road works

Isle of Wight roadworks and road closures 10th February 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Binstead Road, Ryde, Isle Of Wight
10 February — 12 February
Delays likely Traffic control (two-way signals)
Works location: Ryde: S/E O/S Gwdyr House, J/O Gwdyr Close: Binstead Road-Ryde
Works description: 28 Day Perm Required Sawcut And Infill Idr Carriageway Repairs, Made Safe X2 P/Hs With Viafix (X1 Around Triple Cover) 0.35mx0.25mx85mm 0.4mx0.3mx65mm 28 Day Perm Reinstate Req Patch Defects 0.6mx0.4m 2m2 Around Triple Cover Tm Multi Way Lights Req (Cw: Pothole) H1 Urban Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
10 February — 12 February
Delays likely Traffic control (Stop/Go boards)
Works location: Newport: From Junction With Halberry Lane To Southern Water Depot Access Road, Ml 210051: Fairlee Road-Newport
Works description: #3 Major Drainage Scheme. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Broadway, Sandown, Isle Of Wight
10 February — 12 February
Delays likely Traffic control (two-way signals)
Works location: Sandown: From Beachfield Road To Melville Street (Ml410046) Ch 40, 160, 200 & 240: Broadway-Sandown
Works description: Coring & Trial Pits Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Atherfield, Shorwell, Isle Of Wight
10 February — 12 February
Delays possible Traffic control (two-way signals)
Works location: Shorwell: On The W/B C/Way Appx 400m Before The Z Bend: Military Road-Shorwell
Works description: Sawcut And Infill Idr – P/H At Edge Of C/Way .60 X .30 X 40mm Patch Req’D To Include Old Repair And Crazing 2.5 X .80 X 50/100mm Tm – Stop & Go Boards On Nat Speed Limit Road (Cw: Pothole) H3 Rural Shorwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Brighstone, Isle Of Wight
10 February — 12 February
Delays possible Traffic control (two-way signals)
Works location: Brighstone: Appx 200m Before The Coastguard Cottages Turning On The E/B C/Way: Military Road-Brighstone
Works description: Sawcut And Infill Idr – Edge Of Previous Patch Repair Failing New Patch Req’D To Include Crazing Either Side Of Existing Repair 3.2 X 1.0 X 50/100mm Tm – Road Closure (Near Centreline On Nat Speed Limit Road (Cw: Pothole) H3 Rural Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Chale, Isle Of Wight
10 February — 12 February
Delays possible Traffic control (two-way signals)
Works location: Chale: O/S Walpan Farm House Next To Public Footpath Sign C19 On The E/B C/Way: Military Road-Chale
Works description: 28 Day Perm Required Sawcut And Infill Idr – P/H And Crazing Patch Req’D 3.2 X 1.3 X 50/100mm Tm – Stop & Go Boards On Nat Speed Limit Road (Cw: Pothole) Please Close, Further Works May Be Required To Reinstate Broken White Line At Edge Of C/Way – 1.0 X 100mm Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
10 February — 16 February
Delays possible Some carriageway incursion
Works location: O/S 223
Works description: Scaffold App. 223 Carisbrooke Road, 10/02-16/02
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 High Street, Carisbrooke, Isle Of Wight
11 February — 17 February
Delays possible Some carriageway incursion
Works location: O/S 54b Carisbrooke High Street
Works description: 54b Carisbrook High Street, Scaffold Application – 11/02/2016 – 17/02/2016
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bedbury Lane, Freshwater, Isle Of Wight
11 February — 20 February
Delays possible Traffic control (two-way signals)
Works location: Freshwater: From Victoria Road 410m Northwest (Ml 630207): Bedbury Lane-Freshwater
Works description: Installation Of Concrete Drainage Channel To Allow For Resurfacing Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Whiterails Road, Newport, Isle Of Wight
10 February — 12 February
Delays possible Traffic control (two-way signals)
Works location: Newport: Bus Stop Next To Mini Roundabout, Ml320169: Whiterails Road-Newport
Works description: Post Works Following Carriageway Resurfacing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Halletts Shute, Yarmouth, Isle Of Wight
10 February — 17 February
Delays unlikely Some carriageway incursion
Works location: Os Norton Cottage
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

A3054 Hill Lane, Freshwater, Isle Of Wight
10 February — 12 February
Delays unlikely Some carriageway incursion
Works location: In Grounds Of Hill Farm Stables, On, Hill Lane
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 3m Of 1 Way Poly Duct In Carriageway,Install 3m Of 1 Way Poly Duct In Footway,Install 72m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

A3054 Union Street, Ryde, Isle Of Wight
10 February — 12 February
Delays unlikely Some carriageway incursion
Works location: Ryde: At The Junction Of Cross Street & Union Street (Ml 310028):
Works description: Install N� 2 Lanterns (N� 1 Column) 1 Cctv Camera & 2 Route/Direction Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: Park Area Eastern End Of Esplanade/The Strand To Cornwall Street,Ryde
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Canteen Road, Newchurch, Isle Of Wight
10 February — 11 February
Delays unlikely Some carriageway incursion
Works location: O/S Elm Cottage Canteen Road Whiteley Bank Ventnor Iow
Works description: Shanklin – Pcp17 – 317989 – Bduk – Remedial Works To Rectify Ha Defect In Verge
Responsibility for works: BT
Current status: Advanced planning

Elm Lane, Calbourne, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: O/S Calbourne Garage, Elm Lane
Works description: Install 2m Of 1 Way Poly Duct In Carriageway,Install 5m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Priory Road, Carisbrooke, Isle Of Wight
10 February — 12 February
Delays unlikely No carriageway incursion
Works location: S/O 72 High Street To Opp 2, Priory Road
Works description: Install 25m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Ashey Road, Ryde, Isle Of Wight
11 February — 24 February
Delays unlikely Some carriageway incursion
Works location: Smallbrook Stadium, Ashey Road , Ryde, Islel Of Wight.
Works description: – Install Washout Hydrant Off 450mm Water Main In Verge.
Responsibility for works: Southern Water
Current status: Advanced planning

High Street, Oakfield, Ryde, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: From Jcn Of Oak Dale And Cross Street Across Cw To O/S 42 , High Street
Works description: Install 10m Of 1 Way Poly Duct In Footway,Install 8m Of 1 Way Poly Duct In Carriageway,Provide 3 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Cross Street, Oakfield, Ryde, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: From O/S 2e Cross Street To Jcn Of Oak Dale Cross Street
Works description: Install 21m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Esplanade, Ventnor, Isle Of Wight
10 February — 12 February
Delays unlikely Some carriageway incursion
Works location: Ventnor: All Along Road.:
Works description: 6 Core Drills Equal Distance Along Road. Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hefford Road, East Cowes, Isle Of Wight
11 February — 15 February
Delays unlikely No carriageway incursion
Works location: O/S 2 Hendy Rd To O/S 28 In , Hefford Road
Works description: Build 1 Precast Jointing Chamber (725mm X 225mm) 600mm Dep,Install 14m Of 1 Way Poly Duct In Footway,Install 7m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Newport Street, Ryde, Isle Of Wight
10 February — 18 February
Delays unlikely Some carriageway incursion
Works location: R/O 33 John Street
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Nightingale Road, Newport, Isle Of Wight
11 February — 12 February
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road From Junction With Purdy Road, 234m, Ml 240250: Nightingale Road-Newport
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Royal Exchange, Newport, Isle Of Wight
10 February — 16 February
Delays unlikely Some carriageway incursion
Works location: O/S Ozzie’S Chip Shop
Works description: Scaffold App. Ozzies Chip Shop, Royal Exchange – 10/02-17/02
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Shore Road, Ventnor, Isle Of Wight
10 February — 12 February
Delays unlikely Traffic control (give & take)
Works location: Ventnor: From Bonchurch Village Road, South To Bonchurch Shore (Ml 540181 And Ml 540182): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 7 Lanterns (No 6 Columns) 1 Neighbourhood Watch Sign, 1 Warning Sign And 1 No Waiting Sign Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Solent Hill, Freshwater, Isle Of Wight
11 February — 15 February
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Main Road, 136m, Ml 640547: Solent Hill-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Fullrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Marys Road, Cowes, Isle Of Wight
10 February — 12 February
Delays unlikely Traffic control (give & take)
Works location: Cowes: Short Spur On Right Hand Side Before Denmark Rd, 15m Long, Ml 160355: St Marys Road-Cowes
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Fullrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Standen Avenue, Newport, Isle Of Wight
10 February — 12 February
Delays unlikely Traffic control (give & take)
Works location: Newport: From Forest Road, North To Column 12 (Ml 240375): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 9 Lanterns ( No 9 Col’S) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sylvan Drive, Newport, Isle Of Wight
10 February — 12 February
Delays unlikely No carriageway incursion
Works location: Adj To Sycamore Gardens Jcn, Sylvan Drive
Works description: Install 7m Of 1 Way Poly Duct In Footway,Provide 3 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

West Street, Ventnor, Isle Of Wight
10 February — 16 February
Delays unlikely Some carriageway incursion
Works location: Scaff. App. 25 West Street, Ventnor – 10/02 – 16/02
Works description: –
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Withybed Close, Carisbrooke, Isle Of Wight
10 February — 23 February
Delays unlikely Traffic control (give & take)
Works location: In Footway From O/S 8 Withybed Close To O/S 9 Withybed Close
Works description: Excavation Of Joint Bay In Footway For New Electrical Connection To New Property Adj 12 Withybed Close
Responsibility for works: Southern Electric
Current status: Advanced planning

Image: Craig Sunter under CC BY 2.0