East Cowes Esplanade Landslip by Allan Marsh

Roadworks and road closures: 22nd April

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Roadworks

A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
23 April — 23 July
Delays likely Road closure
Works location: East Cowes: The Entire Lay-By Opposite Campfield Road (Ml160356): Whippingham Road-East Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Broadway, Sandown, Isle Of Wight
23 April — 27 April
Delays likely Traffic control (two-way signals)
Works location: Sandown: From Queens Road To Avenue Road (Ml 410050): Broadway-Sandown
Works description: Surfacing Preparatory Works Replacing And Relaying Kerbs Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 Pyle Street, Newport, Isle Of Wight
22 April — 29 April
Delays likely Traffic control (give & take)
Works location: Os 137
Works description: Gsmr/Hse Cut Off – So39993
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Newport Road, Niton, Isle Of Wight
23 April — 13 June
Delays likely Road closure
Works location: Niton: From 40 Metres North Of Kingates Lane To 170 Metres South Of Kingates Lane (Ml530095 : Newport Road-Niton:; St
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Niton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newport Road, Niton, Isle Of Wight
23 April — 13 June
Delays likely Road closure
Works location: Niton: From 40 Metres North Of Kingates Lane To 290 Metres North Of Kingates Lane (Ml530096) : Newport Road-Niton:; S
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Niton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newport Road, Niton, Isle Of Wight
23 April — 13 June
Delays likely Road closure
Works location: Niton: From 290 Metres North Of Kingates Lane To 600 Metres North Of Kingates Lane (Ml530097) : Newport Road-Niton:;
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Niton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newport Road, Niton, Isle Of Wight
23 April — 13 June
Delays likely Road closure
Works location: Niton: From 170. South Of Kingates Lane A Further 340m South (Ml 530094): Newport Road-Niton:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Niton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Blacklands Lane, Newport, Isle Of Wight
23 April — 23 July
Delays likely Road closure
Works location: Newport: From Briddlesford Road 550m West (Ml330176): Blacklands Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mill Street, Newport, Isle Of Wight
22 April — 24 April
Delays likely Road closure
Works location: 13 Mill Street, Newport, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Hillway Road, Bembridge, Isle Of Wight
23 April — 27 April
Delays possible Traffic control (two-way signals)
Works location: Whitecliff Lodge, Hillway Road, Bembridge,Iow.
Works description: – New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning

B3399 Church Place, Chale, Isle Of Wight
23 April — 27 April
Delays unlikely Some carriageway incursion
Works location: Church Place Chale Green
Works description: Provide 2 Poles To Provide Service To Customer
Responsibility for works: BT
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
23 April — 01 May
Delays unlikely Traffic control (give & take)
Works location: Os 1 The Bower
Works description: Relay Service From Mid Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Station Road, Wootton, Isle Of Wight
23 April — 27 April
Delays unlikely Some carriageway incursion
Works location: O/S 44
Works description: Minor Excavation To Repair Crushed Duct
Responsibility for works: Isle of Wight Cable And Telephone Co Ltd
Current status: Advanced planning

Chestnut Close, Ventnor, Isle Of Wight
22 April — 05 May
Delays unlikely Traffic control (give & take)
Works location: Ventnor: From Newport Road, North West, Then West To Dead End (Ml 541247):
Works description: Install N? 5 Lanterns (N? 5 Columns) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hinton Road, Newport, Isle Of Wight
22 April — 30 April
Delays unlikely Some carriageway incursion
Works location: Adj 2 Marlborough Road
Works description: Relay Service From Nearside Footway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Lane End Close, Bembridge, Isle Of Wight
23 April — 01 May
Delays unlikely Traffic control (give & take)
Works location: Adj Magnolia House
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

School Lane, Newport, Isle Of Wight
22 April — 30 April
Delays unlikely Traffic control (give & take)
Works location: Os Medina Centre
Works description: Disconnect Services In Carriageway
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Seagrove Manor Road, Seaview, Isle Of Wight
23 April — 01 May
Delays unlikely Traffic control (give & take)
Works location: Os Sea Whispers
Works description: Disconnect Service In Carriageway
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

St Thomas Square, Newport, Isle Of Wight
22 April — 05 May
Delays unlikely Some carriageway incursion
Works location: O/S 11a
Works description: Scaffold (Lowes Scaffold)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Stenbury View, Wroxall, Isle Of Wight
23 April — 06 May
Delays unlikely Traffic control (give & take)
Works location: Wroxall: From Manor Road, South To Dead Ends (Ml 540238 & Ml 540305):
Works description: Install N? 12 Lanterns (N? 12 Columns) Wroxall
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Square, Freshwater, Isle Of Wight
23 April — 01 May
Delays unlikely Traffic control (give & take)
Works location: Os Little Oak
Works description: Relay Service From Farside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Willow Close, Ventnor, Isle Of Wight
22 April — 05 May
Delays unlikely Some carriageway incursion
Works location: Ventnor: From St Margarets Glade, North To Dead End (Ml 540247):
Works description: Install N? 3 Lanterns (N? 3 Columns) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: © With kind permission of Allan Marsh