OK … so we’ve heard about the Ventnor Super Loo demolition costs (£25,017) and have accounted for most of the costs of the shell of the building (Substructure – £14,629; External walls – £8,309; Internal walls – £2,617; Structural steelwork – £20,211; Drainage – £7,337)
How much of the £315,197 that the Super Loos cost were spent on …
Roof
Doors
Windows (not sure if that includes the stained glass, Artwork is a separate item)
Hint: We were surprised, but don’t get too carried away, they aren’t gold plated (thx
Seb).
What do you reckon? Guess these ones separately, it’ll be more fun.