Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

Sandown And Shanklin Footpath 86, Sandown, Isle Of Wight
16 January — 18 January
Delays likely Road closure
Works location: In Cw Opp Side Of 2 Nunwell Street On, Sandown And Shanklin Footpath 86
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

A3021 York Avenue, East Cowes, Isle Of Wight
16 January — 13 February
Delays possible Some carriageway incursion
Works location: O/S Co-Op
Works description: Scaffold (Mattison Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
16 January — 16 January
Delays possible Traffic control (two-way signals)
Works location: Opp Alvington View Calbourne Rd Newport Isle Of Wight Po30 5sr
Works description: Access Required To Underground Bt Structure To Provide Service – No Structural Changes. Work Being Carried Out On Existing Bt Plantbetween 09.30 And 15.30hrs Only
Responsibility for works: BT
Current status: Advanced planning

B3401 Sun Hill, Calbourne, Isle Of Wight
16 January — 23 January
Delays possible Traffic control (two-way signals)
Works location: From Junction Of Sunhill/Elm Lane To Sunhill Opposite Calbourne Ate.
Works description: Start 08.00. Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place During Working Hours . No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

Canteen Road, Newchurch, Isle Of Wight
16 January — 16 January
Delays possible Traffic control (two-way signals)
Works location: Outside Meadow View On Canteen Road Newchurch Isle Of Wight Po38 3ae
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning

Elm Lane, Calbourne, Isle Of Wight
16 January — 23 January
Delays possible Traffic control (two-way signals)
Works location: From Junction A3054 / Elm Lane To Junction Elm Lane / Sunhill
Works description: Start 08.00. Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place During Working Hours . No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Jnc Clissold Road On, Parkhurst Road
Works description: Install 9m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

A3020 School Road, Godshill, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: Wyeval, School Road, Godshil. Iow.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: O/S Ochiltree House, Victoria Avenue
Works description: Install 3m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Adj Osborne Works, Whippingham Road
Works description: Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

A3055 Church Street, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 13 Church Street, Ventnor, Isle Of Wight.
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 119 Flat 2, Fairlawns, High St, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 149 High Street, Ventnor, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 140, High St, Ventnor, Po381lz
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 144, High St, Ventnor
Works description: – Repair Leaking Comm Pipe
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Leeson Road, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 23, Leeson Rd, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Park Avenue, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: Byrnhill Grove, Park Avenue, Ventnor,Iow.
Works description: – Interimt To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Victoria Street, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 6a Victoria Street, Ventnor, Isle Of Wight.
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Zig Zag Road, Ventnor, Isle Of Wight
16 January — 26 January
Delays unlikely Traffic control (give & take)
Works location: Os Plot Adj To 48
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Albert Street, Newport, Isle Of Wight
16 January — 22 January
Delays unlikely Some carriageway incursion
Works location: O/S 8
Works description: Scaffold (Lowes Scaffold)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Tarmac F/W O/S Carphone Warehouse 51 To 53, High Street
Works description: Install 13m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

B3328 Queens Road, Shanklin, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Jnc Hope Road On, Queens Road
Works description: Install 1m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

High Street, Whitwell, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Opp Glengariff, High Street
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

Park Road, Ryde, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Adj 61, Park Road
Works description: Install 1m Of 1 Way Poly Duct In Verge,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Chapel Road, Binstead, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: At Junc Of Arnold Road On, Chapel Road
Works description: Install 10m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Churchill Road, Cowes, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: O/S 18, Churchill Road
Works description: Build 1 Precast Chamber 725mm X 255mm X 665mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Gloucester Road, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 15a, Gloucester Rd, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Grange Avenue, Binstead, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Fway Tarmace Section 81/Cch Ref 1634574 Reset Joint Box Or M/H Frame And Cover, Junction Of Coachhouse Lane , Grange Av
Works description: Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway
Responsibility for works: BT
Current status: Advanced planning

Greenlydd Close, Niton, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 28, Greenlydd Cl, Niton, Ventnor, Po382bj
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Hambrough Road, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: Ventnor House, Hambrough Rd, Ventnor, Po381sq
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Hurst Point View, Totland, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: O/S 7/9, Hurst Point View
Works description: Install 3m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Jeals Lane, Sandown, Isle Of Wight
16 January — 20 January
Delays unlikely Traffic control (give & take)
Works location: Sandown: Link Footway Running In Front Of 183/187 Perowne Way (F40669): Jeals Lane-Sandown
Works description: Footway Re Construction And Surfacing (Fwl:Bit Partrecon) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Landguard Road, Shanklin, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Adj 111, Landguard Road
Works description: Replace 1 Jointbox Frame And Cover(S) (2315mm X 737mm) In Footway
Responsibility for works: BT
Current status: Advanced planning

Lanes End, Totland, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Os 6, Lanes End
Works description: Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway
Responsibility for works: BT
Current status: Advanced planning

Longwood Lane, Lake, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: 300m West Of Sandown And Shanklin Footpath , Longwood Lane
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S)
Responsibility for works: BT
Current status: Advanced planning

Madeira Road, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 34, Madeira Rd, Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Nettlecombe Lane, Whitwell, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 9, Nettlecombe Lane, Whitwell , Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Newchurch Footpath 12, Newchurch, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: New Church Pathway, Runnung Parallel With Woodside Way, Po36 0jd
Works description: To Renew Pole And Cabling With An Excavation Of Approximately 1.5 Mtrs.Hours Of Work 0900 To 1600.1.2 Mtrs Will Be Maintained For Pedestrians & 3.5m Maintained For Vehicles.
Responsibility for works: BT
Current status: Advanced planning

Old Seaview Lane, Seaview, Isle Of Wight
16 January — 20 January
Delays unlikely No carriageway incursion
Works location: Early Start Agreed See Job Pack: In C/W O/S Cheragin On, Old Seaview Lane
Works description: Reposition 6m Of Duct (Up To 4 Poly Ducts)
Responsibility for works: BT
Current status: Advanced planning

Percy Path, Lake, Isle Of Wight
16 January — 20 January
Delays unlikely Traffic control (give & take)
Works location: Lake: Link Footway Between Percy Road & New Road, Lake (Ml F40717): Percy Path-Lake
Works description: Footway Re Constrution And Surfacing (Fwl:Bit 50% Partrecon) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Southgrove Road, Ventnor, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: Kilmurry, Southgrove Rd, Ventnor
Works description: -Interimt To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Spanners Close, Chale, Isle Of Wight
16 January — 20 January
Delays unlikely Some carriageway incursion
Works location: 22, Spanners Cl, Chale Green, Ventnor, Po382hy
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Image: Zahlm under CC BY 2.0