Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3056 Sandown Road, Arreton, Isle of Wight
08 January — 01 February
Delays likely due to Streetworks
Temporary speed limit at A3056 Sandown Road, Arreton, Isle of Wight (A3056 Sandown Road, Arreton) 08 January — 01 February
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
A3055 Broadway, Sandown, Isle Of Wight
09 January — 10 January Traffic control (multi-way signals)
Delays likely due to Streetworks
0.45×0.45×40, 0.3×0.3×45 And 0.4×0.4×45, Tm=Give N Take (Cw: Pothole) Sandown at Sandown: At The Traffic Lights Sandwn Heights Leisure Centre: Broadway-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Ventnor Road, Newchurch, Isle Of Wight
08 January — 12 January Traffic control (two-way signals)
Delays possible due to Streetworks
Resurfacing Post Works. Defect Repair To Kerbing. Newchurch at Newchurch: Ml 420140 O/S Little Princelett Cottage: Ventnor Road-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Blackgang Road, Niton, Isle Of Wight
08 January — 21 January Traffic control (give & take)
Delays unlikely due to Streetworks
** Private Job ** Relocation Of Street Lighting Column Niton at Niton: Column 2 – Opposite Bus Shelter (Ml 530034):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3341 Trafalgar Road, Newport, Isle Of Wight
08 January — 14 January Some carriageway incursion
Delays unlikely due to Streetworks
Pls Visit Site And Confirm Site Is Suitable For Scaffolding. at O/S 9
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Chapel Road, Binstead, Isle Of Wight
08 January — 12 January Some carriageway incursion
Delays unlikely due to Streetworks
Interim To Perm Reinstatement at 3 Chapel Road , Ryde, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Eastcliff Road, Shanklin, Isle Of Wight
08 January — 12 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing. Shanklin at Shanklin: Ml 440251 Whole Road: Eastcliff Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Longmead Road, Ryde, Isle Of Wight
08 January — 12 January Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 65 Longmead Road Ryde, Isle Of Wight .
Responsibility: Southern Water
EToN status: Advanced planning
Spring Walk, Newport, Isle Of Wight
08 January — 12 January Some carriageway incursion
Delays unlikely due to Streetworks
Interim To Perm Reinstatement at 31 Spring Walk Newport Isle Of Wight 1
Responsibility: Southern Water
EToN status: Advanced planning
St Michaels Avenue, Ryde, Isle Of Wight
08 January — 12 January Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at 84 St. Michaels Avenue, Ryde, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Wellington Road, Ryde, Isle Of Wight
08 January — 12 January Some carriageway incursion
Delays unlikely due to Streetworks
Interim To Perm Reinstatement at 64 Wellington Road , Ryde, Isle Of Wight
Responsibility: Southern Water
EToN status: Advanced planning
West Hill Road, Ryde, Isle Of Wight
08 January — 18 January No carriageway incursion
Delays unlikely due to Streetworks
Lay New Service From Nearside Footway To Site at Os 28
Responsibility: SGN
EToN status: Advanced planning
Image: Hills_Alive under CC BY 2.0