Road closed

Roadworks and road closures: 8th April

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Roadworks

A3055 Esplanade, Ryde, Isle Of Wight
09 April — 09 June
Delays likely Road closure
Works location: Ryde: Westbound C/Way-From Union Street To Dover Street (Ml 310062): Esplanade-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Flexi&5%Recon:U/H1, Resurface 40mm Ul-M 65psv With Flexiplast System & 5% Reconscruction-Urban:H1) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3326 Monkton Street, Ryde, Isle Of Wight
09 April — 15 May
Delays likely Road closure
Works location: From Simeon Street To The Strand, Monkton Street, Ryde, Isle Of Wight.
Works description: – Flood Alleviation Scheme From Simeon Street To The Strand.
Responsibility for works: Southern Water
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From 250m East Of Pallance Lane A Further 240m East (Ml130056): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Flexi&5%Recon:R/H3, Resurface 40mm Ul-M 65psv With Flexiplast System & 5% Reconstruction-Rural:H3 Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From 240m East Of Rew Street To Pallance Lane (Ml130054): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From Pallance Lane 250m East Thereof (Ml130055): Pallance Road-Northwood:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) Northw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: Frpm Rew Street 240m East (Ml130053): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From 490m East Of Pallance Lane To Wyatts Lane (Ml130057): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From Place Road To Wyatts Lane (Ml130058): Pallance Road-Northwood:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From Park View To Glendale Close (Ml 320172): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From Park View 210m Southwest (Ml320171): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From Glendale Close 370m Northeast (Ml 320173): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From High Street 210m South (Ml 320174): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Watergate Road, Newport, Isle Of Wight
08 April — 10 April
Delays likely Road closure
Works location: Land East Of Newport Nursery,Watergate Road,Newport,Iow.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 High Street, Wootton, Isle Of Wight
09 April — 13 April
Delays possible Some carriageway incursion
Works location: 80, High St, Wootton Bridge, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 High Street, Shanklin, Isle Of Wight
08 April — 10 April
Delays possible Some carriageway incursion
Works location: Paramount Fish Bar 74, High St, Shanklin, Po376nj
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

A3056 Newport Road, Apse Heath, Isle Of Wight
09 April — 10 April
Delays possible Traffic control (two-way signals)
Works location: Apse Heath: O/S Bramley Cottage.: Newport Road-Apse Heath
Works description: Infill C/W Pothole 2×0.4x40mm Tm Stop/Go Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
08 April — 22 April
Delays possible Some carriageway incursion
Works location: O/S Take Two
Works description: Scaffold (1st Choice Scaffold)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330 St Johns Road, Ryde, Isle Of Wight
09 April — 13 April
Delays possible Some carriageway incursion
Works location: 113, St. Johns Rd, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Afton Road, Freshwater, Isle Of Wight
08 April — 21 April
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction Of Newport Road, South To Gate Lane (Ml 620058, Ml 620059, Ml 620060 & Ml 620061):
Works description: Install N? 8 Lanterns (N? 3 Pole Brackets) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3340 Fairy Road, Seaview, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: Cairnbrook, Fairy Rd, Seaview
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3341 Castle Hill, Newport, Isle Of Wight
09 April — 22 April
Delays unlikely Traffic control (give & take)
Works location: Newport: From Castle Road, West To Junction Of Castle Lane (Ml 240085):
Works description: Install N? 4 Lanterns (N? 4 Columns) 1 Warning Sign & 1 Route/Direction Sign (Ml 240085) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Steyne Road, Bembridge, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: O/S 41-43 Steyne Road Bembridge
Works description: Provide New Pole To Provide Service To Customer
Responsibility for works: BT
Current status: Advanced planning

Bath Road, Ventnor, Isle Of Wight
08 April — 10 April
Delays unlikely No carriageway incursion
Works location: On The Junction Of Belgrave Road And Bath Road
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Bay Road, Freshwater, Isle Of Wight
08 April — 13 April
Delays unlikely No carriageway incursion
Works location: Replace Cover F/W O/S Bella Vista , Bay Road
Works description: Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway
Responsibility for works: BT
Current status: Advanced planning

Heathfield Road, Freshwater, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: On Grass Outside 10 Golden Villas
Works description: Excavate And Remove Royal Mail Pouchbox
Responsibility for works: Romec Ltd
Current status: Advanced planning

