Roadworks signs

Isle of Wight roadworks and road closures 2 March 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org.

Merryl Lane will be closed on one day between Wednesday 2 March and Friday 4 March 2016, from 9am until 4pm, between Whitwell Road and Sheepwash Lane. The road closure is for carriageway repair works by Island Roads. The route for diverted traffic will be: Whitwell Road and Sheepwash Lane. For further details about these works please contact Island Roads on 01983 822440
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Victoria Avenue (cul-de-sac section will be closed from 9am on Wednesday 2 March 2016 until 4pm on Friday 4 March 2016 between Hungerberry Close and the end of the surfaced highway 200 metres to the west. Vehicular access to premises will be restricted when necessary between 9am and on each day during the closure. The road closure is to reline 50 metres of sewer by P Fitzsimmons Dyno Rod. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN WATER ON 0845 278 0845.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Alum Bay New Road will be closed from 0630hrs until 1800hrs on approximately 5 days starting on approx. Wednesday 3 March 2016. The closure is from York Road to Cliff Road for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. The route for diverted traffic will be: A3055 School Green Road, Tennyson Road and The Avenue, A3054 Colwell Road and Hill Lane, Pixley Hill and Copse Lane.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3020 Blackwater Road, Newport, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Newport: N/B C/W J/O Blackwater Hollow: Blackwater Road-Newport
Works description: 28 Day Perm Required Sawcut And Infill Carriageway Repairs, X2 P/Hs – Made Safe With Cold Lay 0.35mx0.25mx40mm 0.3mx0.2mx40mm Tm Three Way Lights Req (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Newport: Outside Scats (Ml 410016): O/S Scats Refuge
Works description: Replacement Of N� 1 Refuge Pole Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Cowes, Isle Of Wight
03 March — 03 May
Delays likely Road closure
Works location: Cowes: Ml 110006 From The Junction Of Mill Hill Road To The Junction Of Smithhards Lane: Newport Road-Cowes (Locally Kno
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Seal:U/H1 Resurface 30mm Ul-M 65spv With Armour Screed Crack Repair And Proscreed Cut And Seal Joints-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Cowes, Isle Of Wight
03 March — 03 May
Delays likely Road closure
Works location: Cowes: Ml 110007 From The Junction Of Smithards Lane To The Junction Of Belleview Road: Newport Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inaly/Unkerbed=Overlay)-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Cowes, Isle Of Wight
03 March — 03 May
Delays likely Road closure
Works location: Cowes: Ml 110005 From The Juction Of Three Gates Road To The Junction Of Mill Hill Road: Newport Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 St Georges Way, Newport, Isle Of Wight
02 March — 02 March
Delays likely Traffic control (priority working)
Works location: Newport: Mn 210001/2 From St Georges Way Roundabout To Shide Road: St Georges Way-Newport
Works description: Six Road Core Excavations Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 St Georges Way, Newport, Isle Of Wight
02 March — 04 March
Delays likely Lane closure
Works location: Newport: 15m Past The Bridge To Cineworld At The Side Of The Cowes Lane: St Georges Way-Newport
Works description: Idr – Gully Cover Has Sunk And Is Breaking Out Rebed To Level Tm – Lane Closure (Cw: Irnwk Not Exceed +Or- 20mm) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 St Georges Way, Newport, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Newport: Outside Newport Football (Ml 210002): Illuminated Ref Pole
Works description: Replacement Of N� 1 Refuge Pole Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
02 March — 04 March
Delays likely Road closure
Works location: 48 Victoria Avenue, Shanklin
Works description: – No Dig, Access Required To Manholes In Carriageway To Reline Sewer
Responsibility for works: Southern Water
Current status: Advanced planning

