Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3020 Medina Way, Newport, Isle Of Wight
15 August — 19 August
Delays likely Lane closure
Works location: Newport: From Dodnor Lane, South To Coppins Roundabout (Ml 210008, Ml 210011, Ml 210012, Ml 210013, Ml 210014 And Ml 210
Works description: Install No 25 Lanterns (No 19 Columns) 1 Cctv Camera, 1 Route/Direction Sign And 7 Warning Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Medina Way, Newport, Isle Of Wight
15 August — 19 August
Delays likely Lane closure
Works location: Newport: From Riverway, East To Medina Way Eastbound (Ml 210014 And Ml 240171): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns (No 0 Columns) 1 Lit Warning Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Medina Way, Newport, Isle Of Wight
15 August — 19 August
Delays likely Lane closure
Works location: Newport: From Medina Way, North To Parkhurst Road (Ml 210016, Ml 210017, Ml 210018, Ml 210019 And Ml 210020): :; Sl Cip
Works description: Install No 25 Lanterns (No 17 Columns) 4 X 40mph Signs, 1 Bus/Tram/Cycle Facilities Sign, 1 Route/Direction Sign, 4 Warning Signs And 1 Lit Speed Activated Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Medina Way, Newport, Isle Of Wight
15 August — 19 August
Delays likely Lane closure
Works location: Newport: From Riverway, East To Medina Way Westbound (Ml 210009 And Ml 241229): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns (No 2 Columns) 1 Lit Warning Sign And 2 Route/Direction Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Medina Way, Newport, Isle Of Wight
15 August — 19 August
Delays likely Lane closure
Works location: Newport: From Coppins Aroundabout, North West To Medina Way Roundabout (Ml 210008, Ml 210009, Ml 210010 And Ml 210011):
Works description: Install No 16 Lanterns (No 10 Columns) 1 40mph Sign, 1 Route/Direction Sign And 4 Warning Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Gate Lane, Freshwater, Isle Of Wight
14 August — 14 September
Delays likely Road closure
Works location: Freshwater: Freshwater Bay Car Park (Cp019): Gate Lane-Freshwater:; Eric Longworth
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Stren:R/H4, Car Park – Strengthening Overlay – 60mm Foambase, 25mm Ac10 Surface) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Highfield Road, Shanklin, Isle Of Wight
14 August — 05 September
Delays likely Road closure
Works location: Shanklin: From Victoria Avenue To Westhill Road (Ml 440261): Highfield Road-Shanklin:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Tulse Hill, Ventnor, Isle Of Wight
14 August — 01 September
Delays likely Road closure
Works location: Ventnor: From Grove Road To Marlborough Road (Ml540175): Tulse Hill-Ventnor:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 High Street, Brading, Isle Of Wight
15 August — 21 August
Delays possible Some carriageway incursion
Works location: O/S 74
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3056 Newport Road, Lake, Isle Of Wight
14 August — 28 August
Delays possible Traffic control (two-way signals)
Works location: Lake: From Sandown Road, West To Outside Airport (Ml 410087, Ml 410081, Ml 410082, Ml 410084, Ml 410085 And Ml 410086):
Works description: Install No 34 Lanterns ( No 9 Cols) 2 No Waiting/Loading Signs, 13 Warning Signs, 2 Route/Direction Signs, 3 X 40mph Signs, 1 Lit Speed Activation Sign And 1 Large Lit Speed Activation Signs Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Briddlesford Road, Newport, Isle Of Wight
15 August — 15 August
Delays possible Traffic control (two-way signals)
Works location: Newport: 20m Past Glenfield On The E/B C/Way: Briddlesford Road-Newport:; Scheduler Ops Hub
Works description: Idr – Edge Of C/Way Crumbling And Encroaching Into The Solid White Line, Infill Edge With Type 1 And Feather Edge With Bitmac 2.60 X .15 X 1.30mm Edge 1.10 X .15 X 70mm Edge Tm – Two Way Temp Lights On National Speed Limit C/Way (Cw: Pothole) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
West Street, Newport, Isle Of Wight
14 August — 28 August
Delays possible Traffic control (two-way signals)
Works location: Newport: From Carisbrooke Road, South To Trafalgar Road (Ml 240234): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 6 Lanterns (No 5 Columns) 2 Route/Direction Signs And 1 Warning Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning