Cockleton Lane, Gurnard, Isle Of Wight
06 August — 28 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Gurnar at Gurnard: From Hilton Road To Bay View Road (Ml130071) : Cockleton Lane-Gurnard:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Church Road, Havenstreet, Isle Of Wight
07 August — 29 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:R/H4, Strengthen 30mm Fibrovia And 130mm Foambase-Rural:H4) Havens at Havenstreet: From Havenstreet Main Road To Pondcast Lane (Ml340347) : Church Road-Havenstreet:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 New Road, Brading, Isle Of Wight
07 August — 20 August Some carriageway incursion
Delays possible due to Streetworks
Scaffold (B Ashton Scaffolding) at O/S 4 & 6
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 High Street, Brading, Isle Of Wight
06 August — 10 August No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at C/Way Opp 11, High Street
Responsibility: BT
EToN status: Advanced planning

A3055 New Road, Brading, Isle Of Wight
06 August — 10 August No carriageway incursion
Delays unlikely due to Streetworks
Install 14m Of 1 Way Poly Duct In Verge,Install 1m Of 1 Way Poly Duct In Footway at . Side Of 5, New Road
Responsibility: BT
EToN status: Advanced planning

B3321 Adelaide Grove, East Cowes, Isle Of Wight
06 August — 13 August Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off – So45254 at Os 71
Responsibility: SGN
EToN status: Advanced planning

B3327 Clarence Road, Wroxall, Isle Of Wight
07 August — 20 August Some carriageway incursion
Delays unlikely due to Streetworks
312053 Ventnor 1 – Street Cabinet & Power Installation. Excavate To Lay Approx 8m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 10m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at O/S 5 Clarence Road Wroxall Isle Of
Responsibility: BT
EToN status: Advanced planning

B3341 Medina Avenue, Newport, Isle Of Wight
06 August — 10 August Some carriageway incursion
Delays unlikely due to Streetworks
Fit New Meter Installation In Footway. at 80 Medina Avenue, Newport, Isle Of Wight .
Responsibility: Southern Water
EToN status: Advanced planning

B3399 Limerstone Road, Shorwell, Isle Of Wight
06 August — 07 August Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice Cw For Ha Defect at In C/W And Soft Os Monkspath (Surgery), Limerstone Road
Responsibility: BT
EToN status: Advanced planning

Nelson Street, Ryde, Isle Of Wight
07 August — 13 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sds Scaffolding) at O/S 6
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Old Road, East Cowes, Isle Of Wight
06 August — 19 August Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway To Provide New Electrical Supply To New Properties at From Jcn Of Church Path To Jcn Royal Architects Road
Responsibility: Southern Electric
EToN status: Advanced planning

Paddock Road, Shanklin, Isle Of Wight
06 August — 17 August Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Farside Footway To Site at Os Plot 2
Responsibility: SGN
EToN status: Advanced planning

Partlands Avenue, Ryde, Isle Of Wight
07 August — 11 August Some carriageway incursion
Delays unlikely due to Streetworks
– Fit New Meter Installation In Footway at 20 Partlands Avenue, Ryde, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Woodvale Road, Gurnard, Isle Of Wight
06 August — 07 August No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice Fw For Ha Defect at (Pcp37) Bduk. Outside 10 To Outside 12 On Woodvale Road.
Responsibility: BT
EToN status: Advanced planning

Image: Ell R Brown under CC BY 2.0