A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (multi-way signals)
Works location: East Cowes: Barton Manor Roundabout, Facing Approach From Saunders Way: Whippingham Road-East Cowes
Works description: Reset 2no Dislodged Sign Posts. Replace 2no Damaged ‘Chevron’ Signs 1.8m X 0.6m. (Sg: Sign Missing) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
03 March — 16 March
Delays likely Traffic control (two-way signals)
Works location: Newport: From Fairlee Road Garage To Cross Lane, 290m, Ml 210049: Fairlee Road-Newport
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 East Hill Road, Ryde, Isle Of Wight
03 March — 03 May
Delays likely Road closure
Works location: Ryde: From Alexandra Road To 200 Metres North Thereof (Ml310056) : East Hill Road-Ryde:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H1, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
03 March — 07 March
Delays likely Traffic control (multi-way signals)
Works location: Ryde: On Island Opposite The School (Ml 310054): On Island Ref Pole
Works description: Replacement Of N� 1 Refuge Pole Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Hale Common, Arreton, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Arreton: O/S Holiers Farm: Hale Common-Arreton
Works description: Please Dig Out/ Clear Ditch (Gl: Drainage Structre Blockage) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Argyll Street, Ryde, Isle Of Wight
03 March — 03 May
Delays likely Road closure
Works location: Ryde: From Pellhurst Road 250m East (Ml 310542): Argyll Street-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65 Psv Plus Regulating) Kerbed=Inlay/Unkerbed=Overlay-Urban:H1) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Argyll Street, Ryde, Isle Of Wight
03 March — 03 May
Delays likely Road closure
Works location: Ryde: From West Street 250m West (Ml310543): Argyll Street-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330/A3055 Appley Road, Ryde, Isle Of Wight
03 March — 07 March
Delays likely Traffic control (multi-way signals)
Works location: Ryde: Outside St Johns Lodge (Ml 310055): O/S School Exit Ref Pole
Works description: Replacement Of N� 1 Refuge Pole Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330 Nettlestone Green, Nettlestone, Isle Of Wight
03 March — 03 May
Delays likely Road closure
Works location: Nettlestone: From Caws Avenue To Elm Close (Ml330082): Nettlestone Green-Nettlestone
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 High Street, Carisbrooke, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (Stop/Go boards)
Works location: Opp 21, High Street.
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway.
Responsibility for works: BT
Current status: Advanced planning

Merryl Lane, Godshill, Isle Of Wight
02 March — 04 March
Delays likely Road closure
Works location: Godshill: Whole Length Of Road.:
Works description: C/W Defects X 24 Potholes, 28 Day Perm Repair Req. .70 X .60 X 45mm X 5 P/H,S, .45 X .45 X 35mm. .65 X .50 X 40mm X 3 P/H,S .85 X .60 X 50mm .50 X .50 X 45mm X 8 P/H,S .35 X .30 X 35mm X 6 P/H,S Tm- Ds Advices Road Closure. (Cw: Pothole) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Shanklin Road, Godshill, Isle Of Wight
03 March — 07 March
Delays possible Traffic control (Stop/Go boards)
Works location: 110m West Of Junction Of Sandford Farm , Shanklin Road
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

B3323 South Street, Newport, Isle Of Wight
02 March — 03 March
Delays possible Some carriageway incursion
Works location: Approx 30mtrs East Of Fire Station
Works description: Install Sewer Monitoring Equipment Within The Manhole
Responsibility for works: Southern Water
Current status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
03 March — 07 March
Delays possible Traffic control (Stop/Go boards)
Works location: 466m East Of Junc Of Dodpits Lane On, Freshwater Road.
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway.
Responsibility for works: BT
Current status: Advanced planning

