A3055 Bonchurch Road, Shanklin, Isle Of Wight
10 June — 12 June Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – Patches Of Delamination Near The Centre Line Appx 1.4 X .50 X 40mm 4 X Appx Between .60 And .90 X .30/40 X 35/40mm Tm – Two Way Temp Lights On Nat Speed Limit Road (Cw: Pothole) Shanklin at Shanklin: On Either Side Of The Turning Down To Luccombe Farm Cottages On And Either Side Of The Centreline: Bonchurch R
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Arundel Road Heading North To Appley Road (Ml 310054): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Salisbury Road Heading North To Somerset Road (Ml 310052): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Somerset Road Heading North To Arundel Road (Ml 310053): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
11 June — 11 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Great Preston Road Heading North To Salisbury Road (Ml 310051): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
11 June — 15 June Road closure
Delays likely due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct. at In Fw Opp 50, High Street
Responsibility: BT
EToN status: Advanced planning

A3055 Rowborough Lane, Brading, Isle Of Wight
10 June — 11 June Some carriageway incursion
Delays possible due to Streetworks
Minor Remedial To Rectify Ha Defect In Carriageway at Section 81/Cch Ref 1613373 In C/W O/S Rowborough Farm Cottage On , Rowborough Lane
Responsibility: BT
EToN status: Advanced planning

B3399 Chale Street, Chale, Isle Of Wight
10 June — 10 June Traffic control (two-way signals)
Delays possible due to Streetworks
Access To Repalce Damaged Pole. Currently Safe But Requires To Be Replaced. 2 Way Lights Off Peak And Manually Controlled All Times at Chale Street Opp Amberley And Wayside Calbourne Po38 2hg
Responsibility: BT
EToN status: Advanced planning

Chatfeild Road, Niton, Isle Of Wight
10 June — 12 June Traffic control (two-way signals)
Delays possible due to Streetworks
Idr – Infill 2 X Pieces Of Delamination 1.0 X .50 X 35mm 7.0 X 2.0 X 35mm Patch Req’D Spreads Over The Whole Width Of The W/B Side Of The C/Way Tm – Two Way Temp Lights (Cw: Pothole) Niton at Niton: On The W/B C/Way Appx 50 To 100m Past The National Speed Limit Sign On Leaving Whitwell: Chatfeild Road-Niton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Rectory Road, Niton, Isle Of Wight
10 June — 12 June Traffic control (two-way signals)
Delays possible due to Streetworks
Repairs Required To Floating Footway. Includes And One Drainage Outlet Pipe. (Kerb: Knocked Out/Replace/Miss) Niton at Niton: Os Nutkins: Rectory Road-Niton
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054/B3330 High Street, Ryde, Isle Of Wight
10 June — 12 June No carriageway incursion
Delays unlikely due to Streetworks
Install 7m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at O/S 15/17, High Street
Responsibility: BT
EToN status: Advanced planning

A3054 Lind Street, Ryde, Isle Of Wight
10 June — 23 June Some carriageway incursion
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway And Road Crossing To Provide New Electrical Supply To New Hotel In Lind Hill. Backfill And Reinstate. at From O/S St James Church To Jct St Thomas Street
Responsibility: Southern Electric
EToN status: Advanced planning

A3055 High Street, Freshwater, Isle Of Wight
10 June — 17 June Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 42102 at Os Hollywood
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
11 June — 12 June Some carriageway incursion
Delays unlikely due to Streetworks
Reinstatement To Be Carried Out On Interim Site at (Pcp9) Rear Of 1 To 14 Brookelands Queens Road On , School Green Road
Responsibility: BT
EToN status: Advanced planning

B3321 Adelaide Grove, East Cowes, Isle Of Wight
11 June — 19 June Some carriageway incursion
Delays unlikely due to Streetworks
Lay New Service From Nearside Footway To Site at Os 78
Responsibility: Southern Gas Networks Plc
EToN status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
10 June — 12 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at Fat Harrys 53, High St, Sandown
Responsibility: Southern Water
EToN status: Advanced planning

B3395 Steyne Road, Bembridge, Isle Of Wight
11 June — 12 June No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Rectify Ha Defect In Fw. at (Pcp8) 464617,087608 464630,087621 Outside 33a To Outside 33, Steyne Road
Responsibility: BT
EToN status: Advanced planning

Bembridge Footpath 32, Bembridge, Isle Of Wight
10 June — 11 June No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Rectify Ha Defect In Fw. at (Pcp6) 464282,088670 Junction Embankment Road On, Bembridge Footpath 32
Responsibility: BT
EToN status: Advanced planning

