Road works sign

Road closures and road works: 19th September 2013

Isle of Wight Roadworks 19th September 2013

B3330 Eddington Road, Seaview
20 September — 20 September
Delays likely Road closure
Works location: Seaview: From Access Road To Eddington Road Houses, Heading South For 310m Until Second Sharp Bend
Works description: Carriageway Reconstruction, Surfacing And Planing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Winford Road, Newchurch
19 September — 19 September
Delays likely Road closure
Works location: Outside Fairview Winford Road Newchurch
Works description: Replacement Of Telegraph Pole To Restore Customer Service
Responsibility for works: BT

Medeway, Lake
19 September — 19 September
Delays likely Road closure
Works location: Lake: From Lake Green Road 100m East (Ml441409): Medeway-Lake
Works description: Carriageway Reconstruction, Planing And Resurfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020 Main Road, Rookley
20 September — 23 September
Delays possible Traffic control (Stop/Go boards)
Works location: Rookley: Main Road Rookley On The North Bound Carriageway 30metres South Of The Junction With Highwood Lane: Main Road
Works description: Idr Pot Hole
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Forest Road, Newport
19 September — 20 September
Delays possible Traffic control (two-way signals)
Works location: Newport: Eastbound Carriageway, Opposite Public Footpath N47 And Lamp Column 36 2 Way Traffic Lights Required:
Works description: Rebed X2 C/Way Gullies That Have Temporarily Been Made Safe With Cold-Lay
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Marlborough Road, Ryde
20 September — 23 September
Delays possible
Works location: Ryde: O/S Northway: Marlborough Road-Ryde
Works description: Repair Pothole
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Broadwood Lane, Newport
19 September — 23 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Gunville Road Heading West To Dead End Past Forest Hills (Ml 240238): Broadwood Lane-Newport
Works description: Carriageway Resurfacing, Gripfibre Treatment On Carriageway
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Appleford Road, Chale
20 September — 23 September
Delays possible Traffic control (Stop/Go boards)
Works location: Chale: 25m From And Opp Jct Town Lane Near Culvert. (Godshill Direction).: Appleford Road-Chale
Works description: Saw Cut Pothole Repair
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Ventnor Road, Newchurch
19 September — 20 September
Delays possible Traffic control (two-way signals)
Works location: Newchurch: The Stretch Of Highway Outside Number 9 And Number 7: Ventnor Road – Newchurch
Works description: Excavate To Produce 40mm On Dropped Kerb
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Cross Street, Oakfield, Ryde
19 September — 20 September
Delays possible Traffic control (two-way signals)
Works location: Ryde: O/S No.33 Cross Street On Corner With Slade Road: Cross Street-Ryde
Works description: Pothole
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Hinton Road, Newport
19 September — 23 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Wellington Road Heading North East Past Wolfe Close And Malborough Road To Dead End (Ml 240251 And 240252)
Works description: Raising Ironwork – Carriageway Resurfacing, Gripfibre Treatment On Concrete Road, Concrete Defect Repair Where Necessary.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Perowne Way, Sandown
19 September — 23 September
Delays possible Traffic control (two-way signals)
Works location: Sandown: From Central Way Heading South For 200m (Ml 430366): Perowne Way-Sandown
Works description: Raising Ironwork – Carriageway Resurfacing, Gripfibre Treatment On Concrete Road, Concrete Defect Repair Where Necessary.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Quarr Close, Binstead
19 September — 23 September
Delays possible Traffic control (two-way signals)
Works location: Binstead: From Quarr Road Heading South To Dead End (Ml 340603): Quarr Close-Binstead
Works description: Raising Of Ironwork – Carriageway Resurfacing, Gripfibre Treatment On Concrete Road, Concrete Defect Repair Where Necessary.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Quarr Place, Binstead
19 September — 23 September
Delays possible Traffic control (two-way signals)
Works location: Binstead: From Quarr Close Heading East Dead End (Ml 340603): Quarr Place-Binstead
Works description: Raising Of Ironwork – Carriageway Resurfacing, Gripfibre Treatment On Concrete Road, Concrete Defect Repair Where Neccessary.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Image: Stew Dean under CC BY 2.0