Road works road closed signs

Isle of Wight roadworks and road closures 22nd November 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

Parkhurst Road, Newport, Isle Of Wight
22 November — 24 November
Delays likely Lane closure
Works location: Newport: Newport Bound Lane In The Pedestrian Crossing Point.: Parkhurst Road-Newport
Works description: 28 Day Perm Required Sawcut And Infill Idr- C/W Defect X 1 Cat 1 Pothole. 2 Hour Response Required. .90 X .30 X 40mm Tm- Stop/Go Works Boards Or Lane Closure Advised. (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Forest Road, Newport, Isle Of Wight
22 November — 24 November
Delays possible Traffic control (multi-way signals)
Works location: Newport: Jct With Whitehouse Road.: Forest Road-Newport
Works description: 3 Damaged Kerbs On The Bend Require Replacing With New Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alfred Street, East Cowes, Isle Of Wight
23 November — 01 December
Delays unlikely Some carriageway incursion
Works location: Os 38
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Downside, Ventnor, Isle Of Wight
22 November — 05 December
Delays unlikely Some carriageway incursion
Works location: Os 7
Works description: Lay New Service From Farside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Pier Street, Ventnor, Isle Of Wight
23 November — 29 November
Delays unlikely Some carriageway incursion
Works location: 9-11
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Queens Road, Sandown, Isle Of Wight
22 November — 01 December
Delays unlikely Some carriageway incursion
Works location: Os Flat 3 Napoli Court
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Sandown And Shanklin Footpath 70, Shanklin, Isle Of Wight
23 November — 06 December
Delays unlikely No carriageway incursion
Works location: From Jct Arthurs Hill To O/S 4 Culver Road
Works description: Excavation Of Joint Hole In Footpath To Install New Electrical Supplies To No. 2. Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Advanced planning

St Wilfred Drive, East Cowes, Isle Of Wight
22 November — 24 November
Delays unlikely No carriageway incursion
Works location: Outside 6, St Wilfred Drive
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S),Install 4m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Steephill Court Road, Ventnor, Isle Of Wight
23 November — 02 December
Delays unlikely Traffic control (give & take)
Works location: Ventnor: From Junction With Undercliff Drive To Pelham Road, 247m, Ml 540311: Steephill Court Road-Ventnor
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Vereker Drive, East Cowes, Isle Of Wight
22 November — 24 November
Delays unlikely No carriageway incursion
Works location: O/S 13, Vereker Drive
Works description: Build 1 Precast Jointing Chamber (725mm X 225mm) 600mm Dep,Install 1m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

West Street, Ryde, Isle Of Wight
23 November — 25 November
Delays unlikely No carriageway incursion
Works location: (Pcp1) Outside 13 West Street Isle Of Wight, Po33 2qg., West Street
Works description: Install 7m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Image: Stew Dean under CC BY 2.0