A3020 Horsebridge Hill, Newport, Isle of Wight
01 December — 04 December
Delays likely Traffic control (multi-way signals)
Works location: O/S 88 Horsebridge Hill on Junction of Noke Common with Horsebridge Hill
Works description: NEWPORT 454794 – Renew / Raise / Lower Frame and Cover – RENEW JOINT BOX OR M/H FRAME AND COVER
Responsibility for works: Openreach
Current status: Planned work about to start
A3054 Fairlee Road, Newport, Isle of Wight
30 November — 04 December
Delays likely Traffic control (two-way signals)
Works location: 163 FAIRLEE ROAD, NEWPORT, ISLE OF WIGHT
Works description: – Remedial reinstatement,self defect,patch has sunk
Responsibility for works: SOUTHERN WATER
Current status: Planned work about to start
A3054 Main Road, Ningwood, Shalfleet, Isle of Wight
01 December — 01 December
Delays likely Traffic control (two-way signals)
Works location: FROM OUTSIDE No.2 TO OUTSIDE BARNFIELD FARM
Works description: REPLACING O/H WIRES AND LV POLES
Responsibility for works: SCOTTISH & SOUTHERN ELECTRICITY NETWORKS
Current status: Planned work about to start
A3055 Broadway, Sandown, Isle of Wight
02 December — 03 December
Delays likely Traffic control (two-way signals)
Works location: SANDOWN : ML410045 : Broadway-Sandown
Works description: Snagging – Aj and Paco of 1 x 3 BT covers SANDOWN
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Albany Road, Newport, Isle of Wight
01 December — 05 December
Delays likely Road closure
Works location: NEWPORT : Between Albany road and Worsley road. : Albany Road-Newport
Works description: pothile repairs
Responsibility for works: Isle of Wight
Current status: Planned work about to start
B3329,A3055 Avenue Road, Sandown, Isle of Wight
30 November — 04 December
Delays likely Traffic control (multi-way signals)
Works location: OS 157
Works description: Replace damaged valve box
Responsibility for works: SOUTHERN GAS NETWORKS PLC
Current status: Planned work about to start
Church Road, Binstead, Isle of Wight
30 November — 04 December
Delays likely Road closure
Works location: BINSTEAD : From Pitts Lane to Quarr Road (ML340503) : Church Road-Binstead
Works description: Carriageway reconstruction, planing and resurfacing. Remedial BINSTEAD
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Kern Lane, Newchurch, Isle of Wight
01 December — 05 December
Delays likely Road closure
Works location: NEWCHURCH : On the bend o/s Chiddles Farm complex : Kern Lane-Newchurch
Works description: drainage works
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Puckpool Hill, Seaview, Isle of Wight
01 December — 05 December
Delays likely Road closure
Works location: SEAVIEW : ML330376 – Between Thornton Cross and Entrance of Harcourt Sands : Puckpool Hill-Seaview
Works description: Carriageway reconstruction and surfacing SEAVIEW
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Puckpool Hill, Seaview, Isle of Wight
01 December — 05 December
Delays likely Road closure
Works location: SEAVIEW : ML330378 : Puckpool Hill-Seaview
Works description: Carriageway reconstruction and surfacing SEAVIEW
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Works reference: RF102BT0501000017183
Puckpool Hill, Seaview, Isle of Wight
01 December — 05 December
Delays likely Road closure
Works location: SEAVIEW : ML330377 – From Harcout Sands : Puckpool Hill-Seaview
Works description: Carriageway reconstruction and surfacing SEAVIEW
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Rowridge Lane, Newport, Isle of Wight
01 December — 05 December
Delays likely Road closure
Works location: NEWPORT : Starting at the farm end and working towards the main road : Rowridge Lane-Newport
Works description: pothole repairs
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Works reference: RF101BT0103000017117
The Grove, Ventnor, Isle of Wight
30 November — 01 December
Delays likely Road closure
Works location: VENTNOR : CP070 – The Grove Car Park : The Grove-Ventnor
Works description: Resurfacing Overlay VENTNOR
Responsibility for works: Isle of Wight
Current status: Planned work about to start
A3055 Afton Road, Freshwater, Isle of Wight
30 November — 14 December
Delays possible Traffic control (two-way signals)
Works location: FRESHWATER : from Nashville house to Oakwood House ML 620057 : Afton Road-Freshwater
Works description: Footway re- construction and surfacing ML620057 FRESHWATER
Responsibility for works: Isle of Wight
Current status: Planned work about to start
A3055 The Avenue, Totland, Isle of Wight
30 November — 04 December
Delays possible Traffic control (multi-way signals)
Works location: JUNCTION OF FAIRFIELD WAY & THE AVENUE, PO39 0EF
Works description: FRESHWATER – 443997 – NEW SITE PROVISION – Lay approx 12Mm of Duct 54/56 in CWAY, FWAY & SOFT to link existing BT Boxes to facilitate spine cabling works.
Responsibility for works: Openreach
Current status: Planned work about to start
B3323 St James Street, Newport, Isle of Wight
01 December — 21 December
Delays possible Some carriageway incursion
Works location: Outside 79 (Island Photo Centre).
Works description: SCAFFOLD – SPR Scaffolding
Responsibility for works: Isle of Wight
Current status: Planned work about to start
B3329,A3055 Avenue Road, Sandown, Isle of Wight
30 November — 04 December
Delays possible Some carriageway incursion
Works location: 115 AVENUE ROAD, SANDOWN, ISLE OF WIGHT
Works description: – RENEW STOP TAP
Responsibility for works: SOUTHERN WATER
Current status: Planned work about to start
Castle Road, Wroxall, Isle of Wight
30 November — 02 December
Delays possible Traffic control (Stop/Go boards)
Works location: FROM OUTSIDE No.LONGBRIDGE TO OUTSIDE THORNBANK
Works description: REPLACING O/H WIRES AND LV POLE
Responsibility for works: SCOTTISH & SOUTHERN ELECTRICITY NETWORKS
Current status: Planned work about to start
Fairfield Way, Totland, Isle of Wight
30 November — 04 December
Delays possible Traffic control (multi-way signals)
Works location: JUNCTION OF FAIRFIELD WAY & THE AVENUE, PO39 0EF
Works description: FRESHWATER – 443997 – NEW SITE PROVISION – Lay approx 7m of Duct 54/56 in CWAY, FWAY to link existing BT Boxes to facilitate spine cabling works.
Responsibility for works: Openreach
Current status: Planned work about to start
High Street, Whitwell, Isle of Wight
02 December — 02 December
Delays possible Traffic control (Stop/Go boards)
Works location: FROM O/S CAVALLET TO O.S THE ELMS
Works description: REPLACING O/H WIRES AND LV POLE
Responsibility for works: SCOTTISH & SOUTHERN ELECTRICITY NETWORKS
Current status: Planned work about to start
Lower Church Road, Gurnard, Isle of Wight
30 November — 13 December
Delays possible Traffic control (two-way signals)
Works location: GURNARD: From Solent View Road to Bay View Road, 300m, ML 130070: Lower Church Road-Gurnard
Works description: Footway reconstruction and surfacing GURNARD
Responsibility for works: Isle of Wight
Current status: Planned work about to start
School Lane, Newport, Isle of Wight
30 November — 04 December
Delays possible Traffic control (Stop/Go boards)
Works location: FROM OUTSIDE No.6 TO OUTSIDE No.18
Works description: REPLACING O/H WIRES AND LV POLES
Responsibility for works: SCOTTISH & SOUTHERN ELECTRICITY NETWORKS
Current status: Planned work about to start
West Street, Wroxall, Isle of Wight
30 November — 04 December
Delays possible Traffic control (Stop/Go boards)
Works location: FROM O/S 58 TO O/S 30
Works description: REPLACING OVERHEAD WIRES AND LV POLES.
Responsibility for works: SCOTTISH & SOUTHERN ELECTRICITY NETWORKS
Current status: Planned work about to start
A3021 Castle Street, East Cowes, Isle of Wight
02 December — 03 December
Delays unlikely Traffic control (give & take)
Works location: Adjacent to Entrance to Waitrose, in CASTLE STREET IN FOOTWAY ONLY
Works description: Connection to Cadent Gas main to provide new gas supply to new housing development, approx dimensions: 1m x 1m footway, 5m x 0.5m footway. Depth 0.8m – Vehicle will be parked onsite.
Responsibility for works: FULCRUM PIPELINES LIMITED
Current status: Planned work about to start
Ashey Road, Ryde, Isle of Wight
01 December — 05 December
Delays unlikely Some carriageway incursion
Works location: JUNC WITH SWANMORE ROAD ON ASHEY ROAD
Works description: RYDE 450226 – Overlay – Lay approx 1m of Duct 54/56 in FWAY to link existing BT Boxes to facilitate spine cabling works.
Responsibility for works: Openreach
Current status: Planned work about to start
B3327 St Johns Road, Wroxall, Isle of Wight
30 November — 04 December
Delays unlikely Some carriageway incursion
Works location: BANK COTTAGE, ST. JOHNS ROAD, WROXALL, IOW.
Works description: – RECONNECT WATER SUPPLY
Responsibility for works: SOUTHERN WATER
Current status: Planned work about to start
Coxs Green, Sandown, Isle of Wight
30 November — 01 December
Delays unlikely Some carriageway incursion
Works location: 51-55
Works description: SANDOWN – 435673 – Remedial Works – Remedial Works to clear HA defect in fw
Responsibility for works: Openreach
Current status: Planned work about to start
Crescent Road, Sandown, Isle of Wight
30 November — 01 December
Delays unlikely Some carriageway incursion
Works location: S/O 7 ON CRESCENT ROAD
Works description: SANDOWN 378787 – Remedial reinstatement – – to clear Highway Defect IN fw
Responsibility for works: Openreach
Current status: Planned work about to start
Dolcroft Road, Rookley, Isle of Wight
01 December — 07 December
Delays unlikely Some carriageway incursion
Works location: 23 dolcroft road
Works description: SKIP – Westridge
Responsibility for works: Isle of Wight
Current status: Planned work about to start
Grange Road, Shanklin, Isle of Wight
30 November — 01 December
Delays unlikely Some carriageway incursion
Works location: FROM JUNCTION OF HIGH STREET & GRANGE ROAD CONTINUE TO APRX 29M SW ON GRANGE ROAD
Works description: SHANKLIN – 367365 – Remedial Works HA – to clear Highway Defect IN Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Hurst Hill, Totland, Isle of Wight
01 December — 08 December
Delays unlikely Some carriageway incursion
Works location: os YHA
Works description: Relay service from nearside footway to site
Responsibility for works: SOUTHERN GAS NETWORKS PLC
Current status: Planned work about to start
Station Avenue, Sandown, Isle of Wight
30 November — 04 December
Delays unlikely Some carriageway incursion
Works location: 61A STATION AVENUE, SANDOWN, ISLE OF WIGHT
Works description: INSTALL WATER CONNECTION FOR NEW HOUSE.
Responsibility for works: SOUTHERN WATER
Current status: Planned work about to start
Swanmore Road, Ryde, Isle of Wight
01 December — 05 December
Delays unlikely Some carriageway incursion
Works location: O/S 50 to 51 on SWANMORE ROAD, RYDE, PO33 2TQ
Works description: RYDE 450226 – Overlay – Lay approx 16Mm of Duct 54/56 in FWAY to link existing BT Boxes to facilitate spine cabling works.
Responsibility for works: Openreach
Current status: Planned work about to start