Road cones:

Isle of Wight roadworks and road closures 23rd March 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Horsebridge Hill, Newport, Isle Of Wight
23 March — 23 May
Delays likely Road closure
Works location: Newport: Ml 210023 From The Junctions Of Hogan Close To Nicholson Street: Horsebridge Hill-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 St Georges Way, Newport, Isle Of Wight
23 March — 24 March
Delays likely Lane closure
Works location: Newport: 15m Past The Bridge To Cineworld At The Side Of The Cowes Lane: St Georges Way-Newport
Works description: Idr – Gully Cover Has Sunk And Is Breaking Out Rebed To Level Tm – Lane Closure (Cw: Irnwk Not Exceed +Or- 20mm) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
24 March — 30 March
Delays likely Traffic control (give & take)
Works location: Newport: Adjacent To South Of Fairlee Road Lay-By (Ml 210052):
Works description: Replacement Of N� 2 Signs (2 X Speed Restriction) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Racecourse, Newport, Isle Of Wight
24 March — 30 March
Delays likely Traffic control (give & take)
Works location: Newport: From Binfield Corner, East To Lushington Hill (Ml 210055, Ml 210057 & Ml 310001):
Works description: Replacement Of N� 6 Signs (2 X Speed Restriction & 4 X Turn Left) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3326 Monkton Street, Ryde, Isle Of Wight
23 March — 23 May
Delays likely Road closure
Works location: Ryde: From Park Road To Mellville Street (Ml330246): Monkton Street-Ryde:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
24 March — 24 May
Delays likely Road closure
Works location: Newchurch: From Parkway 315m South Thereof (Ml 430143): Alverstone Road-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) (Kerbed=Inlay/Unkerbed=Overlay) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
24 March — 24 May
Delays likely Road closure
Works location: Newchurch: From Parkway To Forest Road (Ml 430144): Alverstone Road-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) (Kerbed=Inlay/Unkerbed=Overlay) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
24 March — 24 May
Delays likely Road closure
Works location: Newchurch: From Newport Road, Aspe Heath 305m North Thereof (Ml 430142): Alverstone Road-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) (Kerbed=Inlay/Unkerbed=Overlay) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3326 Melville Street, Ryde, Isle Of Wight
23 March — 24 March
Delays possible Traffic control (Stop/Go boards)
Works location: Side Of 11 Melville Street, Ryde, Isle Of Wight
Works description: Ryde (Pcp 13) Remedial Works To Rectify Ha Defect In Carriageway
Responsibility for works: BT
Current status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
23 March — 29 March
Delays possible Traffic control (Stop/Go boards)
Works location: Frm In F/W 43m North East Frm Rear Of 1 Redwing Quay To Across C/W To In F/W 43m North East Frm Opp Rear Of 1 Redwing Qu
Works description: Install 3m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

A3055 Albert Street, Ventnor, Isle Of Wight
23 March — 24 March
Delays unlikely Some carriageway incursion
Works location: S/O 59 Albert Street,Ventnor, Po38 1eu
Works description: Ventnor (13) Remedial Works To Rectify Ha Defect In Carriageway,
Responsibility for works: BT
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
24 March — 08 April
Delays unlikely Some carriageway incursion
Works location: From O/S 18 To O/S 26
Works description: Excavation Of Joint Bay In Footway To Provide A New Electrical Supply To New Properties. Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Advanced planning

A3055 Pier Street, Ventnor, Isle Of Wight
24 March — 06 April
Delays unlikely Some carriageway incursion
Works location: 29
Works description: Scaff. App. 29 Pier Street, 24/03 – 06/04
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Foreland Road, Bembridge, Isle Of Wight
24 March — 06 April
Delays unlikely Some carriageway incursion
Works location: O/S 42
Works description: Skip App. 42 Foreland Road, Bembridge 24/03-06/04
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399 Presford Shute, Shorwell, Isle Of Wight
24 March — 30 March
Delays unlikely Some carriageway incursion
Works location: Entrance To Preston Farm To Opp Preston Farm, Presford Shute
Works description: Install 29m Of 1 Way Poly Duct In Verge,Install 5m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Elm Lane, Calbourne, Isle Of Wight
24 March — 30 March
Delays unlikely Some carriageway incursion
Works location: O/S Calbourne Garage, Elm Lane
Works description: Install 2m Of 1 Way Poly Duct In Carriageway,Install 5m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
24 March — 30 March
Delays unlikely Some carriageway incursion
Works location: 97
Works description: Skip App. 97 Gunville Road – 24/03 – 30/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Common Wood Lane, Bembridge, Isle Of Wight
23 March — 29 March
Delays unlikely Some carriageway incursion
Works location: Five Oaks ,Hillway Road, Bembridge, Isle Of Wight.
Works description: Install Logging Kiosk In Verge Next To Pressure Reducing Valve Chamber.
Responsibility for works: Southern Water
Current status: Advanced planning

Dracaena Gardens, Shanklin, Isle Of Wight
23 March — 05 April
Delays unlikely Some carriageway incursion
Works location: Os 3
Works description: Relay Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Sandown And Shanklin Footpath 70, Shanklin, Isle Of Wight
23 March — 29 March
Delays unlikely Some carriageway incursion
Works location: 1 Culver Road , Shanklin, Isle Of Wight .
Works description: Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning

Westwood Road, Ryde, Isle Of Wight
24 March — 21 April
Delays unlikely Traffic control (give & take)
Works location: Jnc Of Queens Road And Westwood Road To 40 Westwood Road. Cgwy / Ftwy & Verge
Works description: Relay Mains And Services
Responsibility for works: SGN
Current status: Advanced planning

Winston Avenue, Binstead, Isle Of Wight
24 March — 30 March
Delays unlikely Some carriageway incursion
Works location: O/S 13
Works description: Skip Ap. 13 Winston Ave – 24/03 – 30/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Woodlands Crescent, Wootton, Isle Of Wight
23 March — 04 April
Delays unlikely Some carriageway incursion
Works location: Os 23
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Image: Hills_Alive under CC BY 2.0