Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3056 Sandown Road, Arreton, Isle Of Wight
05 June — 08 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Locate And Excavate 2 Blockage In Existing Duct In Verge at In Verge Approx 61m+69m East From Opp New Barn Business Park, Sandown Road
Responsibility: BT
EToN status: Advanced planning
B3323 High Street, Newport, Isle Of Wight
04 June — 05 June Lane closure
Delays likely due to Streetworks
Saw Cut & Infill C/W Pothole Tm – Parking Suspension/ Lane Closure Required, Newport at Newport: Nr The Guildhall: High Street-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3399 Chale Street, Chale, Isle Of Wight
04 June — 05 June Traffic control (two-way signals)
Delays possible due to Streetworks
Renewing A Pole On The Grass Verge, And, Renewing Overhead Cable 2 Way Lights For Approx 2 Days, Manual Control. at Opposite Fulford Cottage Poles Are At Co-Ordinates Given
Responsibility: BT
EToN status: Advanced planning
Merstone Lane, Godshill, Isle Of Wight
05 June — 08 June Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Locate And Excavate 2 Blockage In Existing Duct In Carriageway at In Cw Opp Merstone Cottage & In Cw Opp Cheeks Farm On, Merstone Lane
Responsibility: BT
EToN status: Advanced planning
A3055 Undercliff Drive, Ventnor, Isle Of Wight
05 June — 18 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 12 Lanterns (N? 11 Columns) 2 Neighbourhood Watch Signs, 7 Warning Signs, 1 Lit Warning Sign, 1 Public Notice, 2 Lit Speed Activated Sign Ventnor at Ventnor: Column 1 – Opposite Steephill Gardens, Then From Junction Of Seven Sistsers Road, West To End Light (Ml 530042,
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3056 Arreton Street, Arreton, Isle Of Wight
05 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Arreton at Arreton: From Cherrywood View To Hazely Coombe (Ml 410061): Arreton Street-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3056 Arreton Street, Arreton, Isle Of Wight
05 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Arreton at Arreton: From Cherrywood View 250m East (Ml 410060): Arreton Street-Arreton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Arthur Street, Ryde, Isle Of Wight
04 June — 06 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 105, Arthur St, Ryde
Responsibility: Southern Water
EToN status: Advanced planning
B3320 Arctic Road, Cowes, Isle Of Wight
04 June — 08 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Connection at 225 Arctic Road , Cowes, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
B3323 Clatterford Road, Newport, Isle Of Wight
05 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 25, Clatterford Rd, Newport
Responsibility: Southern Water
EToN status: Advanced planning
B3330/B3340 Nettlestone Hill, Seaview, Isle Of Wight
04 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl: Bit Part Recon Fwr:Bit 50% Part Recon Seaview at Seaview: Full Length Of Footway Northern Side Of Nettlestone Green (Ml 330083b): Nettlestone Hill-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3395 Marshcombe Shute, Brading, Isle Of Wight
04 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing(Fwl: Bit Part Recon Fwr: Bit Part Recon) Brading at Brading: From Junction With New Road To Marshcombe Bridge(Ml 330107): Marshcombe Shute-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Hillway Road, Bembridge, Isle Of Wight
04 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwr :Bit Full Recon) Bembridge at Bembridge: Small Footway O/S Stanwell Farm (340160): Hillway Road-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Ashey Road, Ryde, Isle Of Wight
04 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwr : 50% Part Recon) Ryde at Ryde: Small Section Of Footway 20mtrs From The North Side Of Trotters Riding School (Ml320222): Ashey Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Arundel Road, Ryde, Isle Of Wight
05 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 20, Arundel Rd, Ryde
Responsibility: Southern Water
EToN status: Advanced planning
Carter Avenue, Shanklin, Isle Of Wight
04 June — 08 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 15, Carter Ave, Shanklin
Responsibility: Southern Water
EToN status: Advanced planning
Daniel Street, Ryde, Isle Of Wight
05 June — 12 June Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 42096 at Os 17
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning
Hatherton Road, Shanklin, Isle Of Wight
04 June — 08 June Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement at 16 Hatherton Road
Responsibility: Southern Water
EToN status: Advanced planning
Hill Street, Sandown, Isle Of Wight
05 June — 18 June Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay And Cable Trench In Footway To Provide Upgraded Electrical Supply To No. 2. Backfill And Reinstate. at From Jct Station Avenue To O/S No. 4
Responsibility: Southern Electric
EToN status: Advanced planning
Horestone Drive, Nettlestone, Isle Of Wight
04 June — 05 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl: Bit Partrecon Fwr : Bit Partrecon) Nettlestone at Nettlestone: Whole Length Of Footway From Horestone Rise (Ml 340553): Horestone Drive-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Horestone Rise, Nettlestone, Isle Of Wight
04 June — 17 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr : Bit Partrecon) Nettlestone at Nettlestone: Whole Length Of Road From Gully Road (Ml 340554): Horestone Rise-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Kent Avenue, East Cowes, Isle Of Wight
05 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 25, Kent Ave, East Cowes
Responsibility: Southern Water
EToN status: Advanced planning
Littlestairs Road, Shanklin, Isle Of Wight
04 June — 08 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Connection at 20 Littlestairs Road, Shanklin, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Mayfield Road, East Cowes, Isle Of Wight
04 June — 08 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Reinstatement Of Core Failure. at 10 Mayfield Road
Responsibility: Southern Water
EToN status: Advanced planning
Nelson Crescent, Ryde, Isle Of Wight
04 June — 08 June Some carriageway incursion
Delays unlikely due to Streetworks
– Repair Leaking Stop Tap at 6, Nelson Cres, Ryde
Responsibility: Southern Water
EToN status: Advanced planning
Quay Lane, Brading, Isle Of Wight
05 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 46-48 High Street, Brading, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Queens Road, Cowes, Isle Of Wight
04 June — 08 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Slurry Fwr: Bit Partrecon) Cowes at Cowes: From Mornington Road 300m East (Ml 130119): Queens Road-Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
St Andrews Street, Cowes, Isle Of Wight
05 June — 09 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Works To Be Carried Out at Os 31
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning
Thetis Road, Cowes, Isle Of Wight
04 June — 08 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Reinstatement Of Core Failure. at 23 Thetis Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning