Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
The following roads are affected (at 7am Tuesday) due to flooding:
Harding Shute, Brading
Please drive carefully through Shalfleet- as both Yarmouth and Newport ends have carriageway flooding.
A3054 Fairlee Road, Newport, Isle Of Wight
14 January — 16 January
Delays likely Traffic control (two-way signals)
Works location: Newport: Just Past 346 Fairlee Road On The Ryde Bound Side Of The C/Way: Fairlee Road-Newport
Works description: (Pr) Idr – Manhole Cover 1297 Breaking Out Needs Resetting Tm – Two Way Temp Lights Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Ningwood Hill, Shalfleet, Isle Of Wight
14 January — 16 January
Delays likely Traffic control (give & take)
Works location: Shalfleet: Between Hamstead Drive & Cranmore Avenue (Ml 610030): Ningwood Hill-Shalfleet
Works description: Footway Re Constrution And Surfacing (Fwl:Bit 50% Partrecon) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3056 Arreton Street, Arreton, Isle Of Wight
14 January — 16 January
Delays possible Traffic control (two-way signals)
Works location: Arreton: Just Past The Entrance To Challen House On The Newport Bound Side Of The C/Way – Nearside Tyreline: Arreton Str
Works description: P/H .50 X .30 X 35mm Tm – Two Way Temp Lights On A 40mph ‘A’ Road To Newport Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3328 Queens Road, Shanklin, Isle Of Wight
14 January — 27 January
Delays possible Traffic control (two-way signals)
Works location: Shanklin: From Clarendon Road To Palmerston Road (Ml 430090): Queens Road-Shanklin
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr:Bit Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Niton Road, Rookley, Isle Of Wight
13 January — 15 January
Delays possible Traffic control (Stop/Go boards)
Works location: Rookley: One Pot Hole O/S A Property Called Pipers, Two Pot Holes O/S A Property Called Melbury, One Pot Hole, 0mm X. 0
Works description: (Pr) Please Cut Out/ Tackcoat & Overlay 7no. C/W Pot Holes, 1:- 600mm X 570mm X 60mm Deep, 2:- 1m X 590mm X. 45mm, 3:- 580mm X 580mm X 35mm. 4:- 360mm X 250mm X 55mm Deep, 5:- 520mm X 270mm X. 70mm, 6:- 420mm X 360mm X 65mm. 7:- 1.1m X. 400mm X 45mm, Tm= 30mph Road But Stop/Go Boards Please Due To Visability Or G&T With Lots Of Advanced Warning. Please Contact Derek On 07714596348 If Clarification Is Needed On The Location Of Job Rookley
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020/A3021 Medina Road, Cowes, Isle Of Wight
13 January — 14 January
Delays unlikely No carriageway incursion
Works location: (Pcp39) 449944,095659 449935,095668 Outside 40, Medina Road Cowes Po31 7lp, Medina Road
Works description: Interim Reinstatement To Permenant Reinstatement
Responsibility for works: BT
Current status: Advanced planning
A3020/A3021 Medina Road, Cowes, Isle Of Wight
13 January — 14 January
Delays unlikely No carriageway incursion
Works location: (Pcp39) 449944,095659 449935,095668 Outside 40, Medina Road
Works description: Interim Reinstatement To Permenant Reinstatement
Responsibility for works: BT
Current status: Advanced planning
A3020 Victoria Avenue, Shanklin, Isle Of Wight
13 January — 15 January
Delays unlikely No carriageway incursion
Works location: O/S Ochiltree House, Victoria Avenue
Works description: Install 3m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning
A3054 Tennyson Road, Yarmouth, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 2, Elm Villas, Tennyson Rd, Yarmouth, Po410px
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
B3325 Park Road, Cowes, Isle Of Wight
14 January — 20 January
Delays unlikely Some carriageway incursion
Works location: O/S 86
Works description: Scaffold (Sds Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3331 Fishbourne Lane, Wootton, Isle Of Wight
14 January — 31 March
Delays unlikely Traffic control (priority working)
Works location: From Junc Of Ashlake Copse Road To Junct Of Ranalagh Drive Cw Fw Verge
Works description: Remove From Risk 281m Of 8″ Ci Main. Replace With 281m Of 250mm Pe Main. Connect Side Streets. Relay And Transfer Services
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning
B3395 High Street, Bembridge, Isle Of Wight
13 January — 14 January
Delays unlikely Some carriageway incursion
Works location: Cway Tarmac Section 81/Cch Ref 1636105, Hazardous Site, Worn/Dmgd Frm/Cov Adj 39 , High Street
Works description: Interim Reinstatement To Permenant Reinstatement
Responsibility for works: BT
Current status: Advanced planning
Brockwood Drive, Shanklin, Isle Of Wight
14 January — 27 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Josephs Way, West To Dead End (Ml 440236):
Works description: Install N? 2 Lanterns (N? 2 Columns) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Regent Street, Shanklin, Isle Of Wight
13 January — 19 January
Delays unlikely Some carriageway incursion
Works location: O/S Glen Morgans 26-28
Works description: Scaffold (Md Scaffold)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St Boniface Cliff Road, Shanklin, Isle Of Wight
13 January — 26 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Northcliff Gardens, East To Dead End (Ml 441298):
Works description: Install N? 2 Lanterns (N? 2 Columns) 1 Route/Direction Sign & 2 Warning Signs Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Park Road, Ryde, Isle Of Wight
13 January — 15 January
Delays unlikely No carriageway incursion
Works location: Adj 61, Park Road
Works description: Install 1m Of 1 Way Poly Duct In Verge,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning
Chine Hill, Shanklin, Isle Of Wight
13 January — 26 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Esplanade, South Then West To Everton Lane (Ml 440207):
Works description: Install N? 6 Lanterns (N? 6 Columns) 1 Route/Direction Sign & 2 Warning Signs Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress
Collards Close, Freshwater, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 59,Collards Cl, Freshwater, Po409jw
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Culver Way, Sandown, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 7 Culver Way , Sandown, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Cynthia Grove, Newport, Isle Of Wight
14 January — 27 January
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road From Staplers Road (Ml 240219): Cynthia Grove-Newport
Works description: Footway Re Construction And Surfacing (Fwl:Bit Fullrecon Fwr:Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Denny Gardens, Shanklin, Isle Of Wight
14 January — 27 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Josephs Way, South To Dead End (Ml 440236):
Works description: Install N? 1 Lantern (N? 1 Column) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Everton Lane, Shanklin, Isle Of Wight
13 January — 26 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Chine Hill, West To Single Light (Ml 440207):
Works description: Install N? 1 Lantern (N? 1 Column) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress
Falcon Cross Road, Shanklin, Isle Of Wight
13 January — 26 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Collingwood Road, East To Clarendon Road (Ml 441298):
Works description: Install N? 3 Lanterns (N? 3 Columns) 1 Cctv Related Sign, 2 Parking Restriction Signs & 2 Lit Warning Signs Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Golden Ridge, Freshwater, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 12, Golden Ridge,Freshwater,Iow.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Heath Meadow, Freshwater, Isle Of Wight
14 January — 22 January
Delays unlikely Traffic control (give & take)
Works location: Os War Memorial Bungalow
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning
Hope Road, Shanklin, Isle Of Wight
14 January — 27 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Arhturs Hill, East To Hope Hill, Including Car Park By Esplanade (Ml 440210 & Ml 440218):
Works description: Install N? 12 Lanterns (N? 12 Columns) 3 Bus Stops, 1 No Waiting Sign & 1 Warning Sign Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Hurst Point View, Totland, Isle Of Wight
13 January — 14 January
Delays unlikely No carriageway incursion
Works location: (Pcp1) The Broadway Junction, Hurst Point View
Works description: Interim Reinstatement To Permenant Reinstatement
Responsibility for works: BT
Current status: Advanced planning
Linstone Drive, Yarmouth, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 19, Linstone Drive,Yarmouth,Iow.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Marina Avenue, Ryde, Isle Of Wight
13 January — 14 January
Delays unlikely No carriageway incursion
Works location: Sd6yax45, F/W Os 14, Marina Avenue
Works description: Build 1 Precast Jointing Chamber (725mm X 225mm) 600mm Dep,Install 1m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
Martine Close, Freshwater, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 13, Martine Cl, Freshwater, Po409nd
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Newport Footpath 179, Newport, Isle Of Wight
13 January — 14 January
Delays unlikely No carriageway incursion
Works location: (Pcp42) 449777,089063 Opposite 68 Castlehold Lane On, Newport Footpath 179 Newport Po30 1sb, Newport
Works description: Interim Reinstatement To Permenant Reinstatement
Responsibility for works: BT
Current status: Advanced planning
Oakhills, Shanklin, Isle Of Wight
14 January — 27 January
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Blythe Way, West To Dead End (Ml 440231):
Works description: Install N? 1 Lantern (N? 1 Column) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Perowne Way, Sandown, Isle Of Wight
13 January — 15 January
Delays unlikely Traffic control (give & take)
Works location: Sandown: Link Footway In Front Of 130/136 Perowne Way (Ml F40666): Perowne Way-Sandown
Works description: Footway Re Constrution And Surfacing (Fwl:Bitpartrecon) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Perowne Way, Sandown, Isle Of Wight
14 January — 16 January
Delays unlikely Traffic control (give & take)
Works location: Sandown: Link Footway In Front Of 139/163 Perowne Way (Ml F40668): Perowne Way-Sandown
Works description: Footway Re Constrution And Surfacing (Fwl:Bit 50% Partrecon) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Princes Close, Totland, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 4, Princes Cl, Totland Bay, Po390af
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Silcombe Lane, Freshwater, Isle Of Wight
13 January — 26 January
Delays unlikely Traffic control (give & take)
Works location: From O/S 4 Silcombe Villas To Jct Princes Road
Works description: Excavation Of Joint Bay In Footway And Road Crossing To Provide New Electrical Supplies To 4 New Properties Adj The Prince Of Wales Public House.
Responsibility for works: Southern Electric
Current status: Advanced planning
Springvale Road, Seaview, Isle Of Wight
13 January — 15 January
Delays unlikely No carriageway incursion
Works location: Opp Beach House Public House , Springvale Road
Works description: Excavate 1 Location(S) To Expose Cable Damage,Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning
St James Square, Newport, Isle Of Wight
13 January — 15 January
Delays unlikely No carriageway incursion
Works location: O/S 22a St James Square Newport Iow Po30 1ux, St James Square
Works description: Install 1m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
Summers Court, Totland, Isle Of Wight
14 January — 15 January
Delays unlikely No carriageway incursion
Works location: (Pcp12) 433106,086736 433116,086735 Side Of 9 Court Road On, Summers Court
Works description: Interim Reinstatement To Permenant Reinstatement
Responsibility for works: BT
Current status: Advanced planning
The Mount, Yarmouth, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 3, The Mount, Yarmouth
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
The Sheilings, Freshwater, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: 4, The Sheilings, Freshwater
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Warlands Lane, Shalfleet, Isle Of Wight
13 January — 15 January
Delays unlikely Traffic control (give & take)
Works location: Shalfleet: Link Footway From No 9 Warlands Lane 300 Mtrs West (Ml F60610): Warlands Lane-Shalfleet
Works description: Footway Re Construction And Surfacing (Fwl:Bit Fullrecon) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Weston Road, Totland, Isle Of Wight
14 January — 16 January
Delays unlikely Some carriageway incursion
Works location: Shaston, Weston Rd, Totland Bay, Po390ha
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Woodvale Road, Gurnard, Isle Of Wight
14 January — 16 January
Delays unlikely No carriageway incursion
Works location: (Pcp37) 448100,095823 Outside 13 Woodvale Road Isle Of Wight Po31 8eh, Woodvale Road
Works description: Interim Reinstatement To Permenant Reinstatement.
Responsibility for works: BT
Current status: Advanced planning