Roadworks and road closures: 2nd July 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 Bonchurch Road, Shanklin, Isle Of Wight
03 July — 03 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin at Shanklin: From Access Road To Luccombe Chine House 500m North (Ml420025): Bonchurch Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Bonchurch Road, Shanklin, Isle Of Wight
03 July — 03 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin at Shanklin: From 500m North Of Access Road To Luccombe Chine House To Cowleaze Hill (Ml420026): Bonchurch Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Cowleaze Hill, Shanklin, Isle Of Wight
03 July — 03 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:H2, Resurface 25mm Ul-M 65psv Plus Regualting (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin at Shanklin: From Bonchurch Road 420m Northwest (Ml 420027): Cowleaze Hill-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Queens Road, Cowes, Isle Of Wight
03 July — 03 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Cowes at Cowes: From The Parade 350m West (Ml130120): Queens Road-Cowes:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Queens Road, Cowes, Isle Of Wight
03 July — 03 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3,Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Cowes at Cowes: From Mornington Road To Stanhope Drive (Ml 130119): Queens Road-Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Town Lane, Sandown, Isle Of Wight
03 July — 16 July Road closure
Delays likely due to Streetworks
Excavation Of Joint Bay In Road To Provide New Electrical Supply To New Commercial And Domestic Properties At No. 3 Wilkes Road. Backfill And Reinstate. at From O/S No. 1 To Jct Wilkes Road
Responsibility: Southern Electric
EToN status: Advanced planning

Wilkes Road, Sandown, Isle Of Wight
03 July — 16 July Road closure
Delays likely due to Streetworks
Excavation Of Cable Trench In Footway And Road Crossing To Provide New Electrical Supply To New Commercial And Domestic Properties At No. 3. Backfill And Reinstate. at From Jct High Street To Jct Union Road
Responsibility: Southern Electric
EToN status: Advanced planning

A3054 Binstead Hill, Binstead, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays possible due to Streetworks
Ryde (Pcp 21) Remedial Works To Rectify Ha Defect, All Works In Carriageway at S/O Glenfield Binstead Hill From C/W 3 To The Kerb
Responsibility: BT
EToN status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
02 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Gsmr/Hse Cut Off – So43732 at Os 54
Responsibility: SGN
EToN status: Advanced planning

A3054 Union Street, Ryde, Isle Of Wight
02 July — 09 July Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Upright Scaffold Services) at O/S 11
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Park Avenue, Ventnor, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure. at Eversley Hotel
Responsibility: Southern Water
EToN status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
03 July — 03 July No carriageway incursion
Delays unlikely due to Streetworks
Interim To Make Perm Fw Following: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 3 Poly Ducts In Footway. at In F/W Os 147, School Green Road
Responsibility: BT
EToN status: Advanced planning

Bonchurch Shute, Ventnor, Isle Of Wight
03 July — 07 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon) Ventnor at Ventnor: From The Pitts 250m East (Ml 540296): Bonchurch Shute-Ventnor
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Broadway Crescent, Binstead, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 98, Broadway Crescent,Ryde
Responsibility: Southern Water
EToN status: Advanced planning

Swanmore Road, Ryde, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatemenrt at 56, Swanmore Road, Ryde, Iow
Responsibility: Southern Water
EToN status: Advanced planning

Baring Road, Cowes, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure. at 90
Responsibility: Southern Water
EToN status: Advanced planning

Castle Court, Ventnor, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure at 34
Responsibility: Southern Water
EToN status: Advanced planning

Egerton Road, Bembridge, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 26 Egerton Road, Bembridge, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Fairfield Way, Totland, Isle Of Wight
03 July — 07 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Full Recon) Totland at Totland: Whole Length Of Footway From The Avenue (Ml 640365): Fairfield Way-Totland
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Hambrough Road, Ventnor, Isle Of Wight
02 July — 06 July Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure at Ventnor House
Responsibility: Southern Water
EToN status: Advanced planning

Hazlemere Avenue, Binstead, Isle Of Wight
02 July — 06 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit 50% Partrecon Fwr: Bit 50% Partrecon) Binstead at Binstead: Whole Length Of Footway From Parkway (Ml 361635): Hazlemere Avenue-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Marina Avenue, Ryde, Isle Of Wight
02 July — 06 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr :Bit Partrecon) Ryde at Ryde: From Appley Road 200 Mtrs North (Ml 340498): Marina Avenue-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Oaklyn Gardens, Shanklin, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 25 Oaklyn Gardens , Shanklin, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Old Park Road, Ventnor, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
– Iterim To Perm Reinstatement at Dovecot, Old Park Road,Ventnor,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

Station Road, Brading, Isle Of Wight
02 July — 03 July Some carriageway incursion
Delays unlikely due to Streetworks
Sandown (Pcp 16) Remedial Works To Rectify Ha Defect In Footway at Junc New Road On Station Road, Brading
Responsibility: BT
EToN status: Advanced planning

Watergate Road, Newport, Isle Of Wight
02 July — 15 July Some carriageway incursion
Delays unlikely due to Streetworks
Excavate In Carriageway And Footway For New Electric Service at Junc Watergate Road And St George’S School Entrance
Responsibility: Southern Electric
EToN status: Advanced planning

Woodside Avenue, Newchurch, Isle Of Wight
02 July — 06 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Newchurch at Newchurch: Main Section Of Footway From Ypungwoods Way (Ml 440445): Woodside Avenue-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning