Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Smallbrook Lane, Ryde, Isle Of Wight
24 June — 11 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H2) Ryde at Ryde: From 440m Northeast Of Ashey Road A Further 510m Northeast (Ml320232): Smallbrook Lane-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Smallbrook Lane, Ryde, Isle Of Wight
24 June — 11 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Ryde at Ryde: From Great Preston Road 364m West (Ml 320233): Smallbrook Lane-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
The Grove, Ventnor, Isle Of Wight
23 June — 23 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:U/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H4) Ventno at Ventnor: From Alpine Road 70m North (Ml542175): The Grove-Ventnor:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
The Grove, Ventnor, Isle Of Wight
23 June — 23 August Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Ventno at Ventnor: From Alpine Road To End Of Public Highway (Ml542175) : The Grove-Ventnor:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3021 Well Road, East Cowes, Isle Of Wight
24 June — 26 June Some carriageway incursion
Delays possible due to Streetworks
– Core Sample Reinstatement at 2
Responsibility: Southern Water
EToN status: Advanced planning
A3055 Leeson Road, Ventnor, Isle Of Wight
23 June — 06 July Traffic control (two-way signals)
Delays possible due to Streetworks
Excavate In Footway And Carriageway For New Electric Service at Between Underground Subway And Sea Glen Lesson Road
Responsibility: Southern Electric
EToN status: Advanced planning
A3055 Marlborough Road, Ryde, Isle Of Wight
23 June — 25 June Some carriageway incursion
Delays possible due to Streetworks
– Install New Water Connecton at 131 Marlborough Road, Ryde, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
24 June — 25 June Traffic control (Stop/Go boards)
Delays possible due to Streetworks
The Works Will Consist Of Reading Of The Inclinometers, The Readings Will Be Done By Maddy, The Works Will Require The Assisstance To Ift The Covers And To Do The Tm Which Will Consist Of Stop And Go Boards, Two Days Are Allocated For The Works To Be Completed However Thre Days Should Be Allowed Incase Of Bad Weather. Freshwater at Freshwater: : Military Road—Military Road-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Undercliff Drive, Niton, Isle Of Wight
23 June — 31 July Some carriageway incursion
Delays unlikely due to Streetworks
Carry Ou Works In Island Roads Site To Recommission Existing 90mm Water Main And Reconnnect Properties. at Woodlands, Undercliff Drive, Ventnor, Isle Of Wight,
Responsibility: Southern Water
EToN status: Advanced planning
B3331 Fishbourne Lane, Wootton, Isle Of Wight
23 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 3 Lanterns (N? 2 Columns) 1 Warning Sign& 1 No Waiting Sign Wootton at Wootton: From Junction Of Quarr Lane, North To Dead End (Ml 341291, Ml 342291 & Ml 343291):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Bath Road, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 5 Lanterns (N? 1 Column & 3 Wb’S) 1 Parking Restriction Sign Cowes at Cowes: From High Street, North To The Parade (Ml 140012):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
High Street, Newchurch, Isle Of Wight
23 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 7 Lanterns (N? 7 Columns) 3 Bus Stops, 2 Route/Direction Signs, 4 Warning Signs & 1 Lit Speed Activation Sign Newchurch at Newchurch: From Junction Of School Lane, South To Junction Of Wackland Lane (Ml 430121, Ml 430123, Ml 430124 & Ml 440433
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
The Shute, Newchurch, Isle Of Wight
23 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 3 Lanterns (N? 3 Columns) 1 Warning Sign Newchurch at Newchurch: From The Junction Of High Street, North To End Column (Ml 430124 & Ml 430125):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Station Road, Wootton, Isle Of Wight
23 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Servie From Farside Carriageway To Site at Os 93
Responsibility: SGN
EToN status: Advanced planning
Chestnut Close, Newport, Isle Of Wight
23 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 3 Lanterns (N? 1 Column) Newpor at Newport: From Shide Road, South To Dead End (Ml 230105 And Ml 240305): :; Sl Cip Scheme Sl Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Church Road, Wootton, Isle Of Wight
24 June — 26 June No carriageway incursion
Delays unlikely due to Streetworks
Recover 1 Existing Pole at O/S 85 Church Road, Church Road
Responsibility: BT
EToN status: Advanced planning
Esplanade, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 5 Lanterns (N? 5 Columns) 1 Bus/Tram/Cycles Facilities Sign & 1 Warning Sign Cowes at Cowes: From The Parade, West To Column 3 (Ml 130120):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Old Seaview Lane, Seaview, Isle Of Wight
23 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Seaview at Seaview: From Pier Road To Somerset Road (Ml 330385): Old Seaview Lane-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Old Seaview Lane, Seaview, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Seaview at Seaview: From Steyne Road To Somerset Road (Ml 330386): Old Seaview Lane-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Palmers Road, Wootton, Isle Of Wight
24 June — 26 June No carriageway incursion
Delays unlikely due to Streetworks
Recover 1 Existing Pole at O/S 92 Palmers Rd, Palmers Road
Responsibility: BT
EToN status: Advanced planning
Queens Road, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 23 Lanterns (N? 1 Column) 2 Route/Direction Signs, 12 Parking Restriction Signs & 4 Warning Signs Cowes at Cowes: From Castle Hill, West To Princess Esplanade (Ml 130118, Ml 130119 & Ml 130120):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Southdown, Chale, Isle Of Wight
24 June — 26 June No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole 0.5m X 0.5m at Opp Southdown Cottage, Southdown
Responsibility: BT
EToN status: Advanced planning
St Marys Road, Cowes, Isle Of Wight
24 June — 30 June Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S 10
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Sun Hill, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install No 5 Lanterns (No 4 Columns) 1 Warning Sign, 2 No Waiting Signs Cowes at Cowes: From High Street, West To Union Road (Ml 140144): :; Sl Cip Scheme Sl Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
The Avenue, Gurnard, Isle Of Wight
23 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Gurnard at Gurnard: From Worsley Road To Tilbury Road (Ml 140109): The Avenue-Gurnard
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
The Mall, Binstead, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Frw: Bit Partrecon) Binstead at Binstead: Small Layby Section Southern End (Ml 340625a): The Mall-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Town Quay, Cowes, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 3 Lanterns (N? 2 Columns) 2 No Waiting/Loading Signs, 2 Route/Direction Signs, 1 Parking Restrictions Sign & 3 Warning Signs Cowes at Cowes: From High Street, East To Dead End (Ml 140316):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Woodside Avenue, Newchurch, Isle Of Wight
23 June — 25 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Newchurch at Newchurch: Main Section Of Footway From Ypungwoods Way (Ml 440445): Woodside Avenue-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Youngwoods Copse, Newchurch, Isle Of Wight
24 June — 26 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Part Recon) Newchurch at Newchurch: Full Length Of Footway From Youngwoods Way (Ml 440440): Youngwoods Copse-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning