Road closed block

Roadworks and road closures: 30th April

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

B3323 High Street, Newport, Isle Of Wight
30 April — 27 May
Delays possible Some carriageway incursion
Works location: O/S Watson Bull And Porter
Works description: Scaffold (B Ashton Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Albert Street, Cowes, Isle Of Wight
30 April — 05 May
Delays unlikely Some carriageway incursion
Works location: 55, Albert St, Cowes
Works description: Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Beatrice Close, Binstead, Isle Of Wight
01 May — 15 May
Delays unlikely Traffic control (give & take)
Works location: Binstead: Whole Length Of Road From Ringwood Road (Ml360466): Beatrice Close-Binstead
Works description: Footway Re-Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hamilton Path, Binstead, Isle Of Wight
01 May — 15 May
Delays unlikely Traffic control (give & take)
Works location: Binstead: Link Footway From Binstead Lodge Road To Hamilton Road (Ml F30419): Hamilton Path-Binstead
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Old Road, East Cowes, Isle Of Wight
30 April — 14 May
Delays unlikely Traffic control (give & take)
Works location: From Opp 35 Old Rd To Opp 1 Old Road
Works description: Excavation Of Joint Bay In Footway To Provide New Electrical Supplies To New Properties On Victoria Walk Site, Fronting Onto Old Road
Responsibility for works: Southern Electric
Current status: Advanced planning

Puckpool Close, Seaview, Isle Of Wight
01 May — 15 May
Delays unlikely Traffic control (give & take)
Works location: Seaview: Whole Length Of Road From Puckpool Hill (Ml 362311): Puckpool Close-Seaview
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Ell R Brown under CC BY 2.0