Road works road closed signs

Roadworks and road closures: 25th November 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 Morton Road, Brading, Isle Of Wight
25 November — 27 November
Delays likely Traffic control (two-way signals)
Works location: Morton Rd From Morton Common To New Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Will Be Required. Work Will Take Place Between 0900hrs And 1600hrs. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3322 Church Hill, Totland, Isle Of Wight
25 November — 19 December
Delays likely Road closure
Works location: Totland: From Madiera Road To York Road (Ml630097): Church Hill-Totland:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Totlan
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
26 November — 09 December
Delays likely Traffic control (give & take)
Works location: Newport: From Junction Of South Street, South To Junction Of Trafalgar Square (Ml 220081): :; Sl Cip Scheme Sl Cip Schem
Works description: Install N? 6 Lanterns (N? 1 Column And 4 Wall Brackets) 2 Lit Warning Signs, 1 Cctv Related Sign And 1 No Waiting/Loading Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Church Road, Binstead, Isle Of Wight
25 November — 01 January 2015
Delays likely Road closure
Works location: Binstead: From Binstead Hill To Quarr Road (Ml340502) : Church Road-Binstead:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Mill Hill Road, Cowes, Isle Of Wight
26 November — 28 November
Delays possible Traffic control (two-way signals)
Works location: 82
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Colwell Road, Freshwater, Isle Of Wight
26 November — 28 November
Delays possible Traffic control (two-way signals)
Works location: Colwell Rd. From Junc Hill Lane To Junc Heathfield Rd
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Will Be Required. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Between 09:30 And 15:30hrs. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

A3054 Halletts Shute, Yarmouth, Isle Of Wight
26 November — 28 November
Delays possible Traffic control (two-way signals)
Works location: Hallets Shute From Bridge Rd A 3054 To Junc Of Pixley Hill
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Will Be Required. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Between 09:30 And 15:30hrs. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
25 November — 01 December
Delays possible Some carriageway incursion
Works location: O/S Superdrug
Works description: Scaffold (Sds Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Daish Way, Newport, Isle Of Wight
26 November — 09 December
Delays possible Traffic control (two-way signals)
Works location: Newport: From Dodnor Lane, East, Then North To Barry Way (Ml 240175 And Ml 241357): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 6 Lanterns (N? 5 Columns) 1 Route/Direction Sign, 3 No Waiting Signs And 2 Bus Stops Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Greenham Drive, Nettlestone, Isle Of Wight
26 November — 28 November
Delays possible Traffic control (two-way signals)
Works location: Nettlestone: From Sirius Close 250 Mtrs North (Ml 340533): Greenham Drive-Nettlestone
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr : Bit Partrecon) Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Manners View, Newport, Isle Of Wight
25 November — 08 December
Delays possible Traffic control (two-way signals)
Works location: Newport: From Daish Way, East, Then South To Riverway (Ml 240173): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 12 Lanterns (N? 12 Columns) 2 Bus Stops, 1 No Waiting Sign And 3 Route/Direction Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Afton Road, Freshwater, Isle Of Wight
26 November — 28 November
Delays unlikely No carriageway incursion
Works location: Adj Sand Pipers Hotel, Afton Road
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 2 Poly Ducts In Verge
Responsibility for works: BT
Current status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
25 November — 27 November
Delays unlikely No carriageway incursion
Works location: In F/W Os 147, School Green Road
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 3 Poly Ducts In Footway
Responsibility for works: BT

Current status: Advanced planning
A3055 Tennyson Road, Freshwater, Isle Of Wight
26 November — 28 November
Delays unlikely No carriageway incursion
Works location: 40m West From Jcn High Street, Tennyson Road
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 3 Poly Ducts In Footway
Responsibility for works: BT
Current status: Advanced planning

Arundel Close, Ryde, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Ryde: Whole Length Of Road From Arundel Road (Ml 360655): Arundel Close-Ryde:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr:Bit Partrecon) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Ashey Close, Ryde, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Ryde: Whole Length Of Road From Ashey Road (Ml 362453): Ashey Close-Ryde:; Stacey Terrett
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Slurry Fwr: Bit 50% Recon) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bishops Way, Newport, Isle Of Wight
25 November — 08 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From Manners View, North To Dead End (Ml 240173): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 3 Lanterns (N? 3 Columns) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sea Street, Newport, Isle Of Wight
26 November — 09 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From Junction Of Quay Street, South East To High Street (Ml 240284): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 1 Lantern (N? 1 Column) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Cockrams Yard, Newport, Isle Of Wight
26 November — 09 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From South Street, North To Pyle Street (Ml 210079): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 1 Lantern (N? 1 Column) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Downs View Close, Brading, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Brading: Whole Length Of Road Park Road (Ml 360659): Downs View Close-Brading:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Fullrecon Fwr:Bit Fullrecon) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Downs View Road, St Helens, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: St Helens: Link Footway At The End Of Downs View Road (Ml F30712): Downs View Road-St Helens:; Fw Cip Scheme Fw Cip Sche
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon) St Hel
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hearn Street, Newport, Isle Of Wight
26 November — 09 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From Lugley Street, North West To Westminster Lane (Ml 240230 And Ml 240229): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 2 Lanterns (N? 2 Columns) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Salterns, Seaview, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Seaview: Whole Length Of Road From Ryde Road (Ml 341550): High Salterns-Seaview:; Stacey Terrett
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Fullrecon Fwr: Bit Fullrecon)) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Horestone Path, Nettlestone, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Nettlestone: Link Footway Between Gully Road And Horestone Drive (Ml F30412): Horestone Path-Nettlestone:; Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Fullrecon) Nettle
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Lincoln Way, Bembridge, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Bembridge: Link Footway At The End Of Lincoln Way (Ml F30441): Lincoln Way-Bembridge:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Fullrecon) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Orchard Street, Newport, Isle Of Wight
26 November — 09 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From South Street, South, Then West To St James Street Upper (Ml 240231): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 7 Lanterns (N? 4 Columns) 1 No Waiting/Loading Sign, 4 Resident Parking Permit Signs And 3 Warning Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Post Office Lane, Newport, Isle Of Wight
26 November — 09 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From High Street, North To Lugley Street (Ml 240230: :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 1 Lantern (N? 1 Column) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Queens Drive, Brading, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Brading: Whole Length Of Road From Park Road (Ml 361316): Queens Drive-Brading:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr:Bit Fullrecon) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Queens Drive, Brading, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Brading: Link Footway At The End Of Queens Drive, Brading (F30406): Doctors Lane-Brading:; Stacey Terrett
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Fullrecon) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Rectory Close, Wootton, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Wootton: Whole Length Of Road From Rectory Drive (Ml 361409): Rectory Close-Wootton:; Stacey Terrett
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr: Bitpartrecon) Wootto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Rose Close, Brading, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Brading: Whole Length Of Road From St Marys Road (Ml 360061): Rose Close-Brading:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr:Bit Partrecon) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Royal Walk, Ryde, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Ryde: Whole Length Of Road From Marina Avenue (361500): Royal Walk-Ryde:; Stacey Terrett
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr: Bitpartrecon) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ryde Footpath 64, Seaview, Isle Of Wight
26 November — 28 November
Delays unlikely No carriageway incursion
Works location: Opp Sandscape, Ryde Footpath 64
Works description: Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

Sandcroft Avenue, Ryde, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Ryde: Second Left Hand Spur Of Sandcroft Avenue (Ml 360682): Sandcroft Avenue-Ryde:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr:Bit Partrecon) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Southfield Gardens, Ryde, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Ryde: From Number 15 Around Centre Of Block Back To Number 15 (Ml 340592): Southfield Gardens-Ryde:; Fw Cip Scheme Fw Ci
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr:Bit Partrecon) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Swains Road, Bembridge, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Bembridge: 250mtrs South From Swains Lane (Ml 342277): Swains Road-Bembridge:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Trafalgar Lane, Newport, Isle Of Wight
26 November — 09 December
Delays unlikely Traffic control (give & take)
Works location: Newport: From Trafalgar Road, North To Chapel Street (Ml 220081): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install N? 2 Lanterns (N? 1 Column And 1 Wall Bracket) 1 Route/Direction Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Upper Princes Road, Freshwater, Isle Of Wight
25 November — 27 November
Delays unlikely No carriageway incursion
Works location: Jcn Tennyson Road On, Upper Princes Road
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 3 Poly Ducts In Footway,Install 4m Of 3 Poly Ducts In Verge
Responsibility for works: BT
Current status: Advanced planning

Winton Street, Ryde, Isle Of Wight
25 November — 01 December
Delays unlikely Some carriageway incursion
Works location: O/S 12
Works description: Skip (Westridge Skip Hire)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Woodnutt Close, Bembridge, Isle Of Wight
25 November — 27 November
Delays unlikely Traffic control (give & take)
Works location: Bembridge: Whole Length Of Road From Trelawny Way (Ml 363285): Woodnutt Close-Bembridge:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Constrution And Surfacing (Fwl:Bit Partrecon Fwr:Bit Partrecon) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Image: Stew Dean under CC BY 2.0