Binstead Lodge Road, Binstead, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (multi-way signals)
Works location: Binstead: 115 Binstead Lodge Road : Binstead Lodge Road-Binstead – 1189
Works description: Gully Defect Works “Jetting Pipe 12m, Hit Clay In Garden, Mark On Site” Rod Guly Pipework If Possible, Otherwise Excavate/ Investigate And Remove Clay Blockage. (Gl: Drainage Structure Leakage) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Kennel Lane, Chale, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (two-way signals)
Works location: Chale: On The Chale Bound Side Of The C/Way Appx 150m Before Ashbridge Lane: Kennel Lane-Chale
Works description: Idr – Edge Of C/Way Erosion 15.0 X .50 X 50/100mm Tm – Two Way Temp Lights (Cw: Pothole) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Brading Down Road, Brading, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (multi-way signals)
Works location: Brading: J/O Ashey Road: Brading Down Road-Brading
Works description: 28 Day Perm Required Sawcut And Infill Carriageway Pothole Approx 500mm Dia X 80mm Deep (Cw: Pothole) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Grange Road, Brighstone, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (multi-way signals)
Works location: Brighstone: 10m To 40m In From The Jnc With Military Road: Grange Road-Brighstone
Works description: Sawcut And Infill Idr – P/H’S X 4 .40 X .20 X 30mm .90 X .70 X 40mm Patch Req’D 1.1 X 1.1 X 50/100mm .90 X .50 X 60mm Patch Req’D 1.1 X 1.0 X 50/100mm .40 X .20 X 40mm Tm – Two Way Temp Lights (Cw: Pothole) H3 Rural Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Colwell Road, Freshwater, Isle Of Wight
03 March — 09 March
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Colwell Lane To Junction With The Avenue, 230m, Ml 620002: Colwell Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Ningwood Hill, Shalfleet, Isle Of Wight
02 March — 04 March
Delays unlikely No carriageway incursion
Works location: O/S The Retreat, Ningwood Hill,
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

A3055 High Street, Shanklin, Isle Of Wight
03 March — 07 March
Delays unlikely No carriageway incursion
Works location: Opp 83, High Street.
Works description: Install 4m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Ashley Path, Brighstone, Isle Of Wight
02 March — 04 March
Delays unlikely Traffic control (give & take)
Works location: Brighstone: Footway Link Off Ashley Way, Ml F60616: Ashley Path-Brighstone
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 Castle Road, Newport, Isle Of Wight
02 March — 04 March
Delays unlikely Traffic control (give & take)
Works location: Newport: From The Junction Of Cedar Hill & Castle Road, North East To Junction With Carisbrooke Road (Ml 240088 & Ml 240
Works description: Replacement Of N� 7 Signs (1 X Roundabout, 2 X No Entry, 2 X Width Restriction & 2 X Give Way) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
02 March — 02 March
Delays unlikely Traffic control (priority working)
Works location: Newport: Ml 220092/3/4 From The Junction With Manner Farm Through To Betty Haunt Lane: Calbourne Road-Newport
Works description: Nine Road Core Excavations Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Shute, Newchurch, Isle Of Wight
03 March — 15 March
Delays unlikely Traffic control (give & take)
Works location: Newchurch: Ml 430126 From Bartletts Garage To A Point 198 Metres South: The Shute-Newchurch
Works description: Surfacing Preparatory Works. Kerbing And Access Works Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Spring Hill, Ventnor, Isle Of Wight
03 March — 11 March
Delays unlikely Traffic control (give & take)
Works location: Ventnor: Whole Length Of Road From High Street To St Boniface Road, 273m, Ml 530152: Spring Hill-Ventnor
Works description: Footway Reconstruction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit 50% Partrecon) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Town Lane, Newport, Isle Of Wight
02 March — 08 March
Delays unlikely Some carriageway incursion
Works location: Savoy Court
Works description: Scaff. App. Savoy Court, Town Lane, 02/03 – 08/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
02 March — 04 March
Delays unlikely Some carriageway incursion
Works location: O/S 17 Across C/W To Opp 17, Worsley Road.
Works description: Install 2m Of 1 Way Poly Duct In Footway,Install 3m Of 1 Way Poly Duct In Verge,Install 7m Of 1 Way Poly Duct In Carriageway,Test 12m Of Existing Ducts To Locate Blockages
Responsibility for works: BT
Current status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
02 March — 04 March
Delays unlikely No carriageway incursion
Works location: O/S 41 To O/S 43, Worsley Road
Works description: Install 14m Of 1 Way Poly Duct In Footway,Install 15m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Heatherwood Park Road, Totland, Isle Of Wight
02 March — 03 March
Delays unlikely Traffic control (give & take)
Works location: Totland: From Cliff Road To Church Hill, 202m, Ml 640374: Heatherwood Park Road-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Fairway, Lake, Isle Of Wight
02 March — 04 March
Delays unlikely No carriageway incursion
Works location: Lake: Nearest Ml 430204 By No.46. Off Pn.: The Fairway-Lake – 2807
Works description: Additional Drainage Scheme #140 Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Oatsy40under CC BY 2.0