Camp Road, Freshwater, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: Top Of Camp Rd In Hedge Rhs
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Queens Road, Freshwater, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: On Bank Half Way Up Queens Rd Outide 2 Queens View
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Arundel Road, Ryde, Isle Of Wight
08 April — 10 April
Delays unlikely Some carriageway incursion
Works location: 10, Arundel Rd, Ryde, Po331bn
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Arundel Road, Ryde, Isle Of Wight
08 April — 10 April
Delays unlikely Some carriageway incursion
Works location: 20, Arundel Rd, Ryde, Po331bn
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Castle Lane, Carisbrooke, Isle Of Wight
09 April — 22 April
Delays unlikely Traffic control (give & take)
Works location: Carisbrooke: From Castle Hill, North West To Millers Lane (Ml 240247):
Works description: Install N? 2 Lanterns (N? 1 Pb) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Castle Street, Carisbrooke, Isle Of Wight
09 April — 22 April
Delays unlikely Traffic control (give & take)
Works location: Carisbrooke: From Carisbrooke High Street, South To Millers Lane (Ml 240246):
Works description: Install N? 4 Lanterns (N? 4 Columns) 2 Warning Signs & 1 Lit Warning Sign Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Church Place, Freshwater, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: Top Of Hooke Hill Opposite Chruch Place
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Cothey Way, Ryde, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: Cypress Court,Cothey Way , Ryde, Isle Of Wight .
Works description: – Install New Water Connections
Responsibility for works: Southern Water
Current status: Advanced planning

Downsview, Sandown, Isle Of Wight
08 April — 10 April
Delays unlikely Some carriageway incursion
Works location: 95, Downsview, Sandown, Po369ny
Works description: Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Edinburgh Road, Freshwater, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: Entrance To Regina Rd
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Fort Warden Road, Totland, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: Entrance To Fort Warden Rd
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Heath Meadow, Freshwater, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: Entrance To Solent Gardens
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Heath Road, Lake, Isle Of Wight
08 April — 10 April
Delays unlikely Some carriageway incursion
Works location: 16, Heath Rd, Sandown, Po368pg
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Linden Path, Newport, Isle Of Wight
09 April — 22 April
Delays unlikely Traffic control (give & take)
Works location: Newport: Link Footway From Whitepit Lane To Linden Road (Ml F20437): Linden Path-Newport
Works description: Footway Re Construction And Surfacing (Fwl: Bit Fullrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Louis Road, Lake, Isle Of Wight
08 April — 10 April
Delays unlikely Some carriageway incursion
Works location: 22, Louis Rd, Sandown, Po396ht
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Madeira Road, Totland, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: Opposite Sentry Mead Hotel On Grass
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Middleton, Freshwater, Isle Of Wight
09 April — 13 April
Delays unlikely No carriageway incursion
Works location: Next To Phone Box Just Inside Junction
Works description: Excavate And Remove Royal Mail Pouch Box
Responsibility for works: Romec Ltd
Current status: Advanced planning

Mill Road, Yarmouth, Isle Of Wight
09 April — 22 April
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: From Tennyson Road, South To Station Road (Ml 640499):
Works description: Install N? 4 Lanterns (N? 0 Pole Brackets) Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Millers Lane, Newport, Isle Of Wight
09 April — 22 April
Delays unlikely Traffic control (give & take)
Works location: Newport: From Castle Lane, North To Single Column (Ml 240245):
Works description: Install N? 1 Lantern (N? 1 Column) 2 Route/Direction Sign & 1 Warning Sign Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Oaks Close, East Cowes, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: 6, Oaks Cl, East Cowes
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Osborne Heights, East Cowes, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: 69, Osborne Hgt,East Cowes
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Osborne Heights, East Cowes, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: 87, Osborne Hgt, East Cowes
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Quay Path, Newport, Isle Of Wight
08 April — 21 April
Delays unlikely Traffic control (give & take)
Works location: Newport: Link Footway From Coppins Bridge To Fairlee Road (Ml F20284): Quay Path-Newport
Works description: Footway Re Construction And Surfacing (Fwl: Bit Fullrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Seagrove Manor Road, Seaview, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: Arkley, Seagrove Manor Rd, Seaview
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Southgrove Road, Ventnor, Isle Of Wight
08 April — 21 April
Delays unlikely Traffic control (give & take)
Works location: From O/S The Physiotherapy Centre To O/S 5 Southgrove Terrace
Works description: Excavation Of Jointbay In Road To Install New Supply To New Property Adj 1 Southgrove Terrace
Responsibility for works: Southern Electric
Current status: Advanced planning

Image: oatsy under CC BY 2.0