Road works sign

Roadworks and road closures: 2nd September 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Fairlee Link Road, Newport, Isle Of Wight
02 September — 15 September
Delays likely Traffic control (give & take)
Works location: Newport: From Fairlee Link Tunnel, East To Victoria Road (Ml 210047 And Ml 210048): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 4 Lanterns (No 4 Columns) 1 Warning Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
02 September — 04 September
Delays likely Road closure
Works location: Aprox 90 Meters From Jcn With Mill Road And 25 Meters From Jcn With St Michael Close, Main Road
Works description: Locate And Excavate 2 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

Five Houses Lane, Calbourne, Isle Of Wight
02 September — 04 September
Delays likely Road closure
Works location: Aprox 40 ,55 Meters From Mitewindi,Aprox 113 And 200 Meters From Jcn With Elm Lane, Five Houses Lane
Works description: Locate And Excavate 4 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

West Street, Seaview, Isle Of Wight
03 September — 29 September
Delays likely Road closure
Works location: Seaview: From Rope Walk To High Street (Ml341506): West Street-Seaview:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:U/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H4) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Woodnutt Close, Bembridge, Isle Of Wight
03 September — 03 October
Delays likely Road closure
Works location: Bembridge: From Trelawny Way 72m North (Ml363285): Woodnutt Close-Bembridge:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Horsebridge Hill, Newport, Isle Of Wight
02 September — 04 September
Delays possible Some carriageway incursion
Works location: 84 Horsebridge Hill
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Forest Road, Newport, Isle Of Wight
02 September — 15 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Parkhurst Road, West To End Light (Ml 210039, Ml 210040, Ml 210041, Ml 210042, Ml 210043, Ml 210044 And Ml
Works description: Install No 52 Lanterns ( No 50 Cols) 8 40mph Signs, 1 No Waiting Sign, 2 Route/Direction Signs, 5 Warning Signs, 4 Lit Warning Signs And 1 Lit Vehicle Activation Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
03 September — 05 September
Delays possible Some carriageway incursion
Works location: 53, Sandown Road,Lake,Iow.
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

B3323 Main Road, Shorwell, Isle Of Wight
03 September — 04 September
Delays possible Traffic control (two-way signals)
Works location: Shorwell: Main Road-Shorwell, In Centre Of Carriageway Below Churchyard.: Main Road-Shorwell:; Scheduler Ops Hub
Works description: Idr. . Pot Hole, 720mm X. 340mm X 45mm Deep. Tm= Stop/Go Boards Shorwe
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3326 Monkton Street, Ryde, Isle Of Wight
02 September — 15 September
Delays possible Traffic control (two-way signals)
Works location: Ryde: From The Strand, South To St Johns Road (Ml 320066, Ml 320067, Ml 330245 And Ml 330246): :; Sl Cip Scheme Sl Cip S
Works description: Install No 23 Lanterns (No 17 Columns) 2 Bus Stop Signs, 5 Neighbourhood Watch Signs, 1 Resident/Business Owner Sign, 1 Resident Parking Permit Sign And 4 Warning Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 Medina Avenue, Newport, Isle Of Wight
03 September — 16 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Terrace Road, East, Then South To Shide Road (Ml 210082, Ml 210083, Ml 240140 And Ml 240141): :; Sl Cip Sc
Works description: Install No 28 Lanterns (No 25 Columns) 2 Bus Stops, 1 Neighbourhood Watch Sign, 3 No Waiting Signs, 6 Route/Direction Signs, 5 Warning Signs, 1 Cctv Related Sign And 1 Traffic Sign Head Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Sandown Road, Bembridge, Isle Of Wight
03 September — 04 September
Delays possible Traffic control (two-way signals)
Works location: Bembridge: On The W/B C/Way Just Past The Entrance To Bembridge A Farm Opposite The Propeller Inn: Sandown Road-Bembridg
Works description: Idr – Loose Gully Cover Frame Needs Resetting Tm – Two Way Temp Lights Or Stop And Go Boards On 40mph Road (Gl: Ironwork Rocking/Corrosion) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Whitwell, Isle Of Wight
02 September — 05 September
Delays possible Traffic control (multi-way signals)
Works location: High Street, Between Kemming Road And Bannock Road
Works description: Access To Overhead Network – Cabling To Restore Customer Service
Responsibility for works: BT
Current status: Advanced planning

Dodnor Lane, Newport, Isle Of Wight
03 September — 05 September
Delays possible Lane closure
Works location: Newport: From Medina Way, North To Junction Of Monks Brook (Ml 210012, Ml 240175, Ml 240176, Ml 240177, Ml 241177 And Ml
Works description: Install No 28 Lanterns (No 18 Columns) 3 Bus/Tram/Cycle Facilities, 1 Cctv Sign, 3 Route/Direction Signs And 2 Warning Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Stew Dean under CC BY 2.0