Cliff Path, Lake – closed to vehicles due to safety reasons
Cliff Path, Lake – closed to pedestrians from Winchester house car park to Skew Bridge path / Lake Cliff Gardens due to safety reasons
Cliff Path, Shanklin – closed to pedestrians between Delphi Road and St Boniface Cliff Road due to safety reasons
Undercliff Drive, Niton – between Mirables (in the west) and Seven Sisters Road (in the east) – closed for safety reasons
East Cowes Esplanade remains closed until further notice for safety reasons

List of roadworks and road closures taking place week starting Monday 13th July as provided by Island Roads.

APSE HEATH:
A3056 Newport Road
(at Branston Cross, outside Headley Grange). Temporary traffic lights will be in operation from 9am until 1pm on Friday 17 July for tree cutting works adjacent to high voltage overhead electric cables by Groundsell Contracting. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT GROUNDSELL CONTRACTING ON 01983 861319

ARRETON:
A3056 Hale Common
(adjacent Hale Common Garage). Temporary traffic lights will be in operation from 9am until 4pm Tuesday 21 July and Wednesday 22 July for hedge / tree cutting works by Groundsell Contracting. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT GROUNDSELL CONTRACTING ON 01983 861319

BEMBRIDGE:
Hillway Road
(outside Chameleon approx. 200 metres east of Common Wood Lane). Temporary traffic lights will be in operation from 9am on Monday 27 July until Tuesday 4 August for the installation of a new gas service by Southern Gas Networks. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN GAS NETWORKS ON 0845 070 1431

BRIGHSTONE:
Main Road
(junction with Moor Lane) Temporary traffic lights will be in operation between 9am on Monday 27 July until 4pm on Wednesday 29 July 2015 for the installation of a new water connection for a new development by Clancy Docwra for Southern Water. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN WATER ON 0845 278 0845

BRIGHSTONE:
Limerstone Road
(from Limerstone Cottage to near junction with Lower Limerstone Lane) Temporary traffic lights will be in operation between 9am on Wednesday 9 July until approx. Monday 13 July 2015 for cable works by Morrison Utilities for British Telecom. Traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT BRITISH TELECOM ON 0800 917

CHALE / BRIGHSTONE / COMPTON
A3054 Military Road
(near Southdown Lane, Grange Chine Filling Station, Compton Bay Car Park and Compton Farm). Temporary traffic lights will be in operation from 9am until 3.30pm on each day (Mondays to Fridays) between Wednesday 15 July and Tuesday 21 July 2015 for drainage works by Island Roads. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

COWES:
Baring Road
will be closed from Ward Avenue to Egypt Hill from 7am until 6pm on Monday 13 July, Tuesday 14 July and if necessary on Wednesday 15 July 2015 The closure is for carriageway and footway repairs, resurfacing, drainage, kerbing and verge works. The alternative route will be: Baring Road, Queens Road and Egypt Hill. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

Baring Road will be closed from Egypt Hill to Woodvale Road on each day (Mondays to Fridays) from 7am until 6pm from approx. Wednesday 15 July until Tuesday 21 July 2015. The closure is for carriageway and footway repairs, resurfacing, drainage, kerbing and verge works. The alternative route will be: Baring Road, Ward Avenue and Crossfield Avenue. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

EAST COWES:
Esplanade
will be closed from 2.30pm on Friday 25 April 2014 for the foreseeable future between 375 metres to the northeast of Cambridge Road and the end of the highway 860 metres to the northeast of Cambridge Road. There is no alternative route for traffic. This closure is necessary to avoid danger to persons or other traffic using the road due to a landslip. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT THE ISLE OF WIGHT COUNCIL ON 01983 821000

FRESHWATER:
A3055 Afton Road
(opposite existing Co-op Store, approx. 100metres from School Green Road Roundabout) Temporary traffic lights will be in operation when required from 9am on Tuesday 7 April until late July 2015 for the construction of a new entrance for the new Co-op Store and Civic Amenity Site by Brymor and John Peck Construction. Traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT BRYMOR ON 023 92261515

A3055 School Green Road (outside106). Temporary traffic lights will be in operation from 9am on Monday 27 July until approx. Tuesday 4 August 2015 for the installation of a new gas service by Southern Gas Networks. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN GAS NETWORKS ON 0845 070 1431

GODSHILL:
A3020 High Street
(near junction with Church Hollow) Temporary traffic lights will be in operation from 9am until 3.30pm on Monday 13 July and Tuesday 14 July 2015 for tree cutting works by Nigel Early Services Ltd. Traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT NIGEL EARLEY SERVICES ON 01983 531434

GURNARD:
Worsley Road
(outside 44) Temporary traffic lights will be in operation between 9am on Monday 20 July until 4pm on Friday 31 July 2015 for the installation of a new water connection by Clancy Docwra for Southern Water. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN WATER ON 0845 278 0845

HAVENSTREET:
Combley Road
(500 metres below access road to Lynn Farm). Temporary traffic lights will be in operation from 9am until 4pm on Wednesday 22 July for tree cutting works adjacent to high voltage overhead electric cables by Groundsell Contracting. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT GROUNDSELL CONTRACTING ON 01983 861319

Rowlands Lane will be closed from 7am until 6pm on each day between Wednesday 15 July and Wednesday 29 Jul 2015 from Pondcast Lane to Mersley Down Road. The closure is for carriageway and footway repairs, resurfacing, drainage, kerbing and verge works by Island Roads. The route for diverted traffic will be; Stroud Wood Road, Carters Road, Ashey Road and Mersley Down Road. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

LAKE:
Ranalagh Road / Cliff Road / Cliff Path.
From 1200hrs on Friday 18 July 2014 for the foreseeable future the following roads / path will be closed to vehicular traffic: Cliff Road / Cliff Path will be closed from point 55 metres to the northwest of the junction with Ranalagh Road to point 185 metres to the south west of the junction with Cliff Gardens (the southern boundary of number 6). Ranalagh Road will also be closed from Cliff Road to a point 10 metres to the west of Cliff Road. During the period of closure there is no alternative route for vehicles. The closure is required due to erosion. Pedestrian access will be maintained as usual. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

NEWPORT:
Briddlesford Road
(near to bend approx. 300 metres on the Wootton side of Lynn bottom Civic Amenity site). Temporary traffic lights will be in operation from 9.30am until 3.30pm on approx. one day or two days between Tuesday 14 July and Thursday 16 July 2015 for installation of hazard marker posts by Island Roads. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

Mill Street will be closed from 9am on Monday 30 March until approx. 6pm on Friday 17 July 2015 between Old Westminster Lane and the end of the highway 35 metres to the Northwest. The closure is necessary for highway development works including the construction of a new junction onto Foxes Road by Aeropark Developments for Barrett Homes. There is no diversion route for traffic, however vehicular access will be maintained as far as possible. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT AEROPARK DEVELOPMENTS LTD ON
023 80227712

Betty Haunt Lane will be closed from A3054 Forest Road B3401 Calbourne Road between 7am and 6pm on each day (Mondays to Fridays) from Tuesday 7 July until Tuesday 14 July 2015. The closure is for carriageway and footway repairs, resurfacing, drainage, kerbing and verge works by Island Roads. The alternative route will be; A3054 Forest Road, Gunville Road, Priory Road, B3401 High Street, Carisbrooke and Calbourne Road FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

Public Footpath N120 will be closed to pedestrians from 6am on Friday 6 March until 6am on Sunday 6 September 2015 between; A point 474 metres north to a point 516 metres north of the northern boundary of Seaclose Recreation Ground and a point 585 metres north to a point 607 metres north of the northern boundary of Seaclose Recreation Ground. The diversion route for pedestrians is through adjacent woodland at each location. Local path closures are required in the interests of pedestrian safety whilst footbridges are closed at the Footbridge B319 at South Fairlee Farm and the Footbridge B318 at The Roundhouse. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

Shide Road will be closed from St Johns Road to Medina Avenue between 7am and 5pm on each day (Mondays to Fridays) from Monday 13 July for approx. 1 to 2 weeks. The closure is for carriageway and footway repairs, resurfacing, drainage, kerbing and verge works by Island Roads. The alternative route for traffic is; St Johns Road, Medina Avenue, St Georges Approach, and A3020 St Georges Way. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

RYDE:
The Strand
will be closed between East Street and West Hill Road from 9am on Friday 21 November 2014 until Friday 21 August 2015. The closure is for a Sewer Flood Alleviation Scheme to upsize the existing sewer pipeline. The diversion route will be; West Street, Dover Street and Esplanade. Works are due to start near to the junction with West Hill Road. Temporary traffic lights will be in operation when necessary from Monday 17 November 2014 until the end of the scheme. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN WATER ON 0845 278 0845

RYDE:
Simeon Street
will be closed from 9am on Monday 9 March until 4pm on Friday 25 September 2015 between The Strand and Monkton Street. The diversion route will be: The Strand and Monkton Street. The closure is for a sewer flood alleviation scheme to upsize a sewer pipeline. Access to premises and businesses will be maintained from one end of the road as far as possible during the works. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN WATER ON 0845 278 0845

Monkton Street will be closed from 9am on Wednesday 20 May until 4pm on Friday 7 August 2015 between The Strand and Simeon Street. Note these are revised closure dates. The diversion route will be: The Monkton Street, East Street and The Strand. The closure is for a sewer flood alleviation scheme to upsize a sewer pipeline. Access to premises and businesses will be maintained from one end of the road as far as possible during the works. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN WATER ON 0845 278
0845

Union Road will be closed from 9am on Wednesday 15 July until 4.30pm on Friday 17 July 2015 between Cross Street and Castle Street. The closure is for the installation of a new gas service at the rear of 29A Union Street. During the works the one way restriction in Castle Street between Union Road and George Street will be reversed from a south east bound direction to a North West bound direction to allow access to premises in Castle Street and lower Union Road. The alternative route will be: Cross Street, Union Street, Esplanade and George Street. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN GAS NETWORKS ON 0845 070 1431

SANDOWN:
A3055 Avenue Road
(junction with Perowne Way at Sandown Railway Bridge) Temporary traffic lights will be in operation from 11.30pm on Tuesday 14 July until approx. 5am on Wednesday 15 July 2015 for bridge maintenance works by Southwest Trains. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHWEST TRAINS ON 07824 597389

Wilkes Road will be closed from High Street to Town Lane and Town Lane will be closed from York Road to Wilkes Road between 8am on Friday 3 July and approx. 5pm on Friday 17 July 2015 for the installation of utility service connections by Scottish and Southern Energy and Clancy Docwra for Southern Water. The diversion route will be: High Street, St Johns Road and York Road. The one way restrictions in Wilkes Road and Town lane will be temporarily suspended to allow vehicular access from one end of the road as far as possible during the works. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT THE SOUTHERN ELECTRIC CALL CENTRE ON 0845 770 8090 OR SOUTHERN WATER ON 0845 278 0845

SHALFLEET:
A3054 between Hampstead Lodge and Stick Cottage.
Temporary traffic lights will be in operation from 7.30pm until 11pm on Monday 13 July and Tuesday 14 July 2015 for edge of carriageway works by Island Roads. Traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

SHANKLIN:
A3055 Church Road (outside 24)
Temporary traffic lights will be in operation from 9am on Wednesday 22 July until approx. Thursday 30 July gas service alteration works by Southern Gas Networks. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN GAS NETWORKS ON 0845 070 1431

Cliff Path will be closed from 9.30am on Monday 20 January 2014 for the foreseeable future to pedestrians from Skew Bridge Path to Winchester House Car Park. The closure is required due to erosion/ land movement. During the period of closure the alternative route for pedestrians will be; Skew Bridge Path, A3055 Sandown Road and Winchester House Car Park. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

Bonchurch Road / Cowleaze Hill, Shanklin will be closed from 7.30pm until 6am on each night (Mondays to Fridays) between Monday 6 July and Tuesday 14 July 2015 from Luccombe Chine House Access Road, to Church Road. The closure is for carriageway and footway repairs, resurfacing, drainage, kerbing and verge works by Island Roads. The alternative route for traffic is A3055 Leeson Road, B3327 St Boniface Road, Mitchell Avenue, Ocean View Road, Newport Road, Clarence Road, High Street and St Johns Road, A3020 Godshill Road and Victoria Avenue, A3055 High Street and Church Road. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

ST LAWRENCE:
A3055 Undercliff Drive
will remain closed from St Catherine’s Road to Seven Sisters Road (Western Junction), between Barrington Lodge, near to the western junction with Seven Sisters Road and Mirables which is located about a mile towards Niton. Following significant ground movement in the area in early February 2014, Undercliff Drive has been physically closed between Mirables (in the west) and a point 560 metres to the West of Seven Sisters Road (in the east) for safety reasons. There is now no access for vehicles or pedestrians.
A formal road and footpath closure will be in operation for the foreseeable future. Access to businesses and attractions in Undercliff Drive will be maintained. During the period of closure the alternative route for traffic will be; Pedestrians; A3055 Undercliff Drive, Public Footpath V81, V77, NT28, NT29, NT30 and A3055 Undercliff Drive. Cyclists and Equestrians; A3055 Undercliff Drive, Seven Sisters Road, St Lawrence Shute, Whitwell Road, Ventnor Road, High Street (Whitwell), Kemming Road, Chatfield Road, Rectory Road, High Street (Niton), Institute Hill, Barrack Shute and A3055 Undercliff Drive. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

VENTNOR:
Longdown Steps Public Footpath V102
will be closed from 10am on Monday 12 May 2014 for the foreseeable future between South Street and St Catherine’s Street. This closure is necessary to avoid danger to persons using the footpath until wall repair works have been undertaken. The diversion route for pedestrians will be; South Street, West Street, High Street, Victoria Street, Wheelers Bay Road and St Catherine’s Street. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

Castle Road (between Zig Zag Road and Gills Cliff Road) Temporary traffic lights will be in operation from Tuesday 30 December 2014 until approx. mid November 2015 until retaining wall works have been completed by Island Roads. Traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

WOOTTON:
A3054 Lushington Hill
will be closed from 7.30pm until 6am on each night (Mondays to Fridays) between Wednesday 15 July 2015 and Tuesday 28 July 2015 from Racecourse Roundabout to Palmers Road. The closure is for carriageway and footway repairs, resurfacing, drainage, kerbing and verge works by Island Roads. The alternative route for traffic is A3054 Racecourse, Fairlee Road, Staplers Road, Whiterails Road, Station Road and A3054 High Street. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440

A3054 High Street (outside 49, near junction with Brannon Way). Temporary traffic lights will be in operation from 9am on Monday 13 July until approx. 4.30pm on Wednesday 15 July 2015 for gas service disconnection works by Southern Gas Networks. It is programmed that the temporary lights should only be in operation from 9am until 4pm on each day. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT SOUTHERN GAS NETWORKS ON 0845 070 1431

YAVERLAND:
B3329 Yaverland Road
(outside Yaverland Manor Farm) Temporary traffic lights will be in operation from 9am until approx. 4pm on each day between Wednesday 15 July until Friday 17 July 2015 for fencing replacement works by W Stay & Son Ltd. Some traffic delays will occur. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT W STAY & SON ON 01983 407077