Pcc Kerb To Give A Total Of Eight Metres Of Kerb.( 1 Transition And 7 Dropped Kerbs. Tm= Two Way Lights . Please Contact Derek On 07714596348 If Clarification Is Needed On The Location, Or Job. (Kerb: Knocked Out/Replace/Miss) Porchfield at Porchfield: Rolls Hill Road, Porchfield ,O/S A Property Called Hitherwood (Stables): Rolls Hill-Porchfield
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Union Street, Ryde, Isle Of Wight
02 July — 09 July Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Upright Scaffold Services) at O/S 11
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 George Street, Ryde, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 1 Lantern (No 1 Column) Ryde at Ryde: From Centre Of George Street, East To Dead End (Ml 310030):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Park Avenue, Ventnor, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure. at Eversley Hotel
Responsibility: Southern Water
EToN status: Advanced planning
Aldermore Close, Ryde, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 3 Lanterns (No 0 Columns) Ryde at Ryde: From Woodland View, East To Dead Ends (Ml 341453):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3327 Mitchell Avenue, Ventnor, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Fullrecon) Ventnor at Ventnor: From Old Station Road To Macrocarpa Road (Ml 520067): Mitchell Avenue-Ventnor
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3395 Foreland Road, Bembridge, Isle Of Wight
01 July — 02 July No carriageway incursion
Delays unlikely due to Streetworks
Reinstatement To Be Carried Out On Interim Site In Footway at (Pcp2) Outside 83, Foreland Road
Responsibility: BT
EToN status: Advanced planning
Barry Way, Newport, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 2 Lanterns (No 0 Columns) Newport at Newport: From Daish Way, North To Second Column (Ml 241357):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Broadway Crescent, Binstead, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 98, Broadway Crescent,Ryde
Responsibility: Southern Water
EToN status: Advanced planning
Swanmore Road, Ryde, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatemenrt at 56, Swanmore Road, Ryde, Iow
Responsibility: Southern Water
EToN status: Advanced planning
Baring Road, Cowes, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure. at 90
Responsibility: Southern Water
EToN status: Advanced planning
Castle Court, Ventnor, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure at 34
Responsibility: Southern Water
EToN status: Advanced planning
Egerton Road, Bembridge, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 26 Egerton Road, Bembridge, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Esplanade, Shanklin, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 2 Lanterns (No 2 Wall Brackets) Shanklin at Shanklin: From Esplanade, South To Dead End (Ml 440207):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Ferncliff Path, Sandown, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 1 Lantern (No 0 Columns) Sandown at Sandown: From Grange Road, South To First Column (Ml 410045):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Glamis Gardens, East Cowes, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No. 3 Lanterns (No. 0 Columns) East Cowes at East Cowes: From Connaught Road, East, Then South To Dead End (Ml 140254):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Hambrough Road, Ventnor, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure at Ventnor House
Responsibility: Southern Water
EToN status: Advanced planning
Hazlemere Avenue, Binstead, Isle Of Wight
02 July — 06 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit 50% Partrecon Fwr: Bit 50% Partrecon) Binstead at Binstead: Whole Length Of Footway From Parkway (Ml 361635): Hazlemere Avenue-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Highfield Road, Shanklin, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No. 2 Lanterns (No. 0 Columns) Shanklin at Shanklin: From Victoria Avenue, South To Columns 8 & 9. (Ml 440261):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
King George V Close, Ryde, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 4 Lanterns (No 0 Columns) Ryde at Ryde: From Adelaide Place, West, Then South To Dead End (Ml 341441):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Marina Avenue, Ryde, Isle Of Wight
02 July — 06 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr :Bit Partrecon) Ryde at Ryde: From Appley Road 200 Mtrs North (Ml 340498): Marina Avenue-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Oaklyn Gardens, Shanklin, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 25 Oaklyn Gardens , Shanklin, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Old Park Road, Ventnor, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Iterim To Perm Reinstatement at Dovecot, Old Park Road,Ventnor,Iow.
Responsibility: Southern Water
EToN status: Advanced planning
Station Road, Brading, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
Sandown (Pcp 16) Remedial Works To Rectify Ha Defect In Footway at Junc New Road On Station Road, Brading
Responsibility: BT
EToN status: Advanced planning
The Nurseries, Freshwater, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No. 3 Lanterns (No. 0 Columns) Freshwater at Freshwater: From High Street, East To Dead End (Ml 630211):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Watchbell Lane, Newport, Isle Of Wight
01 July — 03 July Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 1 Lantern (No 1 Wall Bracket) Newport at Newport: From High Street, North To Single Wall Bracket (Ml 240229):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Watergate Road, Newport, Isle Of Wight
02 July — 15 July Some carriageway incursion
Delays unlikely due to Streetworks
Excavate In Carriageway And Footway For New Electric Service at Junc Watergate Road And St George’S School Entrance
Responsibility: Southern Electric
EToN status: Advanced planning
Wilkes Road, Sandown, Isle Of Wight
01 July — 09 July Some carriageway incursion
Delays unlikely due to Streetworks
Lay New Service From Mid Carriageway To Site at Os 3
Responsibility: SGN
EToN status: Advanced planning
Woodside Avenue, Newchurch, Isle Of Wight
02 July — 06 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Newchurch at Newchurch: Main Section Of Footway From Ypungwoods Way (Ml 440445): Woodside Avenue-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning