road closed signs

Isle of Wight roadworks and road closures 14th December 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

You can also check ongoing current works by visiting the Island Roads Website.

Hale Common, Arreton, Isle Of Wight
14 December — 16 December
Delays likely Traffic control (two-way signals)
Works location: Arreton: Ml 410066 Betwen Wall Ridge House And The Suzuki Garage.: Hale Common-Arreton
Works description: Eurovia Surfacing Post Works. Carry Out Repairs To / Replacement Of Noisy Manhole Cover Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Main Road, Porchfield, Isle Of Wight
14 December — 16 December
Delays possible Traffic control (two-way signals)
Works location: Porchfield: Porchfield Bridge: Porchfield—C2 Road Porchfield Village
Works description: Coring Works – Infomation Required For Furture Works Porchfield
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Sea Street, Newport, Isle Of Wight
14 December — 16 December
Delays possible Traffic control (two-way signals)
Works location: Outside 28 Sea Street, Newport, Po30 5bw
Works description: Excavate In The Carriageway To Repair Collapsed Sewer Pipe
Responsibility for works: Southern Water
Current status: Planned work about to start

St James Street, Newport, Isle Of Wight
14 December — 29 December
Delays possible Some carriageway incursion
Works location: O/S 84 – O/S 87
Works description: Excavation Of Joint Hole In Footway To Disconnect Redundant Electrical Service Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Planned work about to start

St James Street, Newport, Isle Of Wight
14 December — 20 December
Delays possible Some carriageway incursion
Works location: Outside Santander On Corner Of St James And Pyle Street.
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

St Johns Road, Wroxall, Isle Of Wight
15 December — 19 December
Delays possible Traffic control (two-way signals)
Works location: Cooks Castle Farm, St. Johns Road , Wroxall,Iow.
Works description: Reinstate Private Access Road.Traffic Lights Required To Park Vehicles Safely.
Responsibility for works: Southern Water
Current status: Planned work about to start

Alfred Street, East Cowes, Isle Of Wight
14 December — 17 January 2017
Delays unlikely Some carriageway incursion
Works location: 37
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Castle Court, Ventnor, Isle Of Wight
14 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Ventnor: From Junction With Castle Close, 240m, Ml 540256: Castle Court-Ventnor
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Castle Road, Ventnor, Isle Of Wight
14 December — 16 December
Delays unlikely Some carriageway incursion
Works location: Pegasus, Castle Road , Ventnor, Isle Of Wight.
Works description: Excavate Test Hole For Soil Sample Before Main Laying Starts
Responsibility for works: Southern Water
Current status: Planned work about to start

Gills Cliff Road, Ventnor, Isle Of Wight
14 December — 16 December
Delays unlikely Some carriageway incursion
Works location: 50 Gills Cliff Road , Ventnor, Isle Of Wigh
Works description: Excavate Test Hole To Get Soil Sample Before Mainlaying Starts,
Responsibility for works: Southern Water
Current status: Planned work about to start

High Street, Ryde, Isle Of Wight
15 December — 30 December
Delays unlikely Some carriageway incursion
Works location: From O/S 111 High St To O/S 115 High Street
Works description: Excavation Of Joint Hole In Footway To Connect 2 New Properties In Bank Gardens
Responsibility for works: Southern Electric
Current status: Planned work about to start

St Albans Road, Ventnor, Isle Of Wight
14 December — 16 December
Delays unlikely Some carriageway incursion
Works location: The Roof Tree, St. Albans Road , Ventnor, Isle Of Wight.
Works description: Excavate Test Hole Before Main Laying Starts
Responsibility for works: Southern Water
Current status: Planned work about to start

Wilkes Road, Sandown, Isle Of Wight
15 December — 12 January 2017
Delays unlikely Some carriageway incursion
Works location: 4 Wilks Road Sandown
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start

Image: stewdean under CC BY 2.0