Brookfield Gardens, Ryde, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Bit Slurrypatch Fwr: Bit Partrecon) Ryde at Ryde: First R/H Section Of Brookfield Gardens (Ml 340487b): Brookfield Gardens-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Main Road, Alverstone, Isle Of Wight
10 June — 11 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Work On Ha Defect. at (Pcp6) 457770,85557457764,85565 Opposite Station House Across Carriageway To Outside Station House
Responsibility: BT
EToN status: Advanced planning

Solent View Road, Gurnard, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
-Remdial Reinstatement On Sucken Patch at 21, Solent View Rd, Cowes
Responsibility: Southern Water
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install 4m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Verge,Install 8m Of 1 Way Poly Duct In Carriageway at O/S 49, Across C/W, To Cnr Of 50, Worsley Road
Responsibility: BT
EToN status: Advanced planning

Cherrytree Road, Nettlestone, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Nettlestone at Nettlestone: From Orchard Road To Caws Avenue (Ml 342456): Cherrytree Road-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Cliff Path, Lake, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 13 Lanterns (N? 13 Columns) 1 Neighbourhood Watch Sign, 1 No Ball Games Sign, 1 Route/Direction Sign & 2 Warning Signs Lake at Lake: From Cliff Road, South To End Column (Ml 440196 & Ml 440218):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Cliff Road, Lake, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) Lake at Lake: On Path Leading To The Beach (Ml 440196):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Crescent Road, Shanklin, Isle Of Wight
11 June — 15 June No carriageway incursion
Delays unlikely due to Streetworks
Excavate 1 Location (S) To Expose/ Repair Existing Ducts In Footway,Install 1m Of 1 Way Poly Duct In Footway at O/S Samantha Court, Crescent Road
Responsibility: BT
EToN status: Advanced planning

Elm Close, Ryde, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 15, Elm Cl, Ryde
Responsibility: Southern Water
EToN status: Advanced planning

Firestone Copse Road, Wootton, Isle Of Wight
10 June — 10 June Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Rectifiy Ha Defect In Cw at Opp Jcn Havenstreet Main Rd On, Firestone Copse Road
Responsibility: BT
EToN status: Advanced planning

Greenway Close, Binstead, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead at Binstead: Whole Length Of Road From Greenway (Ml 361534): Greenway Close-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Greenway, Binstead, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Binstead at Binstead: From The Mall To Verwood Drive (Ml 340534): Greenway-Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Hyde Road, Shanklin, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 24, Hyde Rd, Shanklin, Po377le
Responsibility: Southern Water
EToN status: Advanced planning

Lind Hill, Ryde, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Cable Trench In Footway To Provide New Electrical Supply To New Hotel In Lind Hill. Backfill And Reinstate. at From Jct Lind Street To End Of Lind Hill
Responsibility: Southern Electric
EToN status: Advanced planning

Lower Green Road, St Helens, Isle Of Wight
10 June — 11 June Some carriageway incursion
Delays unlikely due to Streetworks
Minor Remedial To Rectify Ha Defect. at (Pcp7) 462895,089009 Opposite Weymouth Cottage , Lower Green Road
Responsibility: BT
EToN status: Advanced planning

Luccombe Road, Shanklin, Isle Of Wight
10 June — 11 June No carriageway incursion
Delays unlikely due to Streetworks
Minor Remedial To Rectify Ha Defect In Soft at 170m South From The Priory, Luccombe Road
Responsibility: BT
EToN status: Advanced planning

New Road, Lake, Isle Of Wight
10 June — 23 June Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 2 Columns) 1 Warning Sign Lake at Lake: From New Road, South Into Carpark (Ml 440414):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Orchard Road, Nettlestone, Isle Of Wight
11 June — 15 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Nettlestone at Nettlestone: From The Glade To Cedarwood Drive (Ml 340455): Orchard Road-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Perowne Way, Sandown, Isle Of Wight
11 June — 12 June No carriageway incursion
Delays unlikely due to Streetworks
Minor Remedial To Rectify Ha Defect. at (Pcp23) 459394,084842 Opposite 87a, Perowne Way
Responsibility: BT
EToN status: Advanced planning

Sherbourne Avenue, Ryde, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
-Interim To Perm Reinstatement at 15, Sherbourne Ave, Ryde
Responsibility: Southern Water
EToN status: Advanced planning

St Johns Road, Sandown, Isle Of Wight
11 June — 18 June Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Mr Skippy) at O/S 40
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Westfield Park, Ryde, Isle Of Wight
10 June — 12 June Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwr: Bit Partrecon) Ryde at Ryde: Bottom R/H Section Of Westfield Park (Ml 360632a): Westfield Park-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Wilkes Road, Sandown, Isle Of Wight
11 June — 15 June Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Service at 3 Wilkes Road , Sandown, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Image: Ell R Brown under CC BY 2.0