Road Closed at Undercliff Drive

Isle of Wight roadworks and road closures 28th November 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

Streetworks / Licence, Streetworks
Carriageway repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: The Strand
Location: at B3326 The Strand, Ryde, Isle of Wight (The Strand)
29 November — 01 December
Diversion route
Name: Diversion
Location: at B3326 The Strand, Ryde, Isle of Wight (Diversion)
29 November — 01 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
Carriageway resurfacing scheme
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Newnham Road
Location: at C58 Newnham Road, Binstead, Isle of Wight (Newnham Road)
28 November — 16 December
Diversion route
Name: Diversion
Location: at C58 Newnham Road, Binstead, Isle of Wight (Diversion)
28 November — 16 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Footbridge repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Footway closure
Name: Public Footpath T4
Location: at Turf Walk, Totland, Isle of Wight (Public Footpath T4)
28 November — 19 December
Road closure
Name: Madeira Road
Location: at Turf Walk, Totland, Isle of Wight (Madeira Road)
28 November — 19 December
Diversion route
Name: Diversion
Location: at Turf Walk, Totland, Isle of Wight (Diversion)
28 November — 19 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Two Way Lights in order to facilitate tree and hedge cutting works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Two-way traffic signals
Name: Old Park Road,St Lawrence
Location: at Old Park Road, Woolverton Road, Ventnor, Isle of Wight (Old Park Road,St Lawrence)
29 November — 29 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Newnham Road, Binstead, Isle Of Wight
28 November — 16 December
Delays likely Road closure
Works location: Binstead: From Junction With Binstead Hill, 299m Towards Havenstreet, Ml 330205: Newnham Road-Binstead
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newnham Road, Binstead, Isle Of Wight
28 November — 16 December
Delays likely Road closure
Works location: Binstead: From Verwood Road, 230m North Towards Binstead Hill, Ml 330204: Newnham Road-Binstead
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Newnham Road, Binstead, Isle Of Wight
28 November — 16 December
Delays likely Road closure
Works location: Binstead: From Junction With Verwood Road To Newnham Lane, 220m, Ml 330203: Newnham Road-Binstead
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway. (Ff-Ul-Mcp:U/H3 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H3) Kerbed=Inlay/Unkerbed=Overlay) Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Madeira Road, Totland, Isle Of Wight
28 November — 19 December
Delays likely Road closure
Works location: Totland: Footbridge Over Medeira Road.: Turf Walk—Totland – Footpath Over Pier Road, Totland
Works description: Replacement Of New Bridge Deck. Repair Work To Peirs And Enbutments. Works To Be Carried Out By Outside Contractor Tbc. Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Morton Road, Brading, Isle Of Wight
28 November — 30 November
Delays likely Traffic control (two-way signals)
Works location: Brading: S/B C/W O/S Property Named The Paddock: Morton Road-Brading
Works description: Carriageway Repairs, X1 Patch Req Due To Depression 1.1mx0.45mx20mm Tm Ds Advices Possible Two Way Lights Req (Cw: Pothole) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

The Strand, Ryde, Isle Of Wight
29 November — 01 December
Delays likely Road closure
Works location: Outside 21 The Strand, Ryde, Po33 1jf
Works description: Replace Manhole Frame And Cover In The Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning

Briddlesford Road, Newport, Isle Of Wight
28 November — 30 November
Delays possible Traffic control (two-way signals)
Works location: Newport: Both Sides Of The C/Way On The ‘S’ Bend Past The Civic Amenity Centre To The North: Briddlesford Road
Works description: Idr – Please Replace 5no. Plastic B/W Hazard Markers Tm – Two Way Temp Lights On Nat Speed Limit Road (H: Street Furnitre Faulty/Dmge) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Fishbourne Lane, Wootton, Isle Of Wight
28 November — 30 November
Delays possible Traffic control (Stop/Go boards)
Works location: Wootton: Whole Length Of Fishbourne Lane: Fishbourne Lane-Wootton
Works description: Carriageway Investigation Works Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Gunville Road, Carisbrooke, Isle Of Wight
28 November — 29 November
Delays possible Traffic control (two-way signals)
Works location: O/S 34 Gunville Road, Newport, I.O.W. Po30 5ld
Works description: Aplant 2 Way Lights To Renew Damaged Pole
Responsibility for works: BT
Current status: Planned work about to start

Military Road, Chale, Isle Of Wight
28 November — 30 November
Delays possible Traffic control (two-way signals)
Works location: Chale: Approx 30m From The White Mouse Entrance On The Chale Bound Side Of The C/Way: Military Road-Chale – 19028
Works description: Idr – Gully Cover Requires Re Setting Tm – Two Way Temp Lights (Cw: Irnwk Not Exceed +Or- 20mm) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Military Road, Freshwater, Isle Of Wight
28 November — 30 November
Delays possible Traffic control (two-way signals)
Works location: Freshwater: : —Military Road-Freshwater
Works description: Reading Of The Inclinometers At Afton Downs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Monkton Street, Ryde, Isle Of Wight
29 November — 01 December
Delays possible Traffic control (multi-way signals)
Works location: Ryde: Junc With St Johns Hill: Monkton Street-Ryde – 4779
Works description: Rebuild The Brick Pit And Reinstate The Frame And Cover. Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Pallance Road, Northwood, Isle Of Wight
28 November — 30 November
Delays possible Traffic control (two-way signals)
Works location: 46 Pallance Road , Cowes, Isle Of Wight
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Planned work about to start

Beatrice Avenue, East Cowes, Isle Of Wight
29 November — 01 December
Delays unlikely Some carriageway incursion
Works location: 28 Beatrice Avenue, East Cowe,S Isle Of Wight
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Planned work about to start

Dodnor Lane, Newport, Isle Of Wight
29 November — 01 December
Delays unlikely Some carriageway incursion
Works location: 32 Dodnor Lane , Newport, Isle Of Wight
Works description: Interin To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Planned work about to start

Firestone Copse Road, Wootton, Isle Of Wight
28 November — 30 November
Delays unlikely Traffic control (give & take)
Works location: Outside Bramley – On Firestone Copse Road, Wootton Bridge, Po33 4lq
Works description: Excavate In The Verge And Carriageway To Install A Carbon Filter Vent At The Manhole
Responsibility for works: Southern Water
Current status: Planned work about to start

Pier Street, Ventnor, Isle Of Wight
29 November — 26 December
Delays unlikely Some carriageway incursion
Works location: Outside The Ventnor Baptist Church.
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

School Lane, Newport, Isle Of Wight
29 November — 12 December
Delays unlikely Some carriageway incursion
Works location: Opp Community Centre
Works description: Excavation In Footway For Removal Of Electric Supply Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Advanced planning

St Marys Road, Cowes, Isle Of Wight
28 November — 18 December
Delays unlikely Some carriageway incursion
Works location: O/S 59
Works description: Skip App – 59 St Marys Road, Cowes – 28/11 – 04/12
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Turf Walk, Totland, Isle Of Wight
29 November — 19 December
Delays unlikely Some carriageway incursion
Works location: Around Pillars Of Turf Walk Footbridge, Totland On Public Footpath T4 Over Madeira Road, Totland
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Vectis Road, East Cowes, Isle Of Wight
29 November — 01 December
Delays unlikely Some carriageway incursion
Works location: 37 Vectis Road, East Cowes, Isle Of Wight
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Planned work about to start

Witbank Gardens, Shanklin, Isle Of Wight
29 November — 07 December
Delays unlikely Some carriageway incursion
Works location: Os 23
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning