Road closed sign

Isle of Wight roadworks and road closures 23rd September

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

B3331 Fishbourne Lane, Wootton, Isle of Wight
23 September — 24 September
Delays likely due to Streetworks
Lane closure at B3331 Fishbourne Lane, Wootton, Isle of Wight (Fishbourne Lane) 23 September — 24 September
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
A3020 Coppins Bridge, Newport, Isle Of Wight
23 September — 25 September Traffic control (two-way signals)
Delays likely due to Streetworks
Saw Cut And Infil 500x250x110 P/H Tm Two Lane Closure Newport at Newport: Next To Crossing Point On Copping Bridge, Near Jct Of High Street.: Coppins Bridge-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Broadway, Sandown, Isle Of Wight
24 September — 26 September Traffic control (two-way signals)
Delays likely due to Streetworks
Replacement Of Anti-Skid Surfacing (Post Cip Work). Tm = 2 Way Lights. Sandown at Sandown: From Opp J/O Carter Street, To Point 48m North: Broadway-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Lake Hill, Lake, Isle Of Wight
23 September — 25 September Traffic control (multi-way signals)
Delays likely due to Streetworks
Replacement Of Anti-Skid Surfacing (Post Cip Work). Tm = 4 Way Lights. Lake at Lake: From J/O Denness Road To Railway Bridge, Westbound Carriageway: Lake Hill-Lake
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 York Avenue, East Cowes, Isle Of Wight
24 September — 28 September Some carriageway incursion
Delays possible due to Streetworks
Renew Defective Fire Hyrant Frame And Cover. at Prince Of Wales, York Avenue,East Cowes,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Military Road, Freshwater, Isle Of Wight
23 September — 25 September Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Idr. . Saw Cut & Infill C/W Pot Hole, 500mm X. 350mm X 50mm Deep. Tm= Mobile Works. (Cw: Pothole) Freshwater at Freshwater: Military Road, Freshwater, In Centre Of Carriageway, 60metres East Of Hanover Point Car Park.: Military Road
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Apse Manor Road, Shanklin, Isle Of Wight
24 September — 28 September Traffic control (two-way signals)
Delays possible due to Streetworks
– Install New Water Connection at Land Next To 1, Apse Manor Cottages,Apse Manor Road,Shanklin,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

B3329/A3055 Avenue Road, Sandown, Isle Of Wight
23 September — 07 October Some carriageway incursion
Delays possible due to Streetworks
Skip (Reynolds And Read) at O/S 18
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3401 Sun Hill, Calbourne, Isle Of Wight
23 September — 29 September Traffic control (two-way signals)
Delays possible due to Streetworks
Overlay – Lay Approx 15m Of Duct 54 In Cw/Fw/Verge To Link Existing Bt Boxes To Facilitate Spine Cabling Works. at O/S Four Winds, Sun Hill, Calbourne, Iow Po30 4ja
Responsibility: BT
EToN status: Advanced planning

Long Lane, Newport, Isle Of Wight
24 September — 25 September Traffic control (two-way signals)
Delays possible due to Streetworks
Repairs To Residents Driveways, 3 X Asphalt And 1 X Concrete Newport at Newport: (Ml 420108/9) Outside Four Properties Along Long Lane. Works Will Be Non Concurrent: Long Lane-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Ventnor Road, Whitwell, Isle Of Wight
23 September — 25 September Traffic control (two-way signals)
Delays possible due to Streetworks
Cir 278 – Construction Of Build Out As Per Attached Plan. Install New 114mm 4m Post (2 X Offset Bracket Required) And Fix New Ads Sign (Newport Godshill Straight Ahead / Freshwater Blackgang Niton Left). Whitwell at Whitwell: Just Before J/O Kemming Road:
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

West Street, Godshill, Isle Of Wight
24 September — 07 October Traffic control (multi-way signals)
Delays possible due to Streetworks
Godshill 1 – Street Cabinet & Power Installation. Excavate To Lay Approx 6mbt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 0.4m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at S/O Tree Tops West Street Godshill
Responsibility: BT
EToN status: Advanced planning

Landguard Manor Road, Shanklin, Isle Of Wight
24 September — 26 September Traffic control (two-way signals)
Delays possible due to Streetworks
Replacement Of Anti-Skid Surfacing (Post Cip Work). Tm = 2 Way Lights Shanklin at Shanklin: From J/O Lower Hyde Access Road North, Northbound Carriageway: Landguard Manor Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Landguard Road, Shanklin, Isle Of Wight
24 September — 26 September Traffic control (two-way signals)
Delays possible due to Streetworks
Replacement Of Anti-Skid Surfacing (Post Cip Work). Tm = 2 Way Lights Shanklin at Shanklin: From J/O Lower Hyde Access Road South, Northbound Carriageway: Landguard Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Alpine Road, Ventnor, Isle Of Wight
24 September — 28 September Some carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole at O/S Barian 20 Alpine Road, Ventnor, Alpine Road
Responsibility: BT
EToN status: Advanced planning

Rew Street, Gurnard, Isle Of Wight
24 September — 28 September Some carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole at Approx 140m South Of Opp Ent To Hillside Rew Street , Rew Street
Responsibility: BT
EToN status: Advanced planning

Havenstreet Main Road, Havenstreet, Isle Of Wight
24 September — 24 September Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwr: Bit 50% Partrecon) Havenstreet at Havenstreet: From Church Road 200m South (Ml 320196): Havenstreet Main Road-Havenstreet
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Corve Hill, Shorwell, Isle Of Wight
23 September — 25 September Some carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole at Corve Hill, 314m South Of Gladeswood, Corve Hill
Responsibility: BT
EToN status: Advanced planning

Esplanade Road, Ventnor, Isle Of Wight
24 September — 28 September Some carriageway incursion
Delays unlikely due to Streetworks
Provide 1 New Pole at Opp Lobster Lodge, Esplanade Road
Responsibility: BT
EToN status: Advanced planning

Gotten Lane, Chale, Isle Of Wight
23 September — 25 September Some carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole at Gotten Lane, 77m South East From ‘Clarris Thorne’, Gotten Lane
Responsibility: BT
EToN status: Advanced planning

Gotten Lane, Chale, Isle Of Wight
23 September — 25 September Some carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole at Gotten Lane, 140m East Of Little Bramstone Farm, Gotten Lane
Responsibility: BT
EToN status: Advanced planning

School Lane, Newport, Isle Of Wight
23 September — 24 September Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Complete Lines at 450604.06 89357.06, 450612.31 89362.43, O/S Medina Training Centre, School Lane, Newport, Isle Of Wi
Responsibility: BT
EToN status: Advanced planning

St Pauls Avenue, Shanklin, Isle Of Wight
23 September — 14 October Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S St Pauls Church Hall
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Sun Hill, Cowes, Isle Of Wight
23 September — 29 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S 